{"as_of":"2026-08-08T19:14:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:c0f188353805eabb68b22024651b4a1814167c3519ec374e22855a4a2b0da440","coverage":[{"denominator":0,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":2,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":2,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":2,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":2,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T15:03:39.296369Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"pith","source_observed_at":"2026-08-07T15:03:43.063380Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2004.08434","last_updated":"2020-04-17T19:56:46Z","snapshot_observed_at":"2026-08-08T16:24:32.373300Z","submitted_at":"2020-04-17T19:56:46Z","title":"Projection-Cost-Preserving Sketches: Proof Strategies and Constructions","version":1},"cited_work":{"arxiv_id":"2004.08434","doi":null,"metadata_source":"pith","pith_arxiv_id":"2004.08434","snapshot_observed_at":"2026-08-07T15:03:43.063380Z","title":"Projection-Cost-Preserving Sketches: Proof Strategies and Constructions","venue":"cs.DS","work_id":"de609597-3a33-4276-a6c6-3c677eb78874","year":2020},"citing_paper":{"arxiv_id":"2505.16937","last_updated":"2025-09-06T14:27:10Z","snapshot_observed_at":"2026-08-07T14:50:27.040751Z","submitted_at":"2025-05-22T17:27:40Z","title":"Quasi-optimal hierarchically semi-separable matrix approximation","version":2},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-07T15:03:39.296369Z"},"links":{"cited_paper":"/paper/2004.08434","citing_paper":"/paper/2505.16937"},"observation_digest":"sha256:5c48806fc395455a486d80a25f7b889e7e410e0f84f9025090ab5f69e11c9ad5","observation_id":"2adad136-b7cd-4221-9b54-77779b6ed9f3","resolution":{"observed_at":"2026-08-07T15:03:43.138855Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2004.08434","last_updated":"2020-04-17T19:56:46Z","snapshot_observed_at":"2026-08-08T16:24:32.373300Z","submitted_at":"2020-04-17T19:56:46Z","title":"Projection-Cost-Preserving Sketches: Proof Strategies and Constructions","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2004.08434","snapshot_observed_at":"2026-08-03T08:39:55.802074Z","title":"arXiv preprint arXiv:2004.08434 , year=","venue":null,"work_id":null,"year":2004},"citing_paper":{"arxiv_id":"2607.29361","last_updated":"2026-07-31T12:49:16Z","snapshot_observed_at":"2026-08-08T05:40:38.059703Z","submitted_at":"2026-07-31T12:49:16Z","title":"A recursive butterfly factorization with optimality guarantees","version":1},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-08-03T08:39:55.802074Z"},"links":{"cited_paper":"/paper/2004.08434","citing_paper":"/paper/2607.29361"},"observation_digest":"sha256:65b9ec83c38ad3d66f9b622618e98c776d9f24a0e5a76b4fcf93f73f9dc6550d","observation_id":"68ded9f5-083d-4f5a-a697-a28d294f9066","resolution":{"observed_at":"2026-08-03T08:39:55.802074Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/2004.08434/citation-record","integrity":"/paper/2004.08434/integrity","json":"/paper/2004.08434/citation-record.json","paper":"/paper/2004.08434"},"outbound":[],"paper":{"arxiv_id":"2004.08434","last_updated":"2020-04-17T19:56:46Z","latest_version":1,"primary_category":"cs.DS","snapshot_observed_at":"2026-08-08T16:24:32.373300Z","submitted_at":"2020-04-17T19:56:46Z","title":"Projection-Cost-Preserving Sketches: Proof Strategies and Constructions"},"reference_resolution":{"displayed":0,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":0},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 0 of 0 outbound references and 2 inbound Pith citation observations for arXiv:2004.08434."}