{"as_of":"2026-08-16T05:57:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:a0647b14ca2b17d3eb9a31ecd2e69054c6a02cd12c25e0746af51cf6f925e8cf","coverage":[{"denominator":48,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":48,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-14T11:16:58.263526Z","state":"measured"},{"denominator":48,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":48,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-15T06:32:42.880941+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/1908.09449/citation-record","integrity":"/paper/1908.09449/integrity","json":"/paper/1908.09449/citation-record.json","paper":"/paper/1908.09449"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.414123Z","title":"Enabling localized peer-to-peer electricity trading amo ng plug-in hybrid electric vehicles using consortium blockchains,","venue":null,"work_id":"0f2ffc46-5986-4baf-ad02-af563d2bb852","year":2017},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.035253Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:f92f59d844a03fad6f135a75bdc1d11c51062dd76394ebcb11268d9fe5873426","observation_id":"3a058488-5667-4d98-90c3-84121541b1ea","resolution":{"observed_at":"2026-08-14T11:16:59.419013Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.399175Z","title":"En ergy crowdsourcing and peer-to-peer energy trading in blockcha in-enables smart grids,","venue":null,"work_id":"1d72e439-584d-4c50-a251-511edbc25946","year":null},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.040664Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:f056a19db8e3783eff234920e4f55deaac4a077ca2c1c3c5641e67bd1a88e4a9","observation_id":"9ca54161-5733-4b40-8745-c352ec383859","resolution":{"observed_at":"2026-08-14T11:16:59.404272Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.253874Z","title":"Blockchain-assisted cr owdsourced energy systems,","venue":null,"work_id":"d773a1a1-715c-4962-baa7-918a79d454c1","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.050808Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:fa929cbd50461d16d538defb388203eb0679d94377577d7c1c970c54fd7b8354","observation_id":"01ecc8b0-7df7-4e11-8888-991534733927","resolution":{"observed_at":"2026-08-14T11:16:59.259519Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.237527Z","title":"Transforming energy networks via peer-to-peer ener gy trading: The potential of game-theoretic approaches,","venue":null,"work_id":"d697254c-be8a-496b-ae22-87e879732d68","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.055432Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:3636b0808db8444e06c482fdb6b99cc66812ada7062df7f3bbaa441feddb81e2","observation_id":"819580fb-8e79-45bb-bf12-69c0e5a5a6fd","resolution":{"observed_at":"2026-08-14T11:16:59.243538Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.222190Z","title":"Designing microgrid energy markets - A case s tudy: The Brooklyn Microgrid,","venue":null,"work_id":"7e8eb016-9148-4c74-bb5d-2f67dc4fa2c5","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.060379Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:0301cea4bd5dc619da077c0adee970d5cd4a6541fd802712a526abb743cc5328","observation_id":"3dd5b0f1-662e-42f7-9968-99eaef0b9b73","resolution":{"observed_at":"2026-08-14T11:16:59.227053Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.207158Z","title":"Consort ium blockchain for secure energy trading in industrial interne t of things,","venue":null,"work_id":"4f33bb48-e74c-4e98-9c23-bb573eb75e50","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.065980Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:3cf759b483c6d08df92a8e9f500c5064646d3541ab7da0719f4557f7227f1f4a","observation_id":"f12e4d6f-8423-4239-8665-a6124b0fc21e","resolution":{"observed_at":"2026-08-14T11:16:59.212148Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.192162Z","title":"Evaluation of peer-to-peer e nergy sharing mechanisms based on a multiagent simulation framework,","venue":null,"work_id":"94812a73-a338-4b9a-a9b5-3a6d12b323a3","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.071486Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:a22067b2ab9f3e8ce0a54d36fe2e52042cc46ce186ddc3cc700064bb86faebad","observation_id":"26821532-2b27-487d-ba7c-b95f982d4ef6","resolution":{"observed_at":"2026-08-14T11:16:59.197074Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.176845Z","title":"Consensus-based