{"as_of":"2026-08-13T08:37:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:94445a820a897f192ab09842d5874f9d8ea1ee59ff8bf032ea0255353535acbb","coverage":[{"denominator":42,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":42,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-12T14:58:39.571186Z","state":"measured"},{"denominator":42,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":42,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-13T06:32:02.005865+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2411.15249/citation-record","integrity":"/paper/2411.15249/integrity","json":"/paper/2411.15249/citation-record.json","paper":"/paper/2411.15249"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:41.202321Z","title":"An extension to fuzzy developed failure mode and effects analysis (fdfmea) application for aircraft landing system,","venue":null,"work_id":"c8a9853a-5128-4ee4-852d-ced4126408e2","year":2017},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:38.816330Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:24f43b3391e76926f3bcae84f7e687360b639641b2758ae0f3331502d32a7c18","observation_id":"07429514-94da-43e6-8065-7fb7b6359a57","resolution":{"observed_at":"2026-08-12T14:58:41.298036Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:41.191299Z","title":"Launch control safety study,","venue":null,"work_id":"fc5d77d6-1274-4931-b48b-a9cfa4e35ae7","year":1961},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:38.895835Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:01339648b84caffd87aaa49673dac8fcfeaaed37ce892d8ebae59b941332432e","observation_id":"8eb466ca-e589-450e-8986-0297e0ad85ab","resolution":{"observed_at":"2026-08-12T14:58:41.194754Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:41.178392Z","title":"Fault-tree analysis by fuzzy probability,","venue":null,"work_id":"3f4a83f1-2adc-46c3-b62e-fb0101e78bcf","year":1983},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:38.965282Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:1e5fea5ee3118d1c3a170b7ad0f178f9e04c89488dc2e131f06cca9257db00d2","observation_id":"a3160feb-5edd-409d-9d77-2c841f159916","resolution":{"observed_at":"2026-08-12T14:58:41.183417Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:41.165669Z","title":"Fuzzy fault tree analysis for fire and explosion of crude oil tanks,","venue":null,"work_id":"ea197564-d8e7-41fd-89e7-5f0fd97e3361","year":2013},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:38.969751Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:fe90ed6fb49e9435d33058c3c39eb4cdcfa66f371df0e899e0a012c426361395","observation_id":"18b8f166-776e-4326-ba3b-f7077b53f3af","resolution":{"observed_at":"2026-08-12T14:58:41.170255Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:41.083032Z","title":"An extension to fuzzy fault tree analysis (ffta) application in petrochemical process industry,","venue":null,"work_id":"7b1d100a-a368-46a2-98b5-7286fbf5f5e1","year":2014},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:38.973723Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:81e68afa5467cbcf99672047fbbce28ed3ad3682d8b0c5c0c6ba81781b5c860e","observation_id":"a8cfef14-0d47-4742-bad7-a4070e1a9f6a","resolution":{"observed_at":"2026-08-12T14:58:41.144478Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:41.071653Z","title":"Assessment of gas and dust explosion in coal mines by means of fuzzy fault tree analysis,","venue":null,"work_id":"2a90467d-63c2-45ba-aabb-c830d0439824","year":2018},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.014971Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:d434f2e19cc38978897fc13f2457f885eca08844c16bc339abc56a376804cd26","observation_id":"9343ec4c-e993-4733-b281-bb21b2a245cf","resolution":{"observed_at":"2026-08-12T14:58:41.075408Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:41.061290Z","title":"Reliability assessment of solar photovoltaic systems based on fuzzy fault tree analysis,","venue":null,"work_id":"3f460438-64e3-421b-acd0-7276f9bad252","year":2018},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.048612Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:9c1ef487d1a18905b81754feb4b7ef02a3ee6f237c031f8a03e7874a7d43a137","observation_id":"95191626-ef02-44a2-9928-8096f716fad6","resolution":{"observed_at":"2026-08-12T14:58:41.065052Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:41.048488Z","title":"Fuzzy fault tree analysis for coal burst occurrence prob- ability in underground coal