{"paper":{"title":"First results of the new endcap TOF commissioning at BESIII","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["hep-ex"],"primary_cat":"physics.ins-det","authors_text":"Cheng Li, Hongliang Dai, Jie Zhang, Jinzhou Zhao, Kejun Zhu, Meihang Xu, Mei Ye, Mingming Chen, Ping Cao, Qi An, Rongxing Yang, Shengsen Sun, Shubin Liu, Siyu Wang, Weijia Sun, Wenxuan Gong, Xiaolan Luo, Xiaolu Ji, Xiaoshan Jiang, Xiaoyan Ma, Xiaozhuang Wang, Yongjie Sun, Yuekun Heng, Yun Wang, Zhen-an Liu, Zhi Wu","submitted_at":"2016-05-05T22:24:21Z","abstract_excerpt":"The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper."},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1605.01780","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}