appro ach to peer-to- peer electricity markets with product differentiation,","venue":null,"work_id":"a3e4b392-c24f-484c-95f9-4b15c02f626f","year":2019},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.076413Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:0fc7ab67f71aba758a5ee78434832948c13c770a5dc0f81f3a386c47eace7a9a","observation_id":"9f61c62b-c2f2-4cca-a8e2-7c98999ffb5e","resolution":{"observed_at":"2026-08-14T11:16:59.182358Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.160506Z","title":"Local electricity market designs for peer-to-peer trading: The r ole of battery ﬂexibility,","venue":null,"work_id":"989b46dd-99ca-473c-90b0-25aeefc335a2","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.081469Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:02f1ac97eb79504d3e0a91c4615d3e8dc0d6863bddf8405a1863b7c9a87efe6e","observation_id":"2a525e4e-c56c-42da-8e8a-db8b93906214","resolution":{"observed_at":"2026-08-14T11:16:59.166282Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.144296Z","title":"Peer-to-peer en ergy sharing through a two-stage aggregated battery control in a communi ty micro- grid,","venue":null,"work_id":"6e132744-d694-4b80-9d39-6bb1c8db3d11","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.086266Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:b595f75b9562a129fed4834e1856299c754f0d614fbf03c25e5ddded5384f357","observation_id":"d398abae-a144-4325-b77c-dcfbc82b8274","resolution":{"observed_at":"2026-08-14T11:16:59.149174Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.129222Z","title":"Peer-to-peer energy trading in a microgrid,","venue":null,"work_id":"bd212395-66ca-4d41-9769-718b96e36e3c","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.091064Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:c6514b9ff0ce09b23def518904ff891637087cd39054f481a3e0264c33969487","observation_id":"166919f6-196a-4143-b79f-26c0bc43b9ba","resolution":{"observed_at":"2026-08-14T11:16:59.134134Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.113830Z","title":"Bilate ral contract networks for peer-to-peer energy trading,","venue":null,"work_id":"7c9260ed-dce2-46a2-ab76-b7236a392a36","year":2026},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.095570Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:96c6a036fa1813df576e88980c65ea617c53844147beaf4c950b74327823a674","observation_id":"73e99ae4-f940-4ae4-9f9f-caac7f815ecd","resolution":{"observed_at":"2026-08-14T11:16:59.118961Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2018.28784","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.603070Z","title":"Decentrali zed P2P energy trading under network constraints in a low-voltage n etwork,","venue":null,"work_id":"fe7dcc22-a19f-4592-80f7-be72c125af5a","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.100200Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:930450f0b6e47a633fe927a885e54483c23f21497a03c91bf94d5aac8b89ec80","observation_id":"5e12d187-fbba-44c7-9aee-231d5e6888e2","resolution":{"observed_at":"2026-08-14T11:16:58.614123Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.098263Z","title":"A technical approach to the energy blockchain in mic rogrids,","venue":null,"work_id":"941391b1-fe86-4e45-a3a5-8188e5ae4106","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.104937Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:ad759afdf95bde5851afc75930e73e7aa4e9ada19a31039c22c7827c869532c5","observation_id":"bca76420-37c9-4b67-bc8b-f8e0f83314ba","resolution":{"observed_at":"2026-08-14T11:16:59.103270Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.082736Z","title":"A technical approach to the energy blockchain in m icrogrids,","venue":null,"work_id":"831a9a5f-d9a3-4ac3-adf8-c0dae574844a","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.109438Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:e09f9bbf6157929133b6285e7f75e1aa358fba50ff2d3c8fd22590d6cd02b238","observation_id":"6b544795-dd20-455e-b950-78124917a096","resolution":{"observed_at":"2026-08-14T11:16:59.087828Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.113907Z","title":"A graph-based loss allocation framework for transactive energy markets i n unbalanced radial distribution