{"as_of":"2026-08-17T00:28:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:8e987f406a6033584f254f4a98ed792e9a0ffffe584ac7bbc05cb523e819bafb","coverage":[{"denominator":25,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":25,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-14T12:34:41.660651Z","state":"measured"},{"denominator":25,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":25,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-16T06:30:59.297886+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/1908.07074/citation-record","integrity":"/paper/1908.07074/integrity","json":"/paper/1908.07074/citation-record.json","paper":"/paper/1908.07074"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:42.061330Z","title":"Optimal Bidding Str ategies for Hydro-Electric Producers: A Literature Survey ,","venue":null,"work_id":"43161cdb-ddc6-4627-b357-933d71dd146d","year":2014},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.527040Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:a715d289c2877de589a0f0a7ac47ee95ce315bbcadba4d9734f696d389f4d653","observation_id":"c9c47086-05b3-42cf-a897-1571006ae7d2","resolution":{"observed_at":"2026-08-14T12:34:42.066468Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:42.045353Z","title":"Op timizing Day-Ahead Bid Curves in Hydropower Production,","venue":null,"work_id":"f485b4a0-debf-46f9-9bb3-3f377facd0cd","year":2018},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.534073Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:c359b73f5a0f5523fb04bd4bc7146673faa12dab7c997829fbaef602195df13e","observation_id":"436bb742-2f54-4042-846a-5abd26cad393","resolution":{"observed_at":"2026-08-14T12:34:42.051488Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:42.031323Z","title":"Contract networks for electric power trans mission,","venue":null,"work_id":"147cf193-682a-4966-a479-8c328916d199","year":1992},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.540682Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:3a03c79bc06810ca0b230bf7b031af7dfda4c4690efb4430317309ac4d79e566","observation_id":"00204637-d485-4e24-b89f-7718612add71","resolution":{"observed_at":"2026-08-14T12:34:42.036292Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:42.019067Z","title":"Point to Point and Flow-Based Financial Tran smission Rights: Revenue Adequacy and Performance Incenti ves,","venue":null,"work_id":"54456d68-92de-4ea0-91e4-52b202a8e708","year":2013},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.546523Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:9af39f21d785406e59388d3acbee95c5081173e9cd4d5b6ee4b6fb88fa960a56","observation_id":"decea081-7709-4f9e-8eb7-a0fd6740b0f3","resolution":{"observed_at":"2026-08-14T12:34:42.023547Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:42.006780Z","title":"A merchant mechanism fo r electricity transmission expansion,","venue":null,"work_id":"85a399b5-11a3-4fff-9cbf-e31599630e2a","year":2006},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.551574Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:1c0dd1cc3872bc5738cb555af489a6adc12c5f90669841bcabc4ca348a996238","observation_id":"fd665272-c8bc-4271-a051-27a0de999283","resolution":{"observed_at":"2026-08-14T12:34:42.011200Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.992428Z","title":"A market mechanism for electric p ower transmission,","venue":null,"work_id":"15a56e98-daa9-4406-9c9a-42a1749bf545","year":1996},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.557846Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:7a2bb9336e4f05fda116738bb0fb4fbb07c4c21ede37acbca37c32d18a387ae5","observation_id":"98010922-8f6a-4f2e-9ecd-e48675df22fb","resolution":{"observed_at":"2026-08-14T12:34:41.997323Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.970578Z","title":"Financial Storage Rights,","venue":null,"work_id":"106da630-e547-45d4-a0b2-8e46ace64912","year":2015},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.563014Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:51eb221b1cf0781646dd217208baddc2a5c7458d9c108a4a32e08a9c0125ad28","observation_id":"3ee3bb19-857e-41d6-bf99-93572a062089","resolution":{"observed_at":"2026-08-14T12:34:41.976185Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.951479Z","title":"Auct ion-based allocation of shared electricity storage resour ces through physical storage rights,","venue":null,"work_id":"4a390d65-e78e-4d91-8c97-5a51e9f5c255","year":2016},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.568066Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:e58f6d773c5f2a10bb9be65cddd730fdb176fe88b38c27496586f50121fc9218","observation_id":"9fcc2ef9-d6d2-41e8-a70d-4b43a51fdd57","resolution":{"observed_at":"2026-08-14T12:34:41.955962Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.939263Z","title":"Financial