{"paper":{"title":"Monitoring Control Updating Period In Fast Gradient Based NMPC","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["cs.SE"],"primary_cat":"cs.SY","authors_text":"Mazen Alamir","submitted_at":"2012-09-21T21:22:56Z","abstract_excerpt":"In this paper, a method is proposed for on-line monitoring of the control updating period in fast-gradient-based Model Predictive Control (MPC) schemes. Such schemes are currently under intense investigation as a way to accommodate for real-time requirements when dealing with systems showing fast dynamics. The method needs cheap computations that use the algorithm on-line behavior in order to recover the optimal updating period in terms of cost function decrease. A simple example of constrained triple integrator is used to illustrate the proposed method and to assess its efficiency."},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1209.4922","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}