networks,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.113907Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:25076d19c0855c23491698d30e4a66f02264721e1fdf9197aefa26a03944c5bd","observation_id":"78c7f183-9e8a-4f21-8225-0115dfba4b59","resolution":{"observed_at":"2026-08-14T11:16:58.113907Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.066961Z","title":"Peer-to-peer control system for D C micro- grids,","venue":null,"work_id":"103f3837-00f4-4fbf-999f-ddd08f3f95c5","year":2016},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.119076Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:bf398e8e68c17c113620a54cf49b107babb6a4253f8fb88edb0cba3699d082b9","observation_id":"c7892ac1-23c1-485b-b91a-606b76493ac2","resolution":{"observed_at":"2026-08-14T11:16:59.071952Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.123552Z","title":"Multi-class energy manag ement for peer-to-peer energy trading driven by prosumer prefere nces,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.123552Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:3bc271b6e2f7bbae029dad729f803f9c009af2ca85f73290b59e37fceb6969d3","observation_id":"124506b8-378f-48a8-90aa-4568d2a516bc","resolution":{"observed_at":"2026-08-14T11:16:58.123552Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.051869Z","title":"Using peer-to-peer energy-trading platforms to incentivize pro sumers to form federated power plants,","venue":null,"work_id":"0739b67d-8055-485e-a7c5-a280685cff1a","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.128146Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:73853c7a4162510cf54e4a014f5c533f4166fd3e983d9a89e4447297bd6d4024","observation_id":"7037e6d2-c365-4d50-8f3d-ccfa95191979","resolution":{"observed_at":"2026-08-14T11:16:59.057058Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.037079Z","title":"Peer to peer energy trading with sustainable user particip ation: A game theoretic approach,","venue":null,"work_id":"4e02c6e3-e2ff-450b-9c34-bcee5805626c","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.132676Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:1dd806e1575c650bb41f1785bcfc597f519a687ad41876034f44a8360bedb345","observation_id":"74f2d7ad-9852-4570-8eea-c075d5197fd6","resolution":{"observed_at":"2026-08-14T11:16:59.041866Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.020647Z","title":"Peer-to-peer and community-based markets: A comprehensi ve review,","venue":null,"work_id":"4e32aacf-d3ca-4d3b-84f0-f430751afe0e","year":2019},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.136895Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:cc5618752ca9e68af45a46a1847ee94a69751b5f08d9df0fdbd8f2ee247fab4f","observation_id":"5483c8d8-b2f6-4384-9efd-bfbf2fe09ecc","resolution":{"observed_at":"2026-08-14T11:16:59.025917Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.005477Z","title":"State-of-the-art and prospects for p eer-to-peer transaction-based energy system,","venue":null,"work_id":"9431a11f-c5f9-4ecb-959e-47313a44168b","year":2017},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.141891Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:ad216a6b9f1c93e9e4079c9ddf588fd279fc1f7a8d157513a6f38c0c25bbf550","observation_id":"2e553238-be2a-4b9d-8d09-76559e5c02d4","resolution":{"observed_at":"2026-08-14T11:16:59.010431Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.990035Z","title":"Three-party energy management with distribute d energy resources in smart grid,","venue":null,"work_id":"7b433ffe-30c8-4892-aaad-88313558df6a","year":2015},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.146532Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:5fa4745096f7f79df95b54c848715d1bee93f2f4654c77538c062c728ed3ef9b","observation_id":"6dd1a24f-93b2-45de-ac8e-a301d84a89fc","resolution":{"observed_at":"2026-08-14T11:16:58.995336Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.974795Z","title":"Dependable demand response management in the smart grid: A stackelberg game approach,","venue":null,"work_id":"ec797bb4-eea9-4367-a54c-346692462bdd","year":2013},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.151294Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:52a5cfadf3bb6492a0a2a7b99c55591d348f91c4c135be13299d3e356d100dcd","observation_id":"34f5a1ba-4671-4821-8249-d94e13227c5a","resolution":{"observed_at":"2026-08-14T11:16:58.979805Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.959868Z","title":"Economic s of electric vehicle charging: A game theoretic