{"as_of":"2026-08-13T01:38:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:b02d1e3c920e382f4a9de6f2b8d4a401a8e35510e3cec93e48e21ef0f52dbb10","coverage":[{"denominator":33,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":33,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-12T12:17:47.133924Z","state":"measured"},{"denominator":34,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":34,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-12T06:34:41.77262+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-05-22T23:31:38.284177Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"arxiv_reference","source_observed_at":"2026-05-22T23:32:15.522450Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"cited_work":{"arxiv_id":"2411.17463","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2411.17463","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"b7fee32f-e7d0-411c-8858-9404ea19a336","year":2024},"citing_paper":{"arxiv_id":"2503.16139","last_updated":"2026-04-17T09:41:48Z","snapshot_observed_at":"2026-07-06T20:56:00.594770Z","submitted_at":"2025-03-20T13:40:00Z","title":"Ageing-aware Energy Management for Residential Multi-Carrier Energy Systems","version":4},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-05-22T23:31:38.284177Z"},"links":{"cited_paper":"/paper/2411.17463","citing_paper":"/paper/2503.16139"},"observation_digest":"sha256:a4944dac4529d76a6a4cf1a24b3e6b29b23ae5816b57e6154676cf5370ed3b58","observation_id":"e6b9f34d-e63d-41b3-9f8c-28fd3ed96d41","resolution":{"observed_at":"2026-05-22T23:32:15.524810Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2411.17463/citation-record","integrity":"/paper/2411.17463/integrity","json":"/paper/2411.17463/citation-record.json","paper":"/paper/2411.17463"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:46.965778Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:46.965778Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:37ac12059efeb39a731559eeb386086e04407930b1f89eebfb71b5095e93a29f","observation_id":"389caa47-eb05-434c-8d64-650d7907a840","resolution":{"observed_at":"2026-08-12T12:17:46.965778Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2012.71223","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.985250Z","title":null,"venue":null,"work_id":"b5f2e9aa-74f2-4cdf-a4e6-9a1c63be9668","year":2013},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:46.971191Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:c8e5d110a9b97aa0350aba49d31d178280666c2a480333bf7e8cb493074e7b6c","observation_id":"3ba1ee2a-c433-4ed6-ae15-bd76bc58b976","resolution":{"observed_at":"2026-08-12T12:17:48.992932Z","resolver_source":"raw_fallback","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:49.145770Z","title":null,"venue":null,"work_id":"d115d2ed-0c84-44f4-ac43-378c1c1a937b","year":1987},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:46.976432Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:60de1686192eeb5b55007ced3974c72ddf191373c7fad6824929e445165119ca","observation_id":"b973474c-b71a-43af-a93c-553a84412ea9","resolution":{"observed_at":"2026-08-12T12:17:49.150911Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:46.981589Z","title":null,"venue":null,"work_id":null,"year":2002},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:46.981589Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:4f7ed46aace77e513737fc2377a65f8eb8938676d672b2b1d999ec8c92b7b1be","observation_id":"c30031da-0453-4eb3-be3d-10f0aaa20507","resolution":{"observed_at":"2026-08-12T12:17:46.981589Z","resolver_source":null,"status":"malformed_identifier"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"1060.0224","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.880629Z","title":null,"venue":null,"work_id":"c651be9d-e6d0-4ed8-861b-8c64f78dc118","year":2007},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:46.987849Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:8c863a7b4c29a33281008ef8a79a76feaa197a9b9ba7022ec688f56988de15f9","observation_id":"1777bf4e-e5b8-4115-abae-9c5e55c8d44a","resolution":{"observed_at":"2026-08-12T12:17:48.888908Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"1030.0080","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.775560Z","title":null,"venue":null,"work_id":"b4f50ea6-822b-4d4f-a52b-3969df2a6ea2","year":2004},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:46.993197Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:8094f8c8ff7fb2