{"paper":{"title":"Influence of the magnetic filter field topology on the beam divergence at the ELISE test facility","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["physics.acc-ph"],"primary_cat":"physics.plasm-ph","authors_text":"D. W\\\"underlich, M. Barbisan, U. Fantz","submitted_at":"2022-11-07T08:34:16Z","abstract_excerpt":"The ELISE test facility hosts a RF negative ion source, equipped with an extraction system which should deliver half the current foreseen for the ITER Neutral Beam Injector, keeping the ratio of co-extracted electrons to ions below 1. An important tool for the suppression of the co-extracted electrons is the magnetic filter field, produced by a current flowing in the plasma grid, the first grid of the 3 stage extraction system. To boost the source performances new concepts for the production of the magnetic filter field have been tested, combining the existing system with permanent magnets att"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2211.04273","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2211.04273/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}