{"as_of":"2026-08-07T16:26:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:60e92c7742fafe31c2b8ba416bc8df6ff457e559f381d8022bd6b1615acfd917","coverage":[{"denominator":0,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":2,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":2,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-07T06:34:17.273281+00:00","state":"measured"},{"denominator":2,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":2,"source":"paper_references, paper_reference_links","source_observed_at":"2026-06-26T18:35:47.724480Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"arxiv_reference","source_observed_at":"2026-07-04T02:59:26.393868Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2403.13231","last_updated":"2024-06-13T15:12:10Z","snapshot_observed_at":"2026-07-06T17:47:26.534826Z","submitted_at":"2024-03-20T01:41:42Z","title":"Design, construction, and operation of a 1-ton Water-based Liquid scintillator detector at Brookhaven National Laboratory","version":4},"cited_work":{"arxiv_id":"2403.13231","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2403.13231","snapshot_observed_at":"2026-07-04T02:59:26.393868Z","title":"Design, construction, and operation of a 1-ton water-based liquid scintillator detector at Brookhaven National Laboratory","venue":null,"work_id":"eb7eefff-1bd9-4f65-af48-5523e4d55134","year":2024},"citing_paper":{"arxiv_id":"2605.10683","last_updated":"2026-05-11T14:59:55Z","snapshot_observed_at":"2026-08-02T07:47:25.603957Z","submitted_at":"2026-05-11T14:59:55Z","title":"Construction, commissioning, and beam test of a pilot 3D-projection opaque water-based liquid scintillator detector","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-05-12T05:16:08.184652Z"},"links":{"cited_paper":"/paper/2403.13231","citing_paper":"/paper/2605.10683"},"observation_digest":"sha256:ec7a2f7eae8fbc17aac2cde2e7b0b4ed358994d8be726e3cc6fe7a1af064da24","observation_id":"1986ea04-f2b3-45e5-b3dd-515b337bd630","resolution":{"observed_at":"2026-05-12T05:16:23.961709Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2403.13231","last_updated":"2024-06-13T15:12:10Z","snapshot_observed_at":"2026-07-06T17:47:26.534826Z","submitted_at":"2024-03-20T01:41:42Z","title":"Design, construction, and operation of a 1-ton Water-based Liquid scintillator detector at Brookhaven National Laboratory","version":4},"cited_work":{"arxiv_id":"2403.13231","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2403.13231","snapshot_observed_at":"2026-07-04T02:59:26.393868Z","title":"Design, construction, and operation of a 1-ton water-based liquid scintillator detector at Brookhaven National Laboratory","venue":null,"work_id":"eb7eefff-1bd9-4f65-af48-5523e4d55134","year":2024},"citing_paper":{"arxiv_id":"2606.19299","last_updated":"2026-06-17T17:24:16Z","snapshot_observed_at":"2026-07-06T23:54:37.596257Z","submitted_at":"2026-06-17T17:24:16Z","title":"Probing Long-Lived Particle Production in Muon Decays at the SNS with a Highly Capable Hydrocarbon Detector","version":1},"reference_index":96,"source":"pdf_text","source_observed_at":"2026-06-26T18:35:47.724480Z"},"links":{"cited_paper":"/paper/2403.13231","citing_paper":"/paper/2606.19299"},"observation_digest":"sha256:1358c5de66d12e4a6f6f4716ee0d213c0efa9fed87d75b36158659b063df21d7","observation_id":"0aa6cbb6-2fce-44c2-b2d2-c999f0af0a5d","resolution":{"observed_at":"2026-07-04T02:59:26.395832Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2403.13231/citation-record","integrity":"/paper/2403.13231/integrity","json":"/paper/2403.13231/citation-record.json","paper":"/paper/2403.13231"},"outbound":[],"paper":{"arxiv_id":"2403.13231","last_updated":"2024-06-13T15:12:10Z","latest_version":4,"primary_category":"physics.ins-det","snapshot_observed_at":"2026-07-06T17:47:26.534826Z","submitted_at":"2024-03-20T01:41:42Z","title":"Design, construction, and operation of a 1-ton Water-based Liquid scintillator detector at Brookhaven National Laboratory"},"reference_resolution":{"displayed":0,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":0},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"thesis":"As of 7 August 2026, this Paper Citation Record lists 0 of 0 outbound references and 2 inbound Pith citation observations for arXiv:2403.13231."}