{"paper":{"title":"Deadline Differentiated Pricing of Deferrable Electric Loads","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.GT"],"primary_cat":"math.OC","authors_text":"Eilyan Bitar, Yunjian Xu","submitted_at":"2014-07-07T07:01:55Z","abstract_excerpt":"A large fraction of the total electric load is comprised of end-use devices whose demand for energy is inherently deferrable in time. Of interest is the potential to leverage on such latent flexibility in demand to absorb variability in power supplied from intermittent renewable generation. The challenge, however, lies in designing incentives to reliably induce the desired response in demand. With an eye to electric vehicle charging, we propose a novel forward market for differentiated electric power services, where consumers consent to deferred service of pre-specified loads in exchange for a"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1407.1601","kind":"arxiv","version":5},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}