be2650a1cd509509787ba1d7343dd244fbbb6b14054dbd8291","observation_id":"77ff6c23-25b2-4ab3-bad6-c21547b92c3b","resolution":{"observed_at":"2026-08-12T12:17:48.785951Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2018.1761","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.681699Z","title":null,"venue":null,"work_id":"f909a590-cabb-43c4-94a0-80e74446707b","year":2019},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:46.998397Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:3f422cd7cb4cc5c803ad7937e59b829eb2e6cebe1f0488c6a3c8b6c68459d7cb","observation_id":"0e053cdb-2d37-417c-91da-aed4c0cd497a","resolution":{"observed_at":"2026-08-12T12:17:48.689394Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2021.12277","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.581474Z","title":null,"venue":null,"work_id":"7269cc39-d2d2-4609-9242-3d615048f0e3","year":2018},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.003629Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:298583bccdb66691e464e0bd38c648b2430fa5c01163ffe2acb3694c57a4758b","observation_id":"988b61d6-5b16-4821-879a-327382e85482","resolution":{"observed_at":"2026-08-12T12:17:48.589339Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s11081-023-09853-5","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.253490Z","title":null,"venue":null,"work_id":"f0201835-e1de-44c9-a9fa-5a14d120ea19","year":2024},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.008346Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:486b6e2a25c5289415e560602e2ebf56574279e5616800baf0cee334d4bd3b25","observation_id":"dab3e1d6-2439-443d-8912-e7acba23a8f1","resolution":{"observed_at":"2026-08-12T12:17:47.258901Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.012855Z","title":null,"venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.012855Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:cd6905e6770ead6509906141d47867c40c1c57dbcd171168a5b862c09b93490f","observation_id":"0fa2727b-3c15-4cf7-b170-28cf1cccb81c","resolution":{"observed_at":"2026-08-12T12:17:47.012855Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.017600Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.017600Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:f6cf2307e81d874d90cb98ca893e5cfb7dc4342dd6c0119cf6071b1d24029615","observation_id":"87cb53a1-ecc8-4bbe-814f-3d80aa9e88bf","resolution":{"observed_at":"2026-08-12T12:17:47.017600Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.3934/jdg.2016020","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.227438Z","title":null,"venue":null,"work_id":"613ff2f0-0fcd-4460-b3ea-13a289c319c2","year":2016},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.022227Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:ca7a159ce60449d6b7bc0e8e5a335193f4dcfa303902ea191518495ec2f5b1a0","observation_id":"490c2a9e-2ce3-495a-8d57-c1fab1d03f38","resolution":{"observed_at":"2026-08-12T12:17:47.232122Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"1999.6694","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.418014Z","title":null,"venue":null,"work_id":"9af7c7e1-4f7f-47f4-ab7b-61306592e6a7","year":2000},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.026756Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:bded2429ba15ef4a38da5a38c4d38a1c59206ddfcc9c334ae71a079ed7620f2f","observation_id":"b2dc5bbe-fbdc-4a95-bbe0-5b25e172b1a3","resolution":{"observed_at":"2026-08-12T12:17:48.426491Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:49.129269Z","title":null,"venue":null,"work_id":"d2bc86d0-1d89-4467-b896-cb1a6d7f60d0","year":2011},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.031258Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:44350c402270695b9883a1eb43315f6f39f73e025712b7920ef5c4869a832289","observation_id":"72840195-b913-4dce-993d-6c9749742be2","resolution":{"observed_at":"2026-08-12T12:17:49.133918Z","resolver_source":"raw_fallback","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2014.23448","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.321150Z","title":null,"venue":null,"work_id":"33495a26-c964-49fb-b0ed-26f3dd82a5c7","year":2015},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.036725Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:9eb13d2b270d7aa7d5b41daa471d0fbbce7fbbaa74fed286c30050e87efacfb9","observation_id":"322fc5e8-ba43-4e6c-a918-df73d01c9174","resolution":{"observed_at":"2026-08-12T12:17:48.329238Z","resolver_source