{"paper":{"title":"Inference as Flexibility: Ramp Management for Transmission-Connected AI Data Centres","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.SY"],"primary_cat":"eess.SY","authors_text":"Zhirui Liang","submitted_at":"2026-06-20T01:59:18Z","abstract_excerpt":"The rapid growth of large AI data centres introduces new operational challenges for power systems, including rapid ramping, oscillatory load behavior, voltage fluctuations, and supply-demand balancing impacts. For example, the Alberta Electric System Operator (AESO) has identified transmission-connected data centres (TCDCs) as large non-conforming loads that may need to limit their point-of-connection ramp rates. Existing mitigation approaches mainly rely on exogenous electrical resources, such as battery energy storage systems (BESS). This paper presents a proof-of-concept demonstration of a "},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2606.21833","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2606.21833/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}