approach,","venue":null,"work_id":"bd796c07-5bea-4bf7-a5b4-17a82ef72ed1","year":2012},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.155865Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:261abd346b070debbde2dce850a2947ded7a3880f4f39b3fb02abf494019986e","observation_id":"c1484b7e-724c-4ba5-a854-f26657d606c7","resolution":{"observed_at":"2026-08-14T11:16:58.964612Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.943624Z","title":"A stackelberg ga me approach for multiple energies trading in integrated energ y systems,","venue":null,"work_id":"37828cdf-43d7-488c-a125-9630c67f9651","year":2017},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.161072Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:1612c1dd11570bdc765a5104b0261795a0c89d052b967bf33ab386f2f7c51602","observation_id":"98c5c8e8-914e-479b-a783-600af4057203","resolution":{"observed_at":"2026-08-14T11:16:58.949736Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.928322Z","title":"Energy storage sharing in smart grid: A modiﬁed auc tion- based approach,","venue":null,"work_id":"4fb6ca50-4dd8-4637-afb4-217aa0e98674","year":2016},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.166261Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:e255ee374c83497ef3595a82fe15e120ba6af9723857411103023a4ff1076c15","observation_id":"7c739709-1192-43e2-beea-b2896eab191b","resolution":{"observed_at":"2026-08-14T11:16:58.933190Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.913556Z","title":"Optimizing th e spinning reserve requirements using a cost/beneﬁt analysis,","venue":null,"work_id":"453dd702-b4f5-47f7-acb8-94cc3726cfc1","year":2007},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.170855Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:c218f9dbe4fd0466a1d24cc026c14155ef8ebd005e6f4d70f563f7b1d450b996","observation_id":"c8e6230f-7e57-4552-b6d1-f5d04d0a14d6","resolution":{"observed_at":"2026-08-14T11:16:58.918394Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.897858Z","title":"Neural network based optimization approach for energy demand prediction i n smart grid,","venue":null,"work_id":"51799f8e-bd4e-4a44-b3a3-fa7358a375b4","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.176048Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:928155c9d9ebead39cd940c62f25d035f54bb6eadfcd55fc69bc12987cb705c8","observation_id":"6606bdab-2773-4e0d-a494-b39e0861bad2","resolution":{"observed_at":"2026-08-14T11:16:58.903214Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.882263Z","title":"PHEV chargin g and discharging cooperation in V2G networks: A coalition game a pproach,","venue":null,"work_id":"1687594a-48b1-49d5-951c-a88ef5b4e9f6","year":2014},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.180780Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:2746f01f52c18bd43d157213a1dac57ecf92f96e18f327aa274c8c05d540bf66","observation_id":"9f55e896-75f7-4c50-8558-ccf4ec021fb8","resolution":{"observed_at":"2026-08-14T11:16:58.887143Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.866250Z","title":"Managing energy ef ﬁciency of buildings in China: A survey of energy performance contract ing (EPC) in building sector,","venue":null,"work_id":"cc3d51a6-4a53-4df8-817e-9ee9cb861f8f","year":2018},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.185406Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:39c04ebe2ab7aba8e80dcade1d1ca109e619bcb1291695568950a5a7e431203e","observation_id":"b5d7e9f6-6987-455f-a14e-e4814dfb820e","resolution":{"observed_at":"2026-08-14T11:16:58.871430Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.850582Z","title":"CONSORT Bruny island battery trial: Project ﬁnal report - Projects results and lessons learnt,","venue":null,"work_id":"9e4d61e0-de25-4ebc-81d4-3afcdd9d8e93","year":2019},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.190051Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:71ac7ff8c3fb1e37049a143b2c34b5252afce37db1e03e67899c05da73af7d37","observation_id":"c7fcffdb-8955-431d-81b0-e225ee860980","resolution":{"observed_at":"2026-08-14T11:16:58.855871Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.835073Z","title":"Coalitional game theory for communication