{"paper":{"title":"Scheduling Mechanisms in Wireless Sensor-Actuator Networks for Multi-rate Periodic Control in Industry 4.0","license":"http://creativecommons.org/licenses/by/4.0/","headline":"","cross_cats":["cs.DC","cs.ET"],"primary_cat":"cs.NI","authors_text":"Dingwen Yuan, Luis F. Abanto-Leon, Matthias Hollick","submitted_at":"2026-05-28T19:56:01Z","abstract_excerpt":"This paper investigates scheduling strategies for wireless sensor-actuator networks (WSANs) in Industry 4.0 scenarios. In particular, we address the problem of real-time scheduling for multi-rate control systems by proposing a novel framework. Our framework features four strategies that improve reliability, schedulability and execution time, and reduce communication and storage costs. Two-phase scheduling is our first strategy, devised to improve communication reliability. Our second strategy is the least-laxity-first with remaining conflicts (LLF-RC) scheduling algorithm, which has high sched"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2605.30520","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2605.30520/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}