{"paper":{"title":"Data-Aware Approximate Workflow Scheduling","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":[],"primary_cat":"cs.DC","authors_text":"Dengpan Yin, Tevfik Kosar","submitted_at":"2018-05-26T15:41:55Z","abstract_excerpt":"Optimization of data placement in complex scientific workflows has become very crucial since the large amounts of data generated by these workflows significantly increases the turnaround time of the end-to-end application. It is almost impossible to make an optimal scheduling for the end-to-end workflow without considering the intermediate data movement. In order to reduce the complexity of the workflow-scheduling problem, most of the existing work constrains the problem space by some unrealistic assumptions, which result in non-optimal scheduling in practice. In this study, we propose a genet"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1805.10499","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}