{"paper":{"title":"Universality of Makespan in Flowshop Scheduling Problem","license":"http://creativecommons.org/licenses/by/4.0/","headline":"","cross_cats":["cond-mat.dis-nn","math-ph","math.MP"],"primary_cat":"math.OC","authors_text":"Ikou Kaku, Kei Kobayashi, Takashi Shinzato","submitted_at":"2016-07-22T06:29:06Z","abstract_excerpt":"Makespan, which is defined as the time difference between the starting time and the terminate time of a sequence of jobs or tasks, as the time to traverse a belt conveyor system, is well known as one of the most important criteria in scheduling problems. It is often used by manufacturing firms in practice in order to improve the operational efficiency with respect to the order of job processing to be performed. It is known that the performance of a machine depends on the particular timing of the job processing even if the job processing order is fixed. That is, the performance of a system with"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1607.07303","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}