{"paper":{"title":"Robust Line Planning in case of Multiple Pools and Disruptions","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":[],"primary_cat":"cs.GT","authors_text":"Apostolos Bessas, Christos Zaroliagis, Spyros Kontogiannis","submitted_at":"2011-01-14T11:04:13Z","abstract_excerpt":"We consider the line planning problem in public transportation, under a robustness perspective. We present a mechanism for robust line planning in the case of multiple line pools, when the line operators have a different utility function per pool. We conduct an experimental study of our mechanism on both synthetic and real-world data that shows fast convergence to the optimum. We also explore a wide range of scenarios, varying from an arbitrary initial state (to be solved) to small disruptions in a previously optimal solution (to be recovered). Our experiments with the latter scenario show tha"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1101.2770","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}