{"as_of":"2026-08-13T17:02:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:f60dff77187f7af88723fd8304420a12e655a081bbdd990d72f525eabcb79d4a","coverage":[{"denominator":26,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":26,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-12T13:41:29.044206Z","state":"measured"},{"denominator":26,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":26,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-13T06:32:02.005865+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2411.16019/citation-record","integrity":"/paper/2411.16019/integrity","json":"/paper/2411.16019/citation-record.json","paper":"/paper/2411.16019"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.626146Z","title":"Autockt: Deep reinforcement learning of analog circuit designs,","venue":null,"work_id":"23e87fcf-a849-44ce-b505-b02838411351","year":2020},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.861170Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:643c8489cbe5a70ae2b201432b84ff7b9fce5c228322f00abdd9ed5285ae7bb8","observation_id":"b5df57c9-516f-42f2-aa2d-532880198552","resolution":{"observed_at":"2026-08-12T13:41:29.630771Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.613379Z","title":"Gcn-rl circuit designer: Transferable transis- tor sizing with graph neural networks and reinforcement learning,","venue":null,"work_id":"21a1f622-7b2f-4155-a308-1c38bdccf42a","year":2020},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.866518Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:48a8948f77ebdbf9c754580a18784406e3edd2285c645242552f2460006000a4","observation_id":"791111d2-497f-439e-bd4b-ef06fdea8aa1","resolution":{"observed_at":"2026-08-12T13:41:29.616961Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.599261Z","title":"Rose: Robust analog circuit parameter optimization with sampling-efficient re- inforcement learning,","venue":null,"work_id":"2224f0a8-5386-4ca4-8b5e-661d4e96f746","year":2023},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.872271Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:345895d7ceb1ef2cb915cc6c1110bacd63c8d8fa226137f003b8b7641d280247","observation_id":"5b91462f-e140-4ccb-805d-da3db74942b4","resolution":{"observed_at":"2026-08-12T13:41:29.603740Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.585397Z","title":"Automated design of complex analog circuits with mul- tiagent based reinforcement learning,","venue":null,"work_id":"321a1e2c-f79e-4101-bce4-0bbaa19b1681","year":2023},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.878057Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:645221eca0288300b36675454b3a00614bd28a4108f84f6033aad7472dda875a","observation_id":"c6842913-ff5b-47e5-81da-6a108a711043","resolution":{"observed_at":"2026-08-12T13:41:29.590253Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2312.00752","last_updated":"2024-05-31T17:55:27Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2023-12-01T18:01:34Z","title":"Mamba: Linear-Time Sequence Modeling with Selective State Spaces","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2312.00752","snapshot_observed_at":"2026-08-12T13:41:28.883440Z","title":"Mamba: Linear-time sequence modeling with selective state spaces,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.883440Z"},"links":{"cited_paper":"/paper/2312.00752","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:b115e2387eb77f45ea36e829fabe7bde3dafdfc26f26a20eeb31e39c312d5fcc","observation_id":"26c7f0b7-c24f-469a-a06f-e9be79d2b7ad","resolution":{"observed_at":"2026-08-12T13:41:28.883440Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2405.21060","last_updated":"2024-05-31T17:50:01Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2024-05-31T17:50:01Z","title":"Transformers are SSMs: Generalized Models and Efficient Algorithms Through Structured State Space Duality","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2405.21060","snapshot_observed_at":"2026-08-12T13:41:28.893250Z","title":"Transformers are ssms: Generalized models and efficient algorithms through structured state space duality,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.893250Z"},"links":{"cited_paper":"/paper/2405.21060","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:6ef6d0004720d5083c0aac52cabc4fbad08895d870f97f9e8609da893eae335c","observation_id":"3c77976a-e993-4e3d-9553-fa13b3e17fea","resolution":{"observed_at":"2026-08-12T13:41:28.893250Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.566414Z","title":"Meta-world: A benchmark and evaluation for multi-task and meta reinforcement learning,","venue":null,"work_id":"85a86a29-b13b-465b-b04c-bcfa0a6c1064","year":2020},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.898313Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:49c5cd7a1b0da03f38bf5a3cb1b4742984215f1bd6c5355fa74b84ca2da09583","observation_id":"3b0e3d9f-5e9b-44ca-a19c-46b6f148a5c4","resolution":{"observed_at":"2026-08-12T13:41:29.576797Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.553557Z","title":"On effective scheduling of model-based reinforcement learning,","venue":null,"work_id":"e7fadd4c-da24-48bf-a3c6-9146fcdd9325","year":2021},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.905187Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:e03b3af7b9905c948154195e61522110c05aa47b325659f9c44a024a8c036ead","observation_id":"b597b552-0ea4-44a6-a484-58fa2b8f5e72","resolution":{"observed_at":"2026-08-12T13:41:29.558282Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2403.19887","last_updated":"2024-07-03T14:30:33Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2024-03-28T23:55:06Z","title":"Jamba: A Hybrid Transformer-Mamba Language Model","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2403.19887","snapshot_observed_at":"2026-08-12T13:41:28.914795Z","title":"Jamba: A hybrid transformer-mamba language model,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.914795Z"},"links":{"cited_paper":"/paper/2403.19887","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:74706c0dacc0ec274906baf1378f6e83f2f39e70b00598cebbcf45d3180a4835","observation_id":"362d3e71-ca9e-42a9-a4b9-cd307ff56ddb","resolution":{"observed_at":"2026-08-12T13:41:28.914795Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2307.09288","last_updated":"2023-07-19T17:08:59Z","snapshot_observed_at":"2026-08-07T12:56:43.323460Z","submitted_at":"2023-07-18T14:31:57Z","title":"Llama 2: Open Foundation and Fine-Tuned Chat Models","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2307.09288","snapshot_observed_at":"2026-08-12T13:41:28.932932Z","title":"Llama 2: Open foundation and fine-tuned chat models,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.932932Z"},"links":{"cited_paper":"/paper/2307.09288","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:b91ed95630ddf156a1c5e310b5981d888335e30aa8f71517f49fb536bfc518cf","observation_id":"eec696e2-ced0-44e8-955a-259ad237c1e5","resolution":{"observed_at":"2026-08-12T13:41:28.932932Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:28.940321Z","title":"In- tegrating mamba and transformer for long-short range time series forecasting,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.940321Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:8069a1dd0c0bdae6e0da0d9ed67ffb185eb6991ccc146ae76ae699c7ecedd516","observation_id":"11a76139-ed00-4dc1-94c0-9c947734eb8b","resolution":{"observed_at":"2026-08-12T13:41:28.940321Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2401.09417","last_updated":"2024-11-14T02:00:33Z","snapshot_observed_at":"2026-07-06T17:16:59.193820Z","submitted_at":"2024-01-17T18:56:18Z","title":"Vision Mamba: Efficient Visual Representation Learning with Bidirectional State Space Model","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2401.09417","snapshot_observed_at":"2026-08-12T13:41:28.947536Z","title":"Vision mamba: Efficient visual representa- tion learning with bidirectional state space model,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.947536Z"},"links":{"cited_paper":"/paper/2401.09417","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:5a697f7a382870af98ddb2c35f0240d7100df162a2d8bb3d83d4f81cbaf6831a","observation_id":"2a1588dd-96ed-47a3-b419-8e64966b9125","resolution":{"observed_at":"2026-08-12T13:41:28.947536Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2408.01129","last_updated":"2026-04-06T02:10:55Z","snapshot_observed_at":"2026-08-11T00:37:21.988846Z","submitted_at":"2024-08-02T09:18:41Z","title":"A Survey of Mamba","version":8},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2408.01129","snapshot_observed_at":"2026-08-12T13:41:28.954852Z","title":"A