{"as_of":"2026-08-13T06:49:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:925c3b15e344d100ef1326214903d783c266c6c876bc8c0e62ea4a378e97e626","coverage":[{"denominator":33,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":33,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-12T15:57:45.762774Z","state":"measured"},{"denominator":33,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":33,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-13T06:32:02.005865+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2411.13783/citation-record","integrity":"/paper/2411.13783/integrity","json":"/paper/2411.13783/citation-record.json","paper":"/paper/2411.13783"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.587285Z","title":null,"venue":null,"work_id":"3535fe72-4a14-49ab-8ba3-e06ae6a5cf3b","year":2022},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.621231Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:4d684bc66aa9661cba797696fc9e8c7eb9651df6822a9179dd6f1d858b4e138a","observation_id":"65c04b23-022d-4148-b303-b227d82cf47e","resolution":{"observed_at":"2026-08-12T15:57:46.591301Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.574770Z","title":null,"venue":null,"work_id":"ac1e53dc-cf39-4c01-aad2-9baf82b128cb","year":2015},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.625943Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:59f4b2440dcb95107546db6268207936c66c1937591a46e1686b7fc382d1e486","observation_id":"30ae7494-2a56-4bb2-9740-db6e0eede04a","resolution":{"observed_at":"2026-08-12T15:57:46.578594Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.562634Z","title":"catf.us/2020/10/state-and-regional-decarbonization-commitments/","venue":null,"work_id":"0b0c86c3-857e-4f78-a21d-09ef8278d7c2","year":2020},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.630092Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:20bcf1b627c44085f37c1a0931bb82c2967b3342c4e317502ca751211bd71781","observation_id":"39003ff3-5184-4a69-84b7-6fdd42b5bf34","resolution":{"observed_at":"2026-08-12T15:57:46.566765Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.548978Z","title":null,"venue":null,"work_id":"c4122623-a004-47bb-9694-8089a0f755a7","year":1982},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.634506Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:d9aa042ee468db2d456f499a1a003917c383f916e33aac46704d95177362563d","observation_id":"3b280400-ebae-4db8-9835-d77b5234a38d","resolution":{"observed_at":"2026-08-12T15:57:46.554028Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.536778Z","title":null,"venue":null,"work_id":"66949eb4-25f2-4930-8ab6-25130cc55176","year":2021},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.639146Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:efa2ceb801ed8554c85f3e8f4df86cf7bfed060b739d9f3f93bc8a2e478589aa","observation_id":"febaf655-f7d2-443a-bd42-daafd339c34c","resolution":{"observed_at":"2026-08-12T15:57:46.540793Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.524631Z","title":null,"venue":null,"work_id":"a6c3f514-0cd0-48dd-bf74-697e60c7365c","year":2022},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.643341Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:4ecfa367964df6d24fa51d44cb52acedaee85bb829b5d54601eb5040716ca5db","observation_id":"1adfa36e-8d55-4218-9d39-80f45f6c76a8","resolution":{"observed_at":"2026-08-12T15:57:46.528755Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.511403Z","title":null,"venue":null,"work_id":"fa649827-b4b0-499f-80e4-dc9f7ec78b09","year":null},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.648141Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:dfd84d0234c52df6e06c328cc542671f31c9e8d651082123ffc66b899f1bd187","observation_id":"9fea19b7-5c2e-4e35-bb65-6ec2365530f2","resolution":{"observed_at":"2026-08-12T15:57:46.515630Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1088/2753-3751/","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:45.836969Z","title":null,"venue":null,"work_id":"c8f04f71-1161-46e1-b24b-59408b6adb4d","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.652066Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:f6b31cd88e6e437cd08e36441a729be7635e0eb7165f22b1b0bb48f92ced741a","observation_id":"b57496e1-7b4d-4389-b46c-dd39b7fa6f84","resolution":{"observed_at":"2026-08-12T15:57:45.842047Z","resolver_source":"doi_truncated","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.499517Z","title":null,"venue":null,"work_id":"53eb99f0-66ef-4121-8618-a322a08bb512","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.656464Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:c19d1bf25fc38ca2699cb02de6239a5836eae6c14cff04cd8eae47c0fea73a67","observation_id":"900c9fc9-edc3-4038-95cd-2cbf07ed35c6","resolution":{"observed_at":"2026-08-12T15:57:46.503596Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.488029Z","title":null,"venue":null,"work_id":"6cce110b-f712-44cb-b897-00e4c5fff0dd","year":2013},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.660379Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:b4b301ae6b686e499c6b4710e349ef9cab6386d8078a0ec51ad198d306664e22","observation_id":"67690a0d-cd5d-470f-9c9b-53e2dd96a754","resolution":{"observed_at":"2026-08-12T15:57:46.492163Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.475497Z","title":null,"venue":null,"work_id":"654474eb-9be9-4a0b-a7cb-5335081104db","year":2019},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.667390Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:c4f7f92eb9ce282a69a0747d81f1f9331c1dc6dd3706aa4b6b9f37763549919c","observation_id":"933fb4dc-b714-4826-aad6-db