mining,","venue":null,"work_id":"f1ff540e-42a2-47c9-b050-8d1dc03a61d8","year":2019},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.052332Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:620f83860588848f5ed1ae3b3aedc76f86f869c55a7228beb6161cd05dae3107","observation_id":"5d482fb7-88e4-4c34-8615-81e4754f75a2","resolution":{"observed_at":"2026-08-12T14:58:41.052198Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.950711Z","title":"An application of fuzzy fault tree analysis for spread mooring systems,","venue":null,"work_id":"eee65ea5-8a44-47cd-bc77-47bd3018132e","year":2011},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.057868Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:dafee43cfc3ac126e163a916ba81eda4b334219049771e23095c8528c845b283","observation_id":"5271d716-6da2-413d-9d8e-5176ae166253","resolution":{"observed_at":"2026-08-12T14:58:41.042017Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.939688Z","title":"Fault tree analysis of chemical cargo contamination by using fuzzy approach,","venue":null,"work_id":"0d0b65e0-da4d-4f8f-82ed-d3fc52e99e7c","year":2015},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.062009Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:dcede35be1a83bb15383ef44afc52170161f1eb5715bd2492a5c007def489817","observation_id":"3454c170-3b53-4b6e-8f71-cf48e645fa8d","resolution":{"observed_at":"2026-08-12T14:58:40.944213Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.929045Z","title":"Failure probability analysis by employing fuzzy fault tree analysis,","venue":null,"work_id":"ec81cd4d-9304-464d-acf5-6b5d73a5b4c5","year":2017},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.103775Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:380cd49d5c04b3e52a6d9e735e727fcb15e3c62fce5dc3ee8491882cf96bd2ff","observation_id":"cb738843-ae57-4af2-83fc-ff01a3e5b1c6","resolution":{"observed_at":"2026-08-12T14:58:40.932535Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.918494Z","title":"A fuzzy bayesian network approach for risk analysis in process industries,","venue":null,"work_id":"d25bafb9-75a9-4cc0-b92c-1631076fcd9a","year":2017},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.120151Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:a8a3a09f35977cb4fd9e98de97d21dd65a326e2f31048d96855fb63cca537dda","observation_id":"562d1429-6df2-4479-8fd8-782c7067fb83","resolution":{"observed_at":"2026-08-12T14:58:40.922480Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.817371Z","title":"Application of fuzzy fault tree analysis (ffta) to maritime industry: A risk analysing of ship mooring operation,","venue":null,"work_id":"b0f69fec-c3fe-4207-8a03-3f4097a3adb4","year":2019},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.124235Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:7fd91e3530d429d40e588a925a49d1b2c2fcd7fc99aef01665ac394b49ee17ee","observation_id":"3fd1ead6-e2a5-4952-b144-3dd10288f08a","resolution":{"observed_at":"2026-08-12T14:58:40.869101Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.805422Z","title":"Fuzzy fault tree analysis for loss of ship steering ability,","venue":null,"work_id":"5ce539ed-1bc4-48fc-ba41-60ace3b9b92a","year":2023},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.128861Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:1c60913f4c5811dd221fdb2a33ac23db28fd3bdfea2fc29209e589924173bfcf","observation_id":"284e8143-26b7-4c9b-ba2f-711c7649fdb8","resolution":{"observed_at":"2026-08-12T14:58:40.809261Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.795660Z","title":"An α-cut interval based if-importance measure for intu- itionistic fuzzy fault tree analysis of subsea oil and gas production system,","venue":null,"work_id":"929a7871-b27b-47f3-88c3-1b8c65c5928e","year":2022},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.133063Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:23c652832f633ccc32ef21b1871679b2df76a3deddb004df38967de106e0be20","observation_id":"be4702d6-d594-41fa-ab2d-cc4449bbb284","resolution":{"observed_at":"2026-08-12T14:58:40.799254Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.773313Z","title":"An integrated approach of intuitionistic fuzzy fault tree and bayesian network analysis applicable to risk analysis of ship mooring operations,","venue":null,"work_id":"8bab57e2-92dd-4614-9fe5-c50e1aad91fd","year":2023},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.137319Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:6c888082ba0ba6fc58b217ad531e79438d744c6438385e3336fd67d4e1aad8c3","observation_id":"41cae484-a5e6-4d76-a8d0-a046681dcbb8","resolution":{"observed_at":"2026-08-12T14:58:40.783967Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.701687Z","title":"Fuzzy logic = computing with