{"paper":{"title":"Time-optimal Point-to-point Motion Planning: A Two-stage Approach","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.SY","eess.SY"],"primary_cat":"cs.RO","authors_text":"Jan Swevers, Shuhao Zhang","submitted_at":"2024-03-06T09:34:27Z","abstract_excerpt":"This paper proposes a two-stage approach to formulate the time-optimal point-to-point motion planning problem, involving a first stage with a fixed time grid and a second stage with a variable time grid. The proposed approach brings benefits through its straightforward optimal control problem formulation with a fixed and low number of control steps for manageable computational complexity and the avoidance of interpolation errors associated with time scaling, especially when aiming to reach a distant goal. Additionally, an asynchronous nonlinear model predictive control (NMPC) update scheme is "},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2403.03573","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2403.03573/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}