survey of mamba,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.954852Z"},"links":{"cited_paper":"/paper/2408.01129","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:9f606de5024b22147e6369a9a76769d206092b74dac67f52b4648d116a4e8617","observation_id":"d13abecd-c545-4e43-933b-6fe5c1679e91","resolution":{"observed_at":"2026-08-12T13:41:28.954852Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"1707.06347","last_updated":"2017-08-28T09:20:06Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2017-07-20T02:32:33Z","title":"Proximal Policy Optimization Algorithms","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1707.06347","snapshot_observed_at":"2026-08-12T13:41:28.963004Z","title":"Proximal policy optimization algorithms,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.963004Z"},"links":{"cited_paper":"/paper/1707.06347","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:55895b46c33e4dc8adc0ab9ad6d09096e698b18a2924f0925a6efd07c088171b","observation_id":"7ef9c991-517b-49cf-b1e8-9ca04071a294","resolution":{"observed_at":"2026-08-12T13:41:28.963004Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.518927Z","title":"Soft actor-critic: Off-policy maximum entropy deep reinforce- ment learning with a stochastic actor,","venue":null,"work_id":"bdb7b38e-0749-4fff-9311-9d6697addc58","year":2018},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.975709Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:3dc4d31ba3a674d40389a2137902eb80a9a213f9c49098b789e794dcc3075362","observation_id":"f6ec9ea7-179b-44ec-8a4a-0013bb06331f","resolution":{"observed_at":"2026-08-12T13:41:29.525888Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.499443Z","title":"When to trust your model: Model-based policy optimization,","venue":null,"work_id":"4ec1e1e7-06a5-4be1-ad2d-453775dbaa5a","year":2019},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.980882Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:e48826ca0c24a0ef0d8343fc3e2ccc3fe8714cf2414d79c4fb0ae30a893ebdcf","observation_id":"fa04a522-f315-43d7-8f45-c8f791fd7b0d","resolution":{"observed_at":"2026-08-12T13:41:29.506068Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.484965Z","title":"Bidirectional model-based policy optimization,","venue":null,"work_id":"3b153894-a44f-4444-b07d-24d9e56711a6","year":2020},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.985459Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:1c35bc5f24964da0acaa3e0516f2e2574656d67a15370e6cf4c7109166345dcb","observation_id":"fd2ac711-df0d-4f27-b8cf-554df9443102","resolution":{"observed_at":"2026-08-12T13:41:29.489306Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.538818Z","title":"Trust the model when it is confident: Masked model-based actor-critic,","venue":null,"work_id":"2a99e98d-4f3c-4861-9708-1e1d850521e4","year":2020},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.989483Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:69a3f062d0dd86299187e84d4472e0e81f4375847e295f06f05c088fcd346e3b","observation_id":"5fba459f-61a3-4753-b510-fb5105df3d52","resolution":{"observed_at":"2026-08-12T13:41:29.543138Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.464661Z","title":"Pvtsizing: A turbo-rl-based batch-sampling optimization framework for pvt-robust analog circuit synthesis,","venue":null,"work_id":"c2c81538-9c12-45fb-ae42-d3831e7b7ee9","year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.994403Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:e59c60ad36d4053272976c3230a1456562c4a2fe228a2a31e86e8ed5c3b6c5bc","observation_id":"a307515a-c68d-4db3-83d2-4ad0203beb2b","resolution":{"observed_at":"2026-08-12T13:41:29.472786Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.440077Z","title":"Parasitic-aware analog circuit sizing with graph neural networks and bayesian optimization,","venue":null,"work_id":"a3c4c895-bed3-40be-bbe0-15b029308b4a","year":2021},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:28.998960Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:12abaa30233dea1e79e40bb8e9ee558e8c4dd814a5435c48a35d606a0de1ebf8","observation_id":"220864bc-d9e6-4831-a036-f2ff4b682793","resolution":{"observed_at":"2026-08-12T13:41:29.444994Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.422332Z","title":"Data is all you need: Finetuning llms for chip design via an