networks,","venue":null,"work_id":"0dc952df-ea04-4ac3-80fd-2d3c7f03cf7b","year":2009},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.197703Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:b90b051f4ec3a9828c079e6a1e63804e68ac70c58c26b86ddf652beb118b138b","observation_id":"fd674ff2-f4ac-4cd0-a416-572859bd2d80","resolution":{"observed_at":"2026-08-14T11:16:58.840154Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.819479Z","title":"Blockchain technology in the e nergy sector: A systematic review of challenges and opportunitie s,","venue":null,"work_id":"82448670-672a-4dff-9a79-2e33704db090","year":2019},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.203527Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:84a91227f1cf09ad4d715d625390da3142c293d9587630af8ee723d8aaed9b36","observation_id":"ff1846ea-1252-49a8-82fb-9f5981c470f5","resolution":{"observed_at":"2026-08-14T11:16:58.824548Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.804389Z","title":"A noncooperat ive game for double auction-based energy trading between phevs and d istribution grids,","venue":null,"work_id":"8507f290-0a8a-4d64-8a6f-c246e4eab481","year":2011},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.207947Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:77bfe756a4e45393ed197e54e309352ff69f200d0c95ce5b1ef7ea677749279f","observation_id":"928d2503-3dff-4bfb-be43-2f0759fc1c0d","resolution":{"observed_at":"2026-08-14T11:16:58.809530Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.789498Z","title":"Peer- to-peer energy trading in a community microgrid,","venue":null,"work_id":"9a6fdaab-f430-4098-bed2-e1dbd168458b","year":2017},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.212777Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:76000b876fc0348d0f970cd37b58a56b898caa4d541915e2c0c38034c55e7d9e","observation_id":"18fbd2f5-f1dc-4219-9ca5-b6eb60f98754","resolution":{"observed_at":"2026-08-14T11:16:58.794391Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.772621Z","title":"Counterspeculation, auctions, and compe titive sealed ten- ders,","venue":null,"work_id":"90fb2bbb-cc26-41bf-8ea5-7535f442e601","year":1961},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.217109Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:eb6cee05e56d902fb33dd69476ea371226e763a7336b3d787e601a4699b95438","observation_id":"bf1eb714-9b95-4eda-ab74-2c435d3f9ef5","resolution":{"observed_at":"2026-08-14T11:16:58.777958Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.757012Z","title":"Design of a m ulti-unit double auction e-market,","venue":null,"work_id":"76170fe2-ae56-4a8e-8edc-b08f301f3231","year":2002},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.221527Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:278ecf7a14fc7796432667726916d6e1a0d0aea36503a806ff19a991000e4f46","observation_id":"8121d847-0bf9-4e8c-9ebb-b6d7c5861fee","resolution":{"observed_at":"2026-08-14T11:16:58.762031Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2019.28909","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.471162Z","title":"Robust power system state estimation from rank-one measurements,","venue":null,"work_id":"112c5d17-cc8b-496d-9ae7-d915a0e3759b","year":2019},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.225923Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:292833e25e48ae7091caeac8cac12e0c56490b57ceed32bcdb69d31d70755106","observation_id":"9d457372-a97f-4189-833d-06d3adfee624","resolution":{"observed_at":"2026-08-14T11:16:58.482028Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.741447Z","title":"Feasibility study of ﬁnancial P2P energy trading in a grid-tied power net work,","venue":null,"work_id":"a2e51834-2aa8-4e56-afab-5661aadee931","year":2019},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.230885Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:43ab9303526737272726894bb19b74a08467fdafab2c1dc2bee4ffccc38a05f3","observation_id":"006f93f4-ff35-4d03-bf7a-28f2775b364e","resolution":{"observed_at":"2026-08-14T11:16:58.746456Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.724826Z","title":"A motivational game theoretic approac h for peer-to-peer energy trading in the smart grid,","venue":null,"work_id":"5556c828-a4f4-4c27-8c55-a2d355d0a5ac","year":2019},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.235488Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:2d1e88b1dae5c4e6a4b8319fd9c6551bcd66b92458a59d5da9adc9233429a77d","observation_id":"8b320ab4-d51b-4efe-aad3-b64678e908e6","resolution":{"observed_at":"2026-08-14T11:16:58.729926Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.709599Z","title":"Rational