{"as_of":"2026-08-12T17:47:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:ac2438878278b76109f717434727d76ec2a1c85ecb5431e0e56d70645c189231","coverage":[{"denominator":0,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":4,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":4,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-12T06:34:41.77262+00:00","state":"measured"},{"denominator":4,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":4,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-12T14:07:24.405888Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"pith","source_observed_at":"2026-08-10T23:12:22.481378Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2309.07879","last_updated":"2023-09-14T17:24:45Z","snapshot_observed_at":"2026-07-06T16:18:37.399390Z","submitted_at":"2023-09-14T17:24:45Z","title":"Acceleration by Stepsize Hedging I: Multi-Step Descent and the Silver Stepsize Schedule","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2309.07879","snapshot_observed_at":"2026-08-12T14:07:24.405888Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2411.15717","last_updated":"2024-11-24T04:58:36Z","snapshot_observed_at":"2026-08-12T13:56:46.017061Z","submitted_at":"2024-11-24T04:58:36Z","title":"Learning Algorithm Hyperparameters for Fast Parametric Convex Optimization","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-12T14:07:24.405888Z"},"links":{"cited_paper":"/paper/2309.07879","citing_paper":"/paper/2411.15717"},"observation_digest":"sha256:8be4931a484939e07795f9557ac5bbc8971abc3ed2e8cd70f87e009181c04545","observation_id":"12ae982b-93e8-4f54-956a-b54e87bb17f7","resolution":{"observed_at":"2026-08-12T14:07:24.405888Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2309.07879","last_updated":"2023-09-14T17:24:45Z","snapshot_observed_at":"2026-07-06T16:18:37.399390Z","submitted_at":"2023-09-14T17:24:45Z","title":"Acceleration by Stepsize Hedging I: Multi-Step Descent and the Silver Stepsize Schedule","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2309.07879","snapshot_observed_at":"2026-08-12T12:06:30.331727Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2411.17668","last_updated":"2024-12-08T11:22:26Z","snapshot_observed_at":"2026-08-12T11:49:15.208011Z","submitted_at":"2024-11-26T18:29:44Z","title":"Anytime Acceleration of Gradient Descent","version":2},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-12T12:06:30.331727Z"},"links":{"cited_paper":"/paper/2309.07879","citing_paper":"/paper/2411.17668"},"observation_digest":"sha256:30770c38f1ea79c47f75d27270a8e4de27ded16b4ebd307f3bf81582e40736e5","observation_id":"7fc3664f-65f8-4720-8c00-5cdd7a6002e1","resolution":{"observed_at":"2026-08-12T12:06:30.331727Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2309.07879","last_updated":"2023-09-14T17:24:45Z","snapshot_observed_at":"2026-07-06T16:18:37.399390Z","submitted_at":"2023-09-14T17:24:45Z","title":"Acceleration by Stepsize Hedging I: Multi-Step Descent and the Silver Stepsize Schedule","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2309.07879","snapshot_observed_at":"2026-08-11T20:34:16.683221Z","title":"Acceleration by Stepsize Hedging I: Multi-Step Descent and the Silver Stepsize Schedule","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2412.05790","last_updated":"2026-05-29T19:51:57Z","snapshot_observed_at":"2026-08-11T20:19:12.501293Z","submitted_at":"2024-12-08T03:01:34Z","title":"Acceleration by Random Stepsizes: Hedging, Equalization, and the Arcsine Stepsize Schedule","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-11T20:34:16.683221Z"},"links":{"cited_paper":"/paper/2309.07879","citing_paper":"/paper/2412.05790"},"observation_digest":"sha256:4502e15e3f29112090553dfb0a30dbe6ae867b32c7c0b3cc2c308472489c92c4","observation_id":"230ed3d8-fd9c-4b25-a546-7a820f36d383","resolution":{"observed_at":"2026-08-11T20:34:16.683221Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2309.07879","last_updated":"2023-09-14T17:24:45Z","snapshot_observed_at":"2026-07-06T16:18:37.399390Z","submitted_at":"2023-09-14T17:24:45Z","title":"Acceleration by Stepsize Hedging I: Multi-Step Descent and the Silver Stepsize Schedule","version":1},"cited_work":{"arxiv_id":"2309.07879","doi":null,"metadata_source":"pith","pith_arxiv_id":"2309.07879","snapshot_observed_at":"2026-08-10T23:12:22.481378Z","title":"Acceleration by Stepsize Hedging I: Multi-Step Descent and the Silver Stepsize Schedule","venue":"math.OC","work_id":"44a71fe3-1f8b-4168-a792-44379cddab07","year":2023},"citing_paper":{"arxiv_id":"2412.21068","last_updated":"2024-12-30T16:35:47Z","snapshot_observed_at":"2026-08-11T13:30:47.773134Z","submitted_at":"2024-12-30T16:35:47Z","title":"Finite Horizon Optimization: Framework and Applications","version":1},"reference_index":2018,"source":"pdf_text","source_observed_at":"2026-08-10T23:12:21.353968Z"},"links":{"cited_paper":"/paper/2309.07879","citing_paper":"/paper/2412.21068"},"observation_digest":"sha256:e2b92171b4aedb4aa300d9e44bdac9b0f5b388bd670ad14ac135004b4d39bf28","observation_id":"3fc8eec5-94cc-41ef-bbc3-9fdc61a8131d","resolution":{"observed_at":"2026-08-10T23:12:22.486211Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2309.07879/citation-record","integrity":"/paper/2309.07879/integrity","json":"/paper/2309.07879/citation-record.json","paper":"/paper/2309.07879"},"outbound":[],"paper":{"arxiv_id":"2309.07879","last_updated":"2023-09-14T17:24:45Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-07-06T16:18:37.399390Z","submitted_at":"2023-09-14T17:24:45Z","title":"Acceleration by Stepsize Hedging I: Multi-Step Descent and the Silver Stepsize Schedule"},"reference_resolution":{"displayed":0,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":0},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"thesis":"As of 12 August 2026, this Paper Citation Record lists 0 of 0 outbound references and 4 inbound Pith citation observations for arXiv:2309.07879."}