{"paper":{"title":"Constraint Programming Models For Serial Batch Scheduling With Minimum Batch Size","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.AI","math.OC"],"primary_cat":"cs.DC","authors_text":"Jorge A. Huertas, Pascal Van Hentenryck","submitted_at":"2025-04-07T17:14:19Z","abstract_excerpt":"In serial batch (s-batch) scheduling, jobs are grouped in batches and processed sequentially within their batch. This paper considers multiple parallel machines, nonidentical job weights and release times, and sequence-dependent setup times between batches of different families. Although s-batch has been widely studied in the literature, very few papers have taken into account a minimum batch size, typical in practical settings such as semiconductor manufacturing and the metal industry. The problem with this minimum batch size requirement has been mostly tackled with dynamic programming and me"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2504.08793","kind":"arxiv","version":2},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/2504.08793/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}