words,","venue":null,"work_id":"06b95e11-d9de-48aa-9f99-fe6c3112ffb6","year":1996},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.141161Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:3dfb8bd7b713fd141b91da16890d0140205c13f15ecb2167655432f1a8cfb846","observation_id":"ba924fd6-da8d-498a-9df4-51f176191780","resolution":{"observed_at":"2026-08-12T14:58:40.751094Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.689470Z","title":"Fuzzy system reliability analysis based on level (λ,1) interval-valued fuzzy numbers,","venue":null,"work_id":"05e12818-ac8c-44f3-a1dc-c0fc4b26c8c9","year":2014},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.157501Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:0a76df9f371c87f95666bba2353fe777051bfaa910976432efc070d31d215040","observation_id":"27d4cdba-e54a-4453-8791-2ea73050fe20","resolution":{"observed_at":"2026-08-12T14:58:40.694250Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.678717Z","title":"Fuzzy fault tree analysis using level (λ,ρ) interval-valued fuzzy numbers,","venue":null,"work_id":"6cfe97cd-fc6b-4d1a-9339-aa65fe176c95","year":2015},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.212373Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:bdf25b10db7bae3662649fce7e3d80c226fb2df9b485e9be44f4adac0ba871c1","observation_id":"8285d247-1d06-4a8e-aa7a-4938fa95efb7","resolution":{"observed_at":"2026-08-12T14:58:40.682408Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.648176Z","title":"Aggregation of fuzzy opinions under group de- cision making,","venue":null,"work_id":"c2b7d4f6-2950-4a4b-9256-caeae242ac17","year":1996},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.237468Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:ed68e66e144d3f3d551c7430a36db98b48b29a519f8eaf2577bc5a13699c42c4","observation_id":"8a3580cd-66c8-4fb3-beff-f76e39d2f280","resolution":{"observed_at":"2026-08-12T14:58:40.671855Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.569213Z","title":"Combining probability distributions from experts in risk analysis.,","venue":null,"work_id":"d044d49d-61b7-49f7-8005-718bad5df370","year":1999},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.241747Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:f49f090b3fdd598df65b00717ac746dcf9b7b4d78b2f81e0f8d232e3f73f5b7b","observation_id":"47b019fa-8def-4f5a-b926-256a5036bbdb","resolution":{"observed_at":"2026-08-12T14:58:40.611119Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.527008Z","title":"Consistency control and expert consistency prioritization for ffta by using extent analysis method of trapezoidal fahp,","venue":null,"work_id":"8a180a54-105e-468c-9224-a7791188be08","year":2017},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.246251Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:45b0ab7bf8ad1095f309d1330c54915d6aed3d7b582aa77e7c524d1ee2594dfb","observation_id":"62234fa7-f7e5-4a38-94d7-9f31e4d3ee25","resolution":{"observed_at":"2026-08-12T14:58:40.530485Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.517186Z","title":"Fuzzy fault tree analysis of chlorine gas release hazard in chlor-alkali industry using α-cut interval-based similarity aggregation method.,","venue":null,"work_id":"200b12a9-6317-4a0c-9969-24652ae09dff","year":2022},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.251095Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:cb1567bc5d01a0fe35985983f1e2c777c421f11e5ccbf5c518e9594960ddc9f1","observation_id":"e24810dc-0cf1-4355-ad51-93adec01f2ad","resolution":{"observed_at":"2026-08-12T14:58:40.520966Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.506508Z","title":"Best-worst multi-criteria decision-making method: Some properties and a linear model,","venue":null,"work_id":"a51bfa2e-d87a-4753-87ae-0372f794bf7b","year":2016},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.255448Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:f2ae11bb420dab422c41b43951475d7b6abf492f91fbe784ee4eb6bcf9a2cd0e","observation_id":"c7f5fce1-7c55-42ef-be03-60149c8b77ac","resolution":{"observed_at":"2026-08-12T14:58:40.510195Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.494307Z","title":"Defuzzification in fuzzy controllers,","venue":null,"work_id":"27a207e4-bd83-43e2-91e3-a74b59d988d1","year":1993},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.277233Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:28a37e6e7465fb52894ad0db60aae1027f69f3c66e244aedc23d5f5af53b0645","observation_id":"a81b0a5c-0467-49f9-ae51-a7c1e32ec36a","resolution":{"observed_at":"2026-08-12T14:58:40.498690Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.390432Z","title":"A fuzzy extension of saaty’s priority