{"paper":{"title":"Transverse Beam Envelope Measurements and the Limitations of the 3-Screen Emittance Method for Space-Charge Dominated Beams","license":"","headline":"","cross_cats":[],"primary_cat":"physics.acc-ph","authors_text":"H. Wang, J. G. Power, M. E. Conde, R. Konecny, W. Gai, W. Liu, Z. Yusof","submitted_at":"2004-10-01T21:49:06Z","abstract_excerpt":"In its normal mode of operation the Argonne Wakefield Accelerator Facility uses a high charge (10-100 nC), short pulse (3-5 psec) drive bunch to excite high-gradient accelerating fields in various slow-wave structures. To generate this bunch, we designed a 1.5 cell, L-band, rf photocathode gun with an emittance compensating solenoid to give optimal performance at high-charge; it has recently completed commissioning. More recently, we have begun to investigate the possibility of using this gun in a high-brightness, low-charge operating mode, with charge equal to approximately 1 nC, for high-pre"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"physics/0410013","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/physics/0410013/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}