{"paper":{"title":"Constraint Ornstein-Uhlenbeck bridges","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":[],"primary_cat":"cond-mat.stat-mech","authors_text":"Alain Mazzolo","submitted_at":"2017-04-25T11:46:26Z","abstract_excerpt":"In this paper, we study the Ornstein-Uhlenbeck bridge process (i.e. the Ornstein-Uhlenbeck process conditioned to start and end at fixed points) constraints to have a fixed area under its path. We present both anticipative (in this case, we need the knowledge of the future of the path) and non-anticipative versions of the stochastic process. We obtain the anticipative description thanks to the theory of generalized Gaussian bridges while the non-anticipative representation comes from the theory of stochastic control. For this last representation, a stochastic differential equation is derived w"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1704.07644","kind":"arxiv","version":2},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}