theory,","venue":null,"work_id":"fa81d7bb-747b-4161-b3d9-19ba6a9f66fd","year":1983},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.332391Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:9e1179113b5a89910fcc77eaa077683088d1c1230dae856993f8b3f78329011a","observation_id":"9cbe2d9d-a8f5-45ca-b526-b8c074c4a3f3","resolution":{"observed_at":"2026-08-12T14:58:40.439260Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.378903Z","title":"A fuzzy programming method for deriving priorities in the analytic hi- erarchy process,","venue":null,"work_id":"d094588a-b161-4d96-b4a7-e1fc9057166b","year":2000},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.335603Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:8349d48b64f866d5d9e4cd447ed89bbde6f3d010a8413f88b2df7c0affe8340a","observation_id":"18495752-44ef-4034-a980-6366e4a24a66","resolution":{"observed_at":"2026-08-12T14:58:40.383211Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.308956Z","title":"Deriving priorities from fuzzy pairwise comparison judgements,","venue":null,"work_id":"0d9ebcd8-4833-4f4d-b71f-cf823d4d5ba3","year":2003},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.340276Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:0c78fcf5799bd801793009749ddf566786c49272de099310b01bc2aaea879d7e","observation_id":"61aa1298-da0e-4349-8c87-12a22033b8dc","resolution":{"observed_at":"2026-08-12T14:58:40.349804Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.296279Z","title":"Application of fuzzy fault tree analysis on oil and gas offshore pipelines,","venue":null,"work_id":"7c57509a-8835-46e3-a7c6-bcfa94a63957","year":2011},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.344228Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:83f371e5e05b7c16f279b09a36d201150ffb448514bf04ac65754d59ee351735","observation_id":"2a8b44c1-bfad-4499-b8fd-78be73a74f54","resolution":{"observed_at":"2026-08-12T14:58:40.301154Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.282401Z","title":"Risk assessment of the ship steering gear failures using fuzzy-bayesian networks,","venue":null,"work_id":"4951d49b-c12e-407c-b964-9120c527ea66","year":2023},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.348729Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:219534caa8b331a7331e08fae97b79db41cc304f9d328e7a53ccc9d90a06778b","observation_id":"159e3f9c-de19-4d68-90bd-b641f4b9b837","resolution":{"observed_at":"2026-08-12T14:58:40.288374Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.240183Z","title":null,"venue":null,"work_id":"7d1b9546-257c-4889-a5c3-c7339f317dc3","year":2015},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.352713Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:3c72548a617407b9903d1dc52ba05e3f69c352ac2e3ffe58934c5ec75174e374","observation_id":"b5074a76-01c3-4c23-8186-748e8039d8d7","resolution":{"observed_at":"2026-08-12T14:58:40.243352Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.230431Z","title":"Zimmermann, Fuzzy Set Theory — and Its Applications","venue":null,"work_id":"968a7cf6-f7a0-4f6c-aa59-8feee5f367ab","year":2001},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.356084Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:5de5442b8580fde86b69d6cc2b3f0e1d63a9979654a7e3d7e2bcfa2f7a56d46e","observation_id":"8f5cafc4-7a99-4ff2-a35b-758edfc81d13","resolution":{"observed_at":"2026-08-12T14:58:40.233770Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.181225Z","title":"Extension of the aras method for decision-making problems with interval-valued triangular fuzzy numbers,","venue":null,"work_id":"2ba66619-3a1f-4d53-99c1-0ecc93af5017","year":2016},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.359425Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:8ab218b453b2cac0f835f488b5c67abc46706b1778e1b4be98b268db3aacde70","observation_id":"4723c1db-10f2-49ff-95d4-be44f5da8503","resolution":{"observed_at":"2026-08-12T14:58:40.221642Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.114979Z","title":"Fuzzy tempo- ral fault tree analysis of dynamic systems,","venue":null,"work_id":"d38480a2-12a7-450a-b255-6cdce6a6c0cc","year":2016},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.409150Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:39831f6492d00c7b771683c2f5e734b0c31cc8f2e33cfe20efda7ac69eea43c3","observation_id":"b0079b00-720e-4cb4-9b1e-acdacd1e2866","resolution":{"observed_at":"2026-08-12T14:58:40.119934Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.103430Z","title":"Similarity measure of the interval-valued fuzzy num- bers and its application in risk analysis in paddy