":"raw_fallback","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:49.113809Z","title":null,"venue":null,"work_id":"407113b0-fa17-4cdf-bb30-e506e053b37b","year":1986},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.042296Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:838481d397cf31dc5b771f40b86515247ac207f9e75ddb2105ae4f6fd8122a8c","observation_id":"43304f98-4a43-4921-b24b-e21e939a5506","resolution":{"observed_at":"2026-08-12T12:17:49.118549Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2007.45383","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.239477Z","title":null,"venue":null,"work_id":"06b2825f-02a8-4da5-8385-bf749d7bb28d","year":2007},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.047805Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:820515bab5e274829af108cd3d79084c01baff14b79c205434fcb2d6742fd637","observation_id":"b22ccd01-57cb-4d2c-9d1c-1b0955c8961c","resolution":{"observed_at":"2026-08-12T12:17:48.246980Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2014.68493","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:48.122470Z","title":null,"venue":null,"work_id":"901f8b04-1215-4f4d-a35d-9d2f54853ca2","year":2014},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.052699Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:9f0b5bb5d14556e2064c5ed892acc9d8787ff805465f6366de7491a6462c2c22","observation_id":"3a505e13-8e78-4472-8479-0391bc71e374","resolution":{"observed_at":"2026-08-12T12:17:48.131679Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:49.095649Z","title":null,"venue":null,"work_id":"e890e63d-d013-4cba-8811-86d6dbc1e403","year":2011},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.058389Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:0793610bb4654c4c2c0d57fdcdab6d6ffd8f15dffc091b35db814aa13a4a9e87","observation_id":"56623736-53fb-4f61-bd49-8b312bbda46c","resolution":{"observed_at":"2026-08-12T12:17:49.101060Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.064465Z","title":"1280-1285)","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.064465Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:76cd5c7f712ca056df229379f22e086c8c76aae2120eb2cbb837304915808537","observation_id":"19683384-23e0-4ca2-80cf-c074a8794119","resolution":{"observed_at":"2026-08-12T12:17:47.064465Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.orl.2015.07.003","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.210067Z","title":null,"venue":null,"work_id":"41365da6-23bd-499f-91a8-259e20bfb67b","year":2015},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.070046Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:508d1bb59be6b2768908d1bd5bea53bcf839d7af843b097e8f7f7af7af7920d5","observation_id":"855abb0d-128c-4ecd-bb78-deef5e777e01","resolution":{"observed_at":"2026-08-12T12:17:47.216313Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.075202Z","title":null,"venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.075202Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:3de9517c6936858e0da7ca67b278efe0ab51dd5ac51ff22dcb5c94041656646d","observation_id":"5070be0e-7fda-47ca-87e2-812a27a02fac","resolution":{"observed_at":"2026-08-12T12:17:47.075202Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2023.10672","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.883339Z","title":null,"venue":null,"work_id":"2e6c5462-e8c7-42d8-9e31-a0d5f67970ce","year":2023},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.080768Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:ee530f585030e9617f32f179965a9bba18367a9439116689e2d6c93396e1c90b","observation_id":"7109690f-470e-4158-900c-af5e0717f885","resolution":{"observed_at":"2026-08-12T12:17:47.891368Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.085994Z","title":null,"venue":null,"work_id":null,"year":2013},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.085994Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:9aed5211d7158ae03160eb2ccef23dcb72553eb30b1af3c2931123c6d80bbe81","observation_id":"67f6dda1-9905-4dd9-a674-bc1688883d4b","resolution":{"observed_at":"2026-08-12T12:17:47.085994Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.090852Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.090852Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:a0fd7f2e23a71cb0ebd82cb0da98dbbf03cf121b4e1f469ac9df295a32eb4f1b","observation_id":"b36019c2-3cb3-48f5-8c69-0736ea3f516c","resolution":{"observed_at":"2026-08-12T12:17:47.090852Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.097158Z","title":"(2023).Monetizing