339107783e","resolution":{"observed_at":"2026-08-12T15:57:46.479913Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"records/1091003","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.251391Z","title":null,"venue":null,"work_id":"366f8582-16b9-49ab-a9f4-f5c69d666218","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.674330Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:0ffb2889111b8a1f57a479e40c1498180dcc415141ed31e667a3dd054139ebca","observation_id":"67e0c0c4-4ee2-4a21-b83b-2af0018b7782","resolution":{"observed_at":"2026-08-12T15:57:46.260758Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.463005Z","title":null,"venue":null,"work_id":"f84ffc71-b28e-40d0-86a9-a6356fe3906c","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.678910Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:59a8816a45265770f17960025aed1482bd171709fe5848f51fa4f18eaa15145d","observation_id":"20e314ad-7282-4fc2-be8f-46b20584a756","resolution":{"observed_at":"2026-08-12T15:57:46.467545Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"records/1119421","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.181067Z","title":"org/records/11194213","venue":null,"work_id":"f8ed5104-3c31-4433-880e-933bf6ad1517","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.683448Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:fef9848b47ddf04d4d904090d5adc4417f739b22ebecf911a74d98cd47721b74","observation_id":"b111b9d0-8d21-498c-bab3-0b60c78446a0","resolution":{"observed_at":"2026-08-12T15:57:46.189805Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.448011Z","title":"eia.gov/outlooks/aeo/","venue":null,"work_id":"758f980f-12d4-4731-9a38-bd7c62396e90","year":2023},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.688366Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:414c83bd18bea35a47794f9aa2f03343d537e2180d1eb9fe77ae067718f543d7","observation_id":"9e2d7218-253a-4cf0-86de-f8813642ca89","resolution":{"observed_at":"2026-08-12T15:57:46.452609Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"records/7472137","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.102082Z","title":null,"venue":null,"work_id":"c79cc418-46ac-4c03-9664-5dd7cd20a39c","year":2022},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.692589Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:c671e509449507c3b320911172f1a13f164affc3598f6d9d4501930612885591","observation_id":"d1bfef0f-3889-4138-9494-a03d13f2ff12","resolution":{"observed_at":"2026-08-12T15:57:46.111849Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.435154Z","title":"Energy Information Administration (EIA) URL https://www.eia.gov/electricity/data/eia860m/index.php","venue":null,"work_id":"091a192c-1ff6-4ce7-87ca-0e01ad899857","year":null},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.696628Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:9544a65c420c023762dc8018cc86b65baf54a400a48ac4e3db34eb82fe90538d","observation_id":"fa7655e2-af32-4fad-b0c0-c20742935d7f","resolution":{"observed_at":"2026-08-12T15:57:46.439638Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"records/1419455","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.013668Z","title":null,"venue":null,"work_id":"ba3546d5-7bde-420d-942e-bae8a822743f","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.701102Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:2ca4c9a27acbab6ba491bf0a851f99a8837f619adb6de7ecb397825a59d99488","observation_id":"34996273-04cd-47d2-a842-7b408cfa802b","resolution":{"observed_at":"2026-08-12T15:57:46.021886Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"biblio/1459351","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:45.936520Z","title":null,"venue":null,"work_id":"43181a08-5209-45ff-934e-48d01d62fb81","year":2018},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.705169Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:3915aba79319c9a290c07a4c3084956084b416fee1867cb197b2a8b6b47e1fdc","observation_id":"be368f12-f23f-43c3-a367-f4824b52655f","resolution":{"observed_at":"2026-08-12T15:57:45.944742Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.5281/zenodo.8087805","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:45.823252Z","title":null,"venue":null,"work_id":"84965129-c80a-4c37-a556-f560e82ea549","year":2023},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.709176Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:e64dfd4b6dc1ede078d8e0092e61f28cb009a2aa84d66d12f4078399d5382877","observation_id":"32c5c646-b9cf-4fb2-b607-4c05858e321d","resolution":{"observed_at":"2026-08-12T15:57:45.828304Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.422975Z","title":"nrel.gov/electricity/2023/index","venue":null,"work_id":"d0e0129d-2d5e-4091-9142-dbb81fc09bc8","year":2023},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.713211Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:80ac45b1c4d98832879002eca3d212336acac58932c754130d26545e4260396f","observation_id":"454d6271-667c-47b2-8c0e-44f66572a502","resolution":{"observed_at":"2026-08-12T15:57:46.427011Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.408686Z","title":null,"venue":null,"work_id":"a71c55f3-5909-4c05-a290-ebe81ad33da9","year":2020},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.717106Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:82d5261f2082713da9a58861dafe05922ec642123741dc66ecabcb4d4e98a569","observation_id":"dbb8c99a-5451-4116-9a4b-6003caebe69a","resolution":{"observed_at":"2026-08-12T15:57:46.413468Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.391029Z","title":"Reiner lemoine