{"paper":{"title":"Graph Scheduling with Group Completion Times","license":"http://creativecommons.org/licenses/by/4.0/","headline":"","cross_cats":["math.OC"],"primary_cat":"cs.DS","authors_text":"Lars Rohwedder, Leander Schnaars","submitted_at":"2026-06-30T11:44:19Z","abstract_excerpt":"In the Graph Scheduling problem we schedule a given multiset of edges on discrete time steps, such that at each step the set of edges forms a matching. The goal is to minimize the sum of weighted group completion times, where a group is a set of edges and it completes when the last edge has been scheduled. Two popular variants of this problem are Coflow Scheduling and Data Migration. Our main result is extending a recent iterated rounding approach from Coflow Scheduling, roughly corresponding to the bipartite case, to the general Graph Scheduling problem. This yields an essentially tight $(2+\\"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2606.31530","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2606.31530/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}