choice and the fra ming of decisions,","venue":null,"work_id":"0fd88cf3-4f09-4b70-9c27-66dc57662e58","year":1986},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.240753Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:9e7b9c2b9de13a15f462fc3fdfb97947bfeba7f0aed326f130b37e23e105ad6b","observation_id":"ec595d0c-962c-46f1-a659-6177a3e14c1f","resolution":{"observed_at":"2026-08-14T11:16:58.714403Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.692586Z","title":"Motivating home energy action - A handbo ok of what works,","venue":null,"work_id":"2e0249c1-3cfb-4f42-a042-1c7c8899834a","year":2000},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.245411Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:faaba598c70ecc5205cef1e9bc3974faeb48014ab3a895de6cd10075f7b82470","observation_id":"f7260b44-96c0-4aae-aa47-b60749487eeb","resolution":{"observed_at":"2026-08-14T11:16:58.698493Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.676195Z","title":null,"venue":null,"work_id":"73d07f48-bdb8-4d64-9163-8e59803e7365","year":2003},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.249811Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:463787649a65bd56279ece9fd1b86844b02a256ff0c35019f60c8a8a00c8ce72","observation_id":"e2a580d7-8abc-4515-8b31-9667978a30e2","resolution":{"observed_at":"2026-08-14T11:16:58.681089Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.659952Z","title":null,"venue":null,"work_id":"b382c8c0-5062-464e-a1c5-a7d325ea75dd","year":1986},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.254384Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:45d07bfe996d4a242ef15e421fe8595a476b3831ee43f37c8497a038487e1ed0","observation_id":"7eb42213-6093-4121-8aac-120dffafa7b1","resolution":{"observed_at":"2026-08-14T11:16:58.665071Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.643032Z","title":"29 November 2017 - High Energy Price SA,","venue":null,"work_id":"f7f3a93d-6772-4fb9-8043-c230dff9a0d6","year":2017},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.258904Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:1ccde1675c6b39dd51dc7d22f2548230eafd318c587d9b7f60a409e096250770","observation_id":"a17d2636-86c6-447b-8a90-e39e5ad9c0d5","resolution":{"observed_at":"2026-08-14T11:16:58.648381Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:58.626156Z","title":"A dynamic game for electricity load management in neighborho od area networks,","venue":null,"work_id":"1c5b4c14-0ced-4c9e-8943-7a32805e605b","year":2016},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.263526Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:73c6ecb26e1cb7138b0f160e9684886a6fdee922ecafeb4b752f6110b1b46022","observation_id":"4d3887a9-6d70-4ee7-8019-4a47c68cefa1","resolution":{"observed_at":"2026-08-14T11:16:58.631229Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-14T11:16:59.269889Z","title":"Available: https://arxiv.org/abs/1901","venue":null,"work_id":"f825fc25-136d-4034-9e02-ff0863bd4c29","year":1901},"citing_paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading","version":1},"reference_index":2019,"source":"pdf_text","source_observed_at":"2026-08-14T11:16:58.045534Z"},"links":{"citing_paper":"/paper/1908.09449"},"observation_digest":"sha256:3d921d918ea13dc3d593db4b3a49e3cc5acd5af22dfa670772db2d3a7138a2c9","observation_id":"f8ccb72f-f4fc-42ed-9c95-6caa86ebba95","resolution":{"observed_at":"2026-08-14T11:16:59.274578Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-15T06:32:42.880941+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"1908.09449","last_updated":"2019-08-26T03:28:42Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-16T03:25:26.856685Z","submitted_at":"2019-08-26T03:28:42Z","title":"Grid Influenced Peer-to-Peer Energy Trading"},"reference_resolution":{"displayed":48,"state_counts":{"malformed_identifier":0,"metadata_mismatch":2,"parse_uncertain":0,"unresolved":4,"verified_exact":0,"verified_fuzzy":42},"total_outbound_references":48},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-15T06:32:42.880941+00:00","source":"crossref"},{"observed_at":"2026-08-15T06:32:39.529945+00:00","source":"retraction_watch"}],"thesis":"As of 16 August 2026, this Paper Citation Record lists 48 of 48 outbound references and 0 inbound Pith citation observations for arXiv:1908.09449."}