institute, berlin","venue":null,"work_id":"92cf8978-da33-4b8c-b6d2-1a9b95aab4ce","year":2023},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.720972Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:09bf54c1bb37bfd1781a6de18c359b7920b45d4ddcd9aefcf29ad09f66702baa","observation_id":"a75dfac1-656a-4e3d-bed4-db63199683d4","resolution":{"observed_at":"2026-08-12T15:57:46.396555Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.376134Z","title":null,"venue":null,"work_id":"6b86e776-b139-465b-a50d-89f6ddbef533","year":2023},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.724779Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:8bd0b180c39cae391267e81857d7178a5b34f0cc9afbabc397fcf51502911021","observation_id":"4a1b7a17-5856-440f-8203-0b573e0b2a3b","resolution":{"observed_at":"2026-08-12T15:57:46.380906Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.362741Z","title":null,"venue":null,"work_id":"654a4047-0877-4c9f-ad57-594976848320","year":2022},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.729062Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:23feb609b4a469ba48c9250721c1956ba8490a69226ac893d05db978ade8c330","observation_id":"23673bba-1e29-45ee-866e-b5ff85b5e3a7","resolution":{"observed_at":"2026-08-12T15:57:46.367154Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.347933Z","title":null,"venue":null,"work_id":"db70be5e-8bfe-445e-a3e9-f4f704a7e495","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.733118Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:87ca5c37024a853e306c338d4f7901c64ae2bd1f2e67081eff7d5ac72435a0de","observation_id":"5bdba7cc-df30-4c9e-888a-6fc26aa47089","resolution":{"observed_at":"2026-08-12T15:57:46.354003Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:45.737246Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.737246Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:78e4d75454edf3c5a449a06c58667a803f035e6112bcb9e5ae29dca2576191f1","observation_id":"eaa43202-2ac2-42ce-bf2e-89f363eeefc7","resolution":{"observed_at":"2026-08-12T15:57:45.737246Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1088/1748-9326/ad0d3b","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:45.797690Z","title":null,"venue":null,"work_id":"220eede0-9a89-4dce-aa50-e59555b538f7","year":2023},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.742189Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:6435fe43c4a6867bfaa3461e275fe2600be9816d2585c0c3489f356b0e8f3b1d","observation_id":"d2098086-b3dd-427f-a799-941ea775a7ab","resolution":{"observed_at":"2026-08-12T15:57:45.804848Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.334535Z","title":null,"venue":null,"work_id":"3e6695e6-21d5-4e1d-bd75-6f86f276a33c","year":2023},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.746539Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:658d9636ab5ec0f32b939ab1151a56a1a340b2c6d2c47ba1f77b08f57c4e8d15","observation_id":"ec467a0e-2d91-4be8-b78a-31e51a5a84e0","resolution":{"observed_at":"2026-08-12T15:57:46.338974Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.320998Z","title":null,"venue":null,"work_id":"5dd56f95-6fd0-40f8-ac7d-d0d2360f765a","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.750469Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:19cc3de7c56e63939336bf3986ee2588fbc973f34cf3b614dada646f12d0ccfc","observation_id":"1bfba950-1aaa-4c2c-8d8f-f4d29d4d8609","resolution":{"observed_at":"2026-08-12T15:57:46.325013Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.306346Z","title":null,"venue":null,"work_id":"72447c35-0586-4575-b488-b6f3ad2d28fe","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.754319Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:620e45998348a8634f6d1f864b9251cc840fa960da735f83e7a185158dd873aa","observation_id":"06a0408e-326a-4529-b502-99cf949041f7","resolution":{"observed_at":"2026-08-12T15:57:46.312225Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.290605Z","title":null,"venue":null,"work_id":"b050a25e-ed5f-4ee2-86ca-295dd19609b5","year":2003},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.758251Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:ca93b8439ba8852fb62ae079aae5b94743b5201bdf996b3e76481212117aad61","observation_id":"e00aa519-ec61-400b-9c50-c240faa5e475","resolution":{"observed_at":"2026-08-12T15:57:46.296306Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T15:57:46.270292Z","title":null,"venue":null,"work_id":"9b757641-9f00-45a8-bae3-704364d257c6","year":2024},"citing_paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models","version":2},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-12T15:57:45.762774Z"},"links":{"citing_paper":"/paper/2411.13783"},"observation_digest":"sha256:b06351e33388eb6b4068de7f404950ba4e83bfb46f3f58080be9db18a53fe647","observation_id":"e1059ff3-91dd-4def-aca7-d01ff83627d2","resolution":{"observed_at":"2026-08-12T15:57:46.274600Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2411.13783","last_updated":"2025-04-05T20:53:14Z","latest_version":2,"primary_category":"econ.GN","snapshot_observed_at":"2026-08-12T15:51:15.863848Z","submitted_at":"2024-11-21T01:53:23Z","title":"Process and Policy Insights from an Intercomparison of Open Electricity System Capacity Expansion Models"},"reference_resolution":{"displayed":33,"state_counts":{"malformed_identifier":1,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":20,"verified_exact":7,"verified_fuzzy":5},"total_outbound_references":33},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"thesis":"As of 13 August 2026, this Paper Citation Record lists 33 of 33 outbound references and 0 inbound Pith citation observations for arXiv:2411.13783."}