{"paper":{"title":"A Unified Framework for Wide Area Measurement System Planning","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.CE"],"primary_cat":"cs.SY","authors_text":"Albert Y.S. Lam, David J. Hill, James J.Q. Yu, Victor O.K. Li","submitted_at":"2017-11-21T07:21:44Z","abstract_excerpt":"Wide area measurement system (WAMS) is one of the essential components in the future power system. To make WAMS construction plans, practical models of the power network observability, reliability, and underlying communication infrastructures need to be considered. To address this challenging problem, in this paper we propose a unified framework for WAMS planning to cover most realistic concerns in the construction process. The framework jointly optimizes the system construction cost, measurement reliability, and volume of synchrophasor data traffic resulting in a multi-objective optimization "},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1711.07652","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}