{"paper":{"title":"Distributionally Robust Chance-Constrained Flexibility Planning for Integrated Energy System","license":"http://creativecommons.org/licenses/by-sa/4.0/","headline":"","cross_cats":["cs.SY"],"primary_cat":"eess.SY","authors_text":"Guangya Yang, Peng Hou, Sen Zhan","submitted_at":"2021-05-17T14:36:13Z","abstract_excerpt":"Inflexible combined heat and power (CHP) plants and uncertain wind power production result in excess power in distribution networks, which leads to inverse power flow challenging grid operations. Power-to-X facilities such as electrolysers and electric boilers can offer extra flexibility to the integrated energy system. In this regard, we aim to jointly determine the optimal Power-to-X facility sizing and integrated energy system operations in this study. To account for wind power uncertainties, a distributionally robust chance-constrained model is developed to characterize wind power uncertai"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2105.07906","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2105.07906/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}