au- tomated design-data augmentation framework,","venue":null,"work_id":"7677d471-f9c6-40d0-81e1-6fbbc58a042b","year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:29.004479Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:2e18310bbf824f0367ac1bc605539efdd0961eb1410df6599354cd38b585e13c","observation_id":"37fbd73c-13f5-441e-88d0-61b5b8431ee9","resolution":{"observed_at":"2026-08-12T13:41:29.427298Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.402713Z","title":"Cronus: Circuit rapid optimization with neural simulator,","venue":null,"work_id":"dd7ca506-d6e3-4597-a00d-eb82a8c3db31","year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:29.012162Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:0b125fb71a5a9674e7497af06b2ed8aafb67da54a080e4e48666c49f9de1c464","observation_id":"742fe7bb-e0e8-46e4-b645-071dde89908a","resolution":{"observed_at":"2026-08-12T13:41:29.407412Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.386462Z","title":"Using probabilistic model rollouts to boost the sample efficiency of rein- forcement learning for automated analog circuit sizing,","venue":null,"work_id":"25f38c2e-0807-48a0-ada3-fd74f88f251d","year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:29.017109Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:287b3fea92ae654141d73b3ee723752b32cbe0ec0b78589a04e16a81d8629503","observation_id":"53c5ab01-f6f1-425b-b115-05562f983bba","resolution":{"observed_at":"2026-08-12T13:41:29.391634Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2407.07346","last_updated":"2024-08-06T18:14:17Z","snapshot_observed_at":"2026-08-12T23:25:21.917834Z","submitted_at":"2024-07-10T03:52:53Z","title":"INSIGHT: Universal Neural Simulator for Analog Circuits Harnessing Autoregressive Transformers","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2407.07346","snapshot_observed_at":"2026-08-12T13:41:29.026527Z","title":"Insight: Universal neural simulator for ana- log circuits harnessing autoregressive transformers,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:29.026527Z"},"links":{"cited_paper":"/paper/2407.07346","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:ef037ad1a8bc1fcb83c684d86322a917449c3ac5dac840cf0073704a38cfeb41","observation_id":"4a4a7b90-3ead-49de-82db-b930e6de6876","resolution":{"observed_at":"2026-08-12T13:41:29.026527Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"1412.6980","last_updated":"2017-01-30T01:27:54Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2014-12-22T13:54:29Z","title":"Adam: A Method for Stochastic Optimization","version":9},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1412.6980","snapshot_observed_at":"2026-08-12T13:41:29.034992Z","title":"Adam: A method for stochastic optimization,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:29.034992Z"},"links":{"cited_paper":"/paper/1412.6980","citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:f881577d619438ab2bbd1496e313c9affa33cb9980d2bcec1f10576d8b4c0404","observation_id":"48b0876b-9583-4126-9a9a-3e7370d3fb27","resolution":{"observed_at":"2026-08-12T13:41:29.034992Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T13:41:29.364240Z","title":"Spinning Up in Deep Reinforcement Learn- ing,","venue":null,"work_id":"49dd2376-29ae-4f9c-81e9-ac011596dbeb","year":2018},"citing_paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-12T13:41:29.044206Z"},"links":{"citing_paper":"/paper/2411.16019"},"observation_digest":"sha256:38d00fb3b6d1ac89bd8b49a51fc41279a3aa3dfcc579363f104852e1ce28b3f6","observation_id":"35f53a12-4c4e-4258-98c4-98ce97ce38d8","resolution":{"observed_at":"2026-08-12T13:41:29.373729Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2411.16019","last_updated":"2024-11-25T00:30:49Z","latest_version":1,"primary_category":"cs.LG","snapshot_observed_at":"2026-08-13T09:28:30.028719Z","submitted_at":"2024-11-25T00:30:49Z","title":"M3: Mamba-assisted Multi-Circuit Optimization via MBRL with Effective Scheduling"},"reference_resolution":{"displayed":26,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":10,"verified_exact":0,"verified_fuzzy":16},"total_outbound_references":26},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"thesis":"As of 13 August 2026, this Paper Citation Record lists 26 of 26 outbound references and 0 inbound Pith citation observations for arXiv:2411.16019."}