{"paper":{"title":"Coordinated Charging and Discharging Strategies for Plug-in Electric Bus Fast Charging Station with Energy Storage System","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["math.OC"],"primary_cat":"cs.SY","authors_text":"Haocheng Luo, Hongcai Zhang, Huimiao Chen, Zechun Hu","submitted_at":"2017-12-04T14:10:38Z","abstract_excerpt":"Plug-in electric bus (PEB) is an environmentally friendly mode of public transportation and plug-in electric bus fast charging stations (PEBFCSs) play an essential role in the operation of PEBs. Under effective control, deploying an energy storage system (ESS) within a PEBFCS can reduce the peak charging loads and the electricity purchase costs. To deal with the (integrated) scheduling problem of (PEBs charging and) ESS charging and discharging, in this study, we propose an optimal real-time coordinated charging and discharging strategy for a PEBFCS with ESS to achieve maximum economic benefit"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1712.01083","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}