{"as_of":"2026-08-13T08:54:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:45a165b5f77b452910a40c980e3738141f267de513774ebacb515f5814f6b516","coverage":[{"denominator":32,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":32,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-12T11:34:36.104944Z","state":"measured"},{"denominator":32,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":32,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-13T06:32:02.005865+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2411.18178/citation-record","integrity":"/paper/2411.18178/integrity","json":"/paper/2411.18178/citation-record.json","paper":"/paper/2411.18178"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s40565-019-0527-4","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.302417Z","title":"Journal of Modern Power Systems and Clean Energy 7(5):987--1007, doi:https://doi.org/10.1007/s40565-019-0527-4","venue":null,"work_id":"e6c32dca-c410-4164-911a-0748e4d3cc19","year":2019},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:35.973279Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:d74313cc8f59a59df831153f3f394d11f03fbb5faae8bb10b919f2e1892eef6a","observation_id":"1f87aa14-71dc-47a1-97b2-f1f6c6a9b1cb","resolution":{"observed_at":"2026-08-12T11:34:36.306860Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.egyr.2019.11.048","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.288419Z","title":"Energy Reports 6:101--106, doi:https://doi.org/10.1016/j.egyr.2019.11.048","venue":null,"work_id":"f6f67891-348c-4b53-81df-e3b0917f16dd","year":2020},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:35.978446Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:83f2e7f6c3eb462c4eed6c37d6fda2f2aee8e9fa60ddbb4bfb5f19a5c29cc85d","observation_id":"148e285e-ac3e-4138-ab32-f3f8da2fc610","resolution":{"observed_at":"2026-08-12T11:34:36.293017Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/bf00934096","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.274276Z","title":"Journal of Optimization Theory and Applications 19(2):261--281, doi:https://doi.org/10.1007/bf00934096","venue":null,"work_id":"460bcc78-80bb-4fbf-a9fd-eb0735d6f9f0","year":1976},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:35.983201Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:fef192e2407be99cb0feed8c29c2fe1a5da982c143bd72d8ccf77dab1f2687bd","observation_id":"6a837da1-3e64-4751-9e9a-76fcbb4326f4","resolution":{"observed_at":"2026-08-12T11:34:36.278921Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2015.72325","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:37.224123Z","title":"In: 2015 IEEE Eindhoven PowerTech, IEEE, IEEE, pp 1--6, doi:https://doi.org/10.1109/ptc.2015.7232514","venue":null,"work_id":"6e3d3fd5-afc3-4838-9993-ecdaa697ddb2","year":2015},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:35.987831Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:ccec08568942319be116dd31420edc4c63fec8d7c740e78189a81926b9100319","observation_id":"c8fd181b-4ace-41ae-9be6-6c69f863df35","resolution":{"observed_at":"2026-08-12T11:34:37.230899Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:35.992107Z","title":"In: 2021 IEEE Madrid PowerTech, IEEE, pp 1--6, doi:https://doi.org/10.1109/powertech46648.2021.9494935","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:35.992107Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:fc47eb19d9390da3e0418ab717b493bbd6a694ba4ffcb51b58242b6dedf9013b","observation_id":"2beefe00-2b67-4db6-9c77-d8b8ea51f8cf","resolution":{"observed_at":"2026-08-12T11:34:35.992107Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.18154/rwth-2020-09163","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.259827Z","title":"Dissertation, Rheinisch-Westfälische Technische Hochschule Aachen, doi:https://doi.org/10.18154/RWTH-2020-09163","venue":null,"work_id":"a1d218d9-560a-4c86-8bee-923f60321801","year":2020},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:35.996434Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:2f34ea71a9b5ae6ec2d520e33700892697cc6eb519847cb99d820ab25a910e1d","observation_id":"ce42819a-d676-42b5-922b-bc4a3166b048","resolution":{"observed_at":"2026-08-12T11:34:36.264370Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s10898-016-0476-7","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.246425Z","title":"Journal of Global Optimization 68(2):227--253, doi:https://doi.org/10.1007/s10898-016-0476-7","venue":null,"work_id":"34bd3d40-cc93-4927-b4f1-9d390365f3d1","year":2017},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.001278Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:53996f8987f01622783a4715af2e23e24988ca859d905de2a25b094e1bbb719d","observation_id":"a13014fa-d7a8-4b64-8440-0492fb8ae2b7","resolution":{"observed_at":"2026-08-12T11:34:36.250786Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s10957-021-01813-2","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.232492Z","title":"Journal