{"paper":{"title":"Compensation of Charging Station Overload via On-road Mobile Energy Storage Scheduling","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.SY","eess.SP"],"primary_cat":"eess.SY","authors_text":"Jinghuan Ma, Miao Wang, Mushu Li, Nan Chen, Xuemin (Sherman) Shen","submitted_at":"2019-10-26T03:29:55Z","abstract_excerpt":"Supported by the technical development of electric battery and charging facilities, plug-in electric vehicle (PEV) has the potential to be mobile energy storage (MES) for energy delivery from resourceful charging stations (RCSs) to limited-capacity charging stations (LCSs). In this paper, we study the problem of using on-road PEVs as MESs for energy compensation service to compensate charging station (CS) overload. A price-incentive scheme is proposed for power system operator (PSO) to stimulate on-road MESs fulfilling energy compensation tasks. The price-service interaction between the PSO an"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1910.11986","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"integrity":{"clean":true,"summary":{"advisory":0,"critical":0,"by_detector":{},"informational":0},"endpoint":"/pith/1910.11986/integrity.json","findings":[],"available":true,"detectors_run":[],"snapshot_sha256":"c28c3603d3b5d939e8dc4c7e95fa8dfce3d595e45f758748cecf8e644a296938"},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}