{"paper":{"title":"On rescheduling due to machine disruption while to minimize the total weighted completion time","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":[],"primary_cat":"cs.DS","authors_text":"Guohui Lin, Randy Goebel, Taibo Luo, Wenchang Luo","submitted_at":"2017-01-25T21:44:24Z","abstract_excerpt":"We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is represented as an unavailable time interval and is revealed to the production planner before any job is processed; the production planner wishes to reschedule the jobs to minimize the alteration to the originally planned schedule, which is measured as the maximum time deviation between the original and the new schedules for all the jobs. The objective function in th"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1701.07498","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}