{"paper":{"title":"Towards Tight Lower Bounds for Scheduling Problems","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":[],"primary_cat":"cs.CC","authors_text":"Abbas Bazzi, Ashkan Norouzi-Fard","submitted_at":"2015-07-07T18:04:24Z","abstract_excerpt":"We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite structural hardness result of Bansal and Khot, we obtain a hardness of $2-\\epsilon$ for the problem of minimising the makespan for scheduling precedence-constrained jobs with preemption on identical parallel machines. This matches the best approximation guarantee for this problem. Assuming the same hypothesis, we also obtain a super constant inapproximability resul"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1507.01906","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}