{"paper":{"title":"Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring","license":"http://creativecommons.org/licenses/by/4.0/","headline":"","cross_cats":["q-fin.EC"],"primary_cat":"econ.GN","authors_text":"Abdalla Abou-Jaoude, Botros Hanna, Chandu Bolisetti, Christopher Forsyth, Jason Hansen, Jia Zhou, Koroush Shirvan, Levi M. Larsen, Ryan Spangler","submitted_at":"2026-01-21T00:53:50Z","abstract_excerpt":"Existing evidence on nuclear power plant construction suggests that individual stakeholders involved in project delivery are often not responsible for all of the cost overruns in their scope of the project, which can lead to costly and time-consuming litigation to determine who is truly at fault for overruns. This study introduces a framework to model the share of overruns caused and received as payment by five stakeholders in a nuclear construction project: equipment suppliers, construction subcontractors, the design and management team, creditors, and the nuclear regulator. We then perform a"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2601.14558","kind":"arxiv","version":2},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2601.14558/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}