{"paper":{"title":"Scheduling for Flexible Manufacturing System with Objective Function to be Minimization of Total Processing Time and Unbalance of Machine Load","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.SY","eess.SY"],"primary_cat":"cs.DC","authors_text":"Ri Taehyong, U Yongnam","submitted_at":"2019-06-21T02:49:15Z","abstract_excerpt":"For scheduling in flexible manufacturing system (FMS), many factors should be considered, it is difficult to solve the scheduling problem by satisfying different criteria (production cost, utilization of system, number of movements of part, make-span, and tardiness in due date and so on) and constrains. The paper proposes mathematical model of a job shop scheduling problem (JSSP) to balance the load of all machines and utilize effectively all machines in FMS. This paper defines the evaluation function of the unbalance of the machine load and formulates the optimization problem with two objecti"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1906.08926","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}