{"as_of":"2026-08-08T12:10:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:965eb457262f17118a9420e1a18195ac75117faeb954c00dc6f6eafbb9a1396f","coverage":[{"denominator":0,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":3,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":3,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":3,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":3,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T11:35:51.286119Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"arxiv_reference","source_observed_at":"2026-05-25T06:25:23.706168Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2203.10176","last_updated":"2022-07-12T19:40:11Z","snapshot_observed_at":"2026-07-06T12:49:43.715551Z","submitted_at":"2022-03-18T22:02:24Z","title":"Optimizing Transmission Infrastructure Investments to Support Line De-energization for Mitigating Wildfire Ignition Risk","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2203.10176","snapshot_observed_at":"2026-08-07T11:35:51.286119Z","title":"Optimizing transmission infrastructure investments to support line de-energization for mitigating wildfire ignition risk,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2506.02234","last_updated":"2025-06-02T20:27:04Z","snapshot_observed_at":"2026-08-07T11:25:33.403433Z","submitted_at":"2025-06-02T20:27:04Z","title":"Second-Order-Cone Formulations of Power Flow for Topology Optimization","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T11:35:51.286119Z"},"links":{"cited_paper":"/paper/2203.10176","citing_paper":"/paper/2506.02234"},"observation_digest":"sha256:eaa49c08c5d982677596e3e17eb1d9d3c999e2d5851225d0ba27f4519098007e","observation_id":"a5b8cc64-1a13-428e-bc52-d2bcef36eaf7","resolution":{"observed_at":"2026-08-07T11:35:51.286119Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2203.10176","last_updated":"2022-07-12T19:40:11Z","snapshot_observed_at":"2026-07-06T12:49:43.715551Z","submitted_at":"2022-03-18T22:02:24Z","title":"Optimizing Transmission Infrastructure Investments to Support Line De-energization for Mitigating Wildfire Ignition Risk","version":2},"cited_work":{"arxiv_id":"2203.10176","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2203.10176","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"576744d5-ac26-4c3b-ab60-1ff729b16b29","year":2022},"citing_paper":{"arxiv_id":"2605.07880","last_updated":"2026-05-21T19:57:33Z","snapshot_observed_at":"2026-07-31T17:57:12.177141Z","submitted_at":"2026-05-08T15:33:10Z","title":"Robust Capacity Expansion under Wildfire Ignition Risk and High Renewable Penetration","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-05-11T02:15:04.089795Z"},"links":{"cited_paper":"/paper/2203.10176","citing_paper":"/paper/2605.07880"},"observation_digest":"sha256:1ec8b53c5764c4a739f7ffed5dfc8ef3215225a57b756d917b77639ed71681e1","observation_id":"1f4b55ad-6349-4832-a087-090e9611326d","resolution":{"observed_at":"2026-05-11T03:50:54.967458Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2203.10176","last_updated":"2022-07-12T19:40:11Z","snapshot_observed_at":"2026-07-06T12:49:43.715551Z","submitted_at":"2022-03-18T22:02:24Z","title":"Optimizing Transmission Infrastructure Investments to Support Line De-energization for Mitigating Wildfire Ignition Risk","version":2},"cited_work":{"arxiv_id":"2203.10176","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2203.10176","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"576744d5-ac26-4c3b-ab60-1ff729b16b29","year":2022},"citing_paper":{"arxiv_id":"2605.07880","last_updated":"2026-05-21T19:57:33Z","snapshot_observed_at":"2026-07-31T17:57:12.177141Z","submitted_at":"2026-05-08T15:33:10Z","title":"Robust Capacity Expansion under Wildfire Ignition Risk and High Renewable Penetration","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-05-25T06:23:35.334374Z"},"links":{"cited_paper":"/paper/2203.10176","citing_paper":"/paper/2605.07880"},"observation_digest":"sha256:e49b05c94ba99ba72d477c1cc94a5df20a6a738a5d2f04818de5a15e3e7ababb","observation_id":"b22e3e6a-8582-4de3-ba5b-47134777599f","resolution":{"observed_at":"2026-05-25T06:25:23.709409Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2203.10176/citation-record","integrity":"/paper/2203.10176/integrity","json":"/paper/2203.10176/citation-record.json","paper":"/paper/2203.10176"},"outbound":[],"paper":{"arxiv_id":"2203.10176","last_updated":"2022-07-12T19:40:11Z","latest_version":2,"primary_category":"eess.SY","snapshot_observed_at":"2026-07-06T12:49:43.715551Z","submitted_at":"2022-03-18T22:02:24Z","title":"Optimizing Transmission Infrastructure Investments to Support Line De-energization for Mitigating Wildfire Ignition Risk"},"reference_resolution":{"displayed":0,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":0},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 0 of 0 outbound references and 3 inbound Pith citation observations for arXiv:2203.10176."}