{"paper":{"title":"Network Topology Reconfiguration: Optimal Transition Planning","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.SY"],"primary_cat":"eess.SY","authors_text":"Adolfo Anta, Basel Morsy, Jochen Cremer, Jochen Stiasny","submitted_at":"2026-08-12T13:28:34Z","abstract_excerpt":"Network topology reconfiguration (NTR) can reduce power system operating costs by co-optimizing generation dispatch and substation switching, but the reported savings describe a target operating point rather than a way to reach it. Reaching this operating point requires a sequence of intermediate operating points, each satisfying the AC power flow equations and thermal limits; because each topology admits its own feasible dispatch region, a naive transition that switches or redispatches first can drive intermediate flows past their thermal limits. Existing methods leave this gap open: snapshot"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2608.12047","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2608.12047/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}