storage righ ts in electric power networks,","venue":null,"work_id":"cf0564b1-7994-4761-97fb-96658515df41","year":2017},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.573420Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:a6549db806bb9ff23af12ca596c6d015b89b533bf5c5d801315643dba0ab19e5","observation_id":"06372f29-3b02-4938-92ef-1721ec0386ec","resolution":{"observed_at":"2026-08-14T12:34:41.943375Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.926211Z","title":"Welfare impacts of electricity storage and the implications of ownership structure,","venue":null,"work_id":"3ba55247-0b01-4607-84e9-3165c7d900fc","year":2009},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.578736Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:90a17fd15f6b6567378bd177de0dbc75e7227051346a5ffceb6112739883c10f","observation_id":"7dd741e2-e7f0-4b3b-baad-7f256f1eb59f","resolution":{"observed_at":"2026-08-14T12:34:41.930461Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.909852Z","title":"Energy Storage as a Transmission Asset,","venue":null,"work_id":"544aa8a6-5415-4c32-9f46-8eef2d4b1d5d","year":2012},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.586682Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:eab00d952d45e7ea6262d5ec4ab0efc40adc590c74cb17a336f602aa64e4dd28","observation_id":"1b2cf75a-2b33-4dc9-92ab-fb3f0a69fb9e","resolution":{"observed_at":"2026-08-14T12:34:41.915937Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.893533Z","title":"Storage as a transmission asset,","venue":null,"work_id":"fc414426-4ea1-4561-8d39-4788bf4cab6b","year":2018},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.592166Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:4b1d26ad795ff7a54417dd3f0dc9a9e746d97509ba503d487efd2b763818543a","observation_id":"a0182c88-4678-42f4-a4ae-c04bd5513031","resolution":{"observed_at":"2026-08-14T12:34:41.899173Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.881281Z","title":"Electric storage as a Transmission Solution in the MTE P Reliability Planning Process,","venue":null,"work_id":"a24b61fd-51cd-4551-a8de-54e92d7c06f5","year":2018},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.599383Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:a2ec1aa4854f82ca8e11f5a3aaff2e9869c2c5f746a22e652c8c5c5860c83331","observation_id":"97cee4bf-5934-492a-a0d0-7abc64d97bbe","resolution":{"observed_at":"2026-08-14T12:34:41.885705Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.869125Z","title":"Market and pol icy barriers to deployment of energy storage,","venue":null,"work_id":"59ba3466-5470-41a5-95ab-97dec08d3fd7","year":2012},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.604339Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:589be1d7cbbfdce974230b50f22a01e36c963a9491c556e329671fef4c620742","observation_id":"ac124ca4-51ac-47d3-9f55-b285b33b6aa9","resolution":{"observed_at":"2026-08-14T12:34:41.873592Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.856036Z","title":"Burden on hydropower units for short-te rm balancing of renewable power systems,","venue":null,"work_id":"e8744aa2-c434-487c-b6e5-d452183d320d","year":2018},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.608589Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:5ed226e251f7396b5558c30d271ab03751df9dfd34dd7bc98844940349cff0a0","observation_id":"48e3e1fc-aa6d-4369-80c4-ae76835bc307","resolution":{"observed_at":"2026-08-14T12:34:41.860686Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.842305Z","title":"A risk analysis of small-hydr o power (SHP) plants investments,","venue":null,"work_id":"47f15350-f9ac-4088-b3b3-84f1e34c0a98","year":2014},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.612889Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:c1d671d57f28a99f75e915cb16e2ce873b000daed7be1f4f9ef77d170036d1fe","observation_id":"99b1ccf9-b4b4-472c-ad4a-f520a4d669fb","resolution":{"observed_at":"2026-08-14T12:34:41.847491Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.829679Z","title":"An investigation into the pot ential of low head hydro power in Northern Ireland for the production of electricity,","venue":null,"work_id":"922fd3e1-c8e5-4cc3-80a7-ad743e6a0135","year":2015},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.618529Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:10afac23e003d283e2f423f979f1d3d16a201d3b00f91a21b8bb7b09743c57a7","observation_id":"b5b77008-2819-49aa-b2c0-bf4535737f06","resolution":{"observed_at":"2026-08-14T12:34:41.834340Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.815805Z","title":"Formulations for hydroelectric energy production with optimality