{"paper":{"title":"Installation Progress At The PIP-II Injector Test At Fermilab","license":"http://creativecommons.org/licenses/by/4.0/","headline":"","cross_cats":[],"primary_cat":"physics.acc-ph","authors_text":"A. Chen, A. Shemyakin, B. Hanna, B. Hartsell, C. Baffes, D. Mitchell, J. Czajkowski, J. Edelen, J. Steimel, K. Kendziora, L. Prost, M. Alvarez, P. Derwent, R. Andrews, T. Zuchnik (Fermilab) A. Edelen (Colorado State U.), V. Scarpine","submitted_at":"2017-01-04T17:13:41Z","abstract_excerpt":"A CW-compatible, pulsed H- superconducting linac \"PIP-II\" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as \"PXIE\") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadrupole (RFQ) capable of operation in Continuous Wave (CW) mode, and a 10 m-long Medium Energy Beam Transport (MEBT). The paper will report on the installation of the RFQ and the first sections of the M"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1701.01078","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}