{"paper":{"title":"Maximising Throughput in a Complex Coal Export System","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":[],"primary_cat":"cs.CE","authors_text":"Alexandre Mendes, Andreas Ernst, Martin Savelsbergh, Mateus Rocha de Paula, Natashia Boland","submitted_at":"2018-08-18T05:38:21Z","abstract_excerpt":"The Port of Newcastle features three coal export terminals, operating primarily in cargo assembly mode, that share a rail network on their inbound side, and a channel on their outbound side. Maximising throughput at a single coal terminal, taking into account its layout, its equipment, and its operating policies, is already challenging, but maximising throughput of the Hunter Valley coal export system as a whole requires that terminals and inbound and outbound shared resources be considered simultaneously. Existing approaches to do so either lack realism or are too computationally demanding to"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1808.06044","kind":"arxiv","version":2},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}