cultivation,","venue":null,"work_id":"49de1301-5b3d-4abf-91af-7b707da40213","year":2022},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.444815Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:577fb8e3201d93777a0f085301c649053d1fb721eb7cd398f7da3823b858f682","observation_id":"6f5aa1ca-1120-4c87-a27e-adc91f6f161c","resolution":{"observed_at":"2026-08-12T14:58:40.107618Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:40.033789Z","title":"Defuzzification in fuzzy controllers,","venue":null,"work_id":"78bb5e53-981f-4e86-97a8-62cbc67a9c96","year":1993},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.448792Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:7c33f3159e5d0963b5df0f46cb2fc2349ca92bf69887b62e40dd57320f6ff77a","observation_id":"09852294-be26-4bf7-a17f-cf66795d401f","resolution":{"observed_at":"2026-08-12T14:58:40.073692Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:39.963925Z","title":"Ranking and defuzzification methods based on area compensation,","venue":null,"work_id":"32bce316-f6a5-4b1c-b8f3-26847e549d28","year":1996},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.453228Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:be317a865868db25163735eb80ed86ba04bda5bf974069f4af569e500a91327a","observation_id":"2a15938d-d1fe-4fb4-8806-67074dba0214","resolution":{"observed_at":"2026-08-12T14:58:40.025372Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:39.953041Z","title":"Defuzzification: criteria and classification,","venue":null,"work_id":"54040900-5e23-487f-bea7-ca45bf5ac2c4","year":1999},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.458267Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:9c5fb4187ec6d053d9afd3871ced8941bb8da23e363fbb95d7f63e4a9a0d7bdb","observation_id":"bc855518-3b34-4edb-9cf7-1089f8a4150b","resolution":{"observed_at":"2026-08-12T14:58:39.955847Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:39.811181Z","title":"Defuzzification within a multicriteria decision model,","venue":null,"work_id":"9df7a179-0220-4ec9-a5f1-247e978cacc1","year":2003},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.542743Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:e0bb9b592ede61b8dc8fea17fe88e80173461c0a6c46abfefc41b2cda08f7cf8","observation_id":"ca4c34e9-7b22-403e-89cf-951ec4b0ac4e","resolution":{"observed_at":"2026-08-12T14:58:39.906614Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:39.799984Z","title":"An approach to human reliability in man-machine systems using error possibility,","venue":null,"work_id":"b5a4b676-67fb-4cad-b97a-661823c5d130","year":1988},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.562502Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:4a74c6613c6dc8fb2f5c17178d24897aa5052b7c634e4f57af49240d5eb0d269","observation_id":"302e8aeb-bb38-42b5-84e7-dbd7f0084fb0","resolution":{"observed_at":"2026-08-12T14:58:39.804393Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:39.695892Z","title":"A novel risk analysis approach for fpso single point mooring system using bayesian network and interval type-2 fuzzy sets,","venue":null,"work_id":"ed8eb19f-3947-4eee-9e5d-255a4e53f927","year":2022},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.567387Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:e9531200b6193644aa993d21fbc0bdefdbea45688689cec9205c2a1e3c62e917","observation_id":"d58f2344-1870-499f-8a72-7ca178aced93","resolution":{"observed_at":"2026-08-12T14:58:39.786843Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T14:58:39.599590Z","title":null,"venue":null,"work_id":"2a8747af-af15-4d31-8475-3d42cabfe7f9","year":2009},"citing_paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-12T14:58:39.571186Z"},"links":{"citing_paper":"/paper/2411.15249"},"observation_digest":"sha256:a3f29409c81443a061c47c4ba71cd066a4641f42ca41bd5818de79cc642719f5","observation_id":"3dea763f-a20a-4d78-84de-fe632e57158b","resolution":{"observed_at":"2026-08-12T14:58:39.686735Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2411.15249","last_updated":"2024-11-22T08:23:56Z","latest_version":1,"primary_category":"stat.AP","snapshot_observed_at":"2026-08-12T14:51:17.773573Z","submitted_at":"2024-11-22T08:23:56Z","title":"Interval-Valued Fuzzy Fault Tree Analysis through Qualitative Data Processing and its Applications in Marine Operations"},"reference_resolution":{"displayed":42,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":2,"verified_exact":0,"verified_fuzzy":40},"total_outbound_references":42},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"thesis":"As of 13 August 2026, this Paper Citation Record lists 42 of 42 outbound references and 0 inbound Pith citation observations for arXiv:2411.15249."}