conditions,","venue":null,"work_id":"c4d559ab-72b8-4d21-aff4-bb1845abceb5","year":2015},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.623093Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:d29ca7eb0df23f8a86dbb2c2d275ccc717a3b53bda5eae2965f74edafce9de6b","observation_id":"597610a3-8da7-401c-a34c-fd9d2a58cf52","resolution":{"observed_at":"2026-08-14T12:34:41.821289Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.801028Z","title":"Nonlinea r Medium-Term Hydro-Thermal Scheduling with Transmission Constraints,","venue":null,"work_id":"31fd204f-985f-4eaa-97d4-1f920b2f9f88","year":2014},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.627891Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:be164808c968b0940adb898c084e8fe38c2fa17819eb2d245821181119942298","observation_id":"8e6f75ac-7565-494f-9f83-94a760e79fc4","resolution":{"observed_at":"2026-08-14T12:34:41.806358Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.784782Z","title":"Multi-stage stoch astic optimization applied to energy planning,","venue":null,"work_id":"374cfef8-e27d-4f70-b25c-56620335fe63","year":1991},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.632429Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:bacede491b484723563336ae82a476d45441d6576d83bf3beb3cd8f0f00a88fd","observation_id":"5dc82cd5-7e4f-445c-9cc7-56e34935347b","resolution":{"observed_at":"2026-08-14T12:34:41.790267Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.760757Z","title":"Derived operating rules for re servoirs in series or in parallel,","venue":null,"work_id":"b4fed424-2cc2-4f95-9aee-b96e274b9829","year":1999},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.639061Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:f634f11db12b9bb6846ffe1b5762850b418138e210b76a9405f7c24df21d87d8","observation_id":"716e7b3a-f9ae-445f-a9a6-b5e9000a7b36","resolution":{"observed_at":"2026-08-14T12:34:41.766062Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.743353Z","title":"Using Semid eﬁnite Relaxation to Solve the Day-Ahead Hydro Unit Commitment Problem,","venue":null,"work_id":"86fa1d7e-ec70-4514-ab2f-32e45cba4707","year":2015},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.643736Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:f1a3d75fea20b36fcf91dc006fe89a5c83aa3efed8db8cdba967bc2edb91e493","observation_id":"37685764-40fe-43cd-8368-5e08a53f31ef","resolution":{"observed_at":"2026-08-14T12:34:41.749015Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.727258Z","title":"Hydroelectric unit commi tment for power plants composed of distinct groups of genera ting units,","venue":null,"work_id":"a22a73d8-8359-4d65-b1f9-b54f8525934c","year":2016},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.651004Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:837c82a7ab814471eb7d9e0877b221938cc2ec345d9cc6977ebc697c68eca802","observation_id":"0932f210-deea-47c3-ba9a-dae87b908025","resolution":{"observed_at":"2026-08-14T12:34:41.732244Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.711733Z","title":"A Four-Dimensional Mod el of Hydro Generation for the Short-Term Hydrothermal Dispatch Problem Considering Head and Spillage Effects,","venue":null,"work_id":"26caa7ed-f342-4c21-a6e6-7363c584662b","year":2008},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.655877Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:7d419c05b26861626493f7cb2c416b568492d90edce3e01994c6e0d7e057b8a7","observation_id":"bd91f5db-6ee6-47a1-9b83-ec7719bf5c71","resolution":{"observed_at":"2026-08-14T12:34:41.718029Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T12:34:41.691858Z","title":"Scheduling of Head-Sensitive Cascaded Hydro Systems: A Nonlinear Approach,","venue":null,"work_id":"c065c75d-ab93-4f6c-bce4-ac7ec92c2b03","year":2009},"citing_paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-14T12:34:41.660651Z"},"links":{"citing_paper":"/paper/1908.07074"},"observation_digest":"sha256:f50671b453b0f4e14e9fd5636e39a9fe988af28fbd2e2a59fd65e3ec055ed1e6","observation_id":"3bd447c4-efbc-4c12-aa4d-1afcb1d1b87f","resolution":{"observed_at":"2026-08-14T12:34:41.699853Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"1908.07074","last_updated":"2019-08-19T21:25:59Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-16T04:38:07.086068Z","submitted_at":"2019-08-19T21:25:59Z","title":"Financial storage rights for hydroelectricity"},"reference_resolution":{"displayed":25,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":25},"total_outbound_references":25},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"thesis":"As of 17 August 2026, this Paper Citation Record lists 25 of 25 outbound references and 0 inbound Pith citation observations for arXiv:1908.07074."}