energy storage: A toolkit to assess future cost and value","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.097158Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:9e36d9403148ec062b87734042d6617adfd092f8427792a8a80a125eceb34529","observation_id":"1e91ef30-eaf8-41cf-88c3-a884991def65","resolution":{"observed_at":"2026-08-12T12:17:47.097158Z","resolver_source":null,"status":"malformed_identifier"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2015.1407","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.620545Z","title":null,"venue":null,"work_id":"ad48cf35-9c90-41ce-954c-aae2f03581ac","year":2015},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.102696Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:9435ed6787e7b6064176919d271bcef8673ec71b55fadbda1f78062371e4bbf6","observation_id":"c0d1143f-41ce-4f3c-bf62-4b727ffcf733","resolution":{"observed_at":"2026-08-12T12:17:47.629760Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.108831Z","title":"Zhang, Z","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.108831Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:950faa37d5a7f3391ecbb1232192bb3c40d270cd2d85905bcc27cfb7503597f7","observation_id":"2741033f-8a93-4e3c-bf07-2988943fbad1","resolution":{"observed_at":"2026-08-12T12:17:47.108831Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.113715Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.113715Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:c80e4e41346b940686b4fe182b06adb98025ea8724e4f430647af40962ea5c89","observation_id":"915b5c3e-d91d-4a46-9503-d0800ad96e00","resolution":{"observed_at":"2026-08-12T12:17:47.113715Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.118745Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.118745Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:81652d4a41928795488243a7eb1c8754c3fb89e21cae3662d2be13a88542c8bb","observation_id":"86901398-dcf4-4e7f-b08f-64a732f2a0e8","resolution":{"observed_at":"2026-08-12T12:17:47.118745Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2021.11126","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.389662Z","title":null,"venue":null,"work_id":"d644b9e3-3f76-429f-82ac-2614e9b7e5b5","year":2021},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.123733Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:e375f9645a4e728ee35c9667de666a69fe0a16d8d026724f4b357ea83179ffb8","observation_id":"a1b72703-c607-4f07-8bde-70f3b90591eb","resolution":{"observed_at":"2026-08-12T12:17:47.399232Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:49.078089Z","title":null,"venue":null,"work_id":"37850ffb-3aed-45df-a23a-397f863dd7d3","year":2019},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.129273Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:f230c9031840e390805cf68b2800629ee425dee7c521b00141458e83be8fa513","observation_id":"d7278c6e-e89f-4219-84d6-b3f49d70ec90","resolution":{"observed_at":"2026-08-12T12:17:49.083413Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1029/2011wr010623","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T12:17:47.166800Z","title":null,"venue":null,"work_id":"1eb94a99-fc8e-4b38-93ac-aaa32c45f937","year":2012},"citing_paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems","version":2},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-12T12:17:47.133924Z"},"links":{"citing_paper":"/paper/2411.17463"},"observation_digest":"sha256:527629736313b255a58424b82e5ac7b4a8017615a324bf1c086e8dbd15e2de36","observation_id":"d3b7fa3b-e313-4969-865b-8917d97656e2","resolution":{"observed_at":"2026-08-12T12:17:47.173489Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2411.17463","last_updated":"2025-06-06T12:58:36Z","latest_version":2,"primary_category":"math.OC","snapshot_observed_at":"2026-08-12T12:03:11.635446Z","submitted_at":"2024-11-26T14:28:52Z","title":"How long is long enough? Finite-horizon approximation of energy storage scheduling problems"},"reference_resolution":{"displayed":33,"state_counts":{"malformed_identifier":5,"metadata_mismatch":5,"parse_uncertain":0,"unresolved":14,"verified_exact":9,"verified_fuzzy":0},"total_outbound_references":33},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"thesis":"As of 13 August 2026, this Paper Citation Record lists 33 of 33 outbound references and 1 inbound Pith citation observation for arXiv:2411.17463."}