of Optimization Theory and Applications 188(3):863--881, doi:https://doi.org/10.1007/s10957-021-01813-2","venue":null,"work_id":"44dd15eb-095a-4ec1-b2d1-2833d6ae2262","year":2021},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.006030Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:1e473ec04d475268dd3e40184bd1a8dbfa0b6b1672dc53de86fd2ab2206dde56","observation_id":"fd27dd37-d367-45be-8795-6406e55a5fa2","resolution":{"observed_at":"2026-08-12T11:34:36.237092Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2018.84441","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:37.078631Z","title":"In: 2018 Power Systems Computation Conference (PSCC), IEEE, pp 1--7, doi:https://doi.org/10.23919/pscc.2018.8444136","venue":null,"work_id":"5ff7e978-5145-4253-a406-961f4bcdd3a4","year":2018},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.010368Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:00eb21c1132488c0732e3d2b7b7ccb1927c0ccd23f8c13276940c822eda7098f","observation_id":"72b57761-b97c-47ac-a2bc-f1e337aa23cc","resolution":{"observed_at":"2026-08-12T11:34:37.085523Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s10898-019-00764-3","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.218487Z","title":"Journal of Global Optimization 75(2):341--392, doi:https://doi.org/10.1007/s10898-019-00764-3","venue":null,"work_id":"5a067ab8-68f5-4984-adc0-7b50e80e1712","year":2019},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.014769Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:83a546c4b58587b83a6d11ed79343fd20a364dfedb47d47a04f013f3a648b325","observation_id":"b54a2778-ebc2-4739-93a1-4b22f9193017","resolution":{"observed_at":"2026-08-12T11:34:36.222934Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1002/nav.3800240307","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.203735Z","title":"Naval Research Logistics Quarterly 24(3):441--450, doi:https://doi.org/10.1002/nav.3800240307","venue":null,"work_id":"03195e49-dd97-42c0-a305-79447f81e1c4","year":1977},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.018842Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:82d033d97221759324e7ea249bd946c007120a43b9d9a12457fe587411d7e1e9","observation_id":"a13a1489-7f85-416b-91e3-363a94589f1b","resolution":{"observed_at":"2026-08-12T11:34:36.208817Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.023123Z","title":"In: 2019 IEEE Power & Energy Society General Meeting (PESGM), IEEE, pp 1--5, doi:https://doi.org/10.1109/pesgm40551.2019.8974032","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.023123Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:10f2f55f9e3c0ed80583a76a34296d1f0e811d3b2a6ec829dfd47a4eac074f4d","observation_id":"7aab8115-216a-4ee3-9ca2-289335e764a9","resolution":{"observed_at":"2026-08-12T11:34:36.023123Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/0098-1354(87)87011-4","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.189394Z","title":"Computers & Chemical Engineering 11(6):675--693, doi:https://doi.org/10.1016/0098-1354(87)87011-4","venue":null,"work_id":"27d7a793-93bb-47a9-93aa-082e96937148","year":1987},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.026590Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:e8744a7c109700534781ff3cdb28b6feffebf416659a7b84c0ff20ffd7dca40c","observation_id":"2c876770-40fa-40ae-8651-eef77032f2ba","resolution":{"observed_at":"2026-08-12T11:34:36.193587Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/0098-1354(83)80022-2","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.175941Z","title":"Computers & Chemical Engineering 7(4):439--462, doi:https://doi.org/10.1016/0098-1354(83)80022-2","venue":null,"work_id":"ac9809c6-20d7-43ec-a4ca-51d1d61bd58e","year":1983},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.030581Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:5806874a1232747354779fa0d9ca44f406a3f193a506acab41cedc1cead122e8","observation_id":"f016583f-1779-47c1-be02-ad970821aa08","resolution":{"observed_at":"2026-08-12T11:34:36.180302Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.034103Z","title":"OECD, doi:https://doi.org/10.1787/9789264111394-en, ://www.oecd-ilibrary.org/content/publication/9789264111394-en","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.034103Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:be24cfa3dab2f92138f228f365e34fd6a7863e754018c04956c385dd880a7793","observation_id":"6fc87fd0-45d0-4d12-9c3d-86880554625e","resolution":{"observed_at":"2026-08-12T11:34:36.034103Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.038061Z","title":"IEEE Transactions on Power Systems 36(6):4953--4966, doi:https://doi.org/10.1109/tpwrs.2021.3075925","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.038061Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:314fc2cf174177eedb2e92892d7f7b4a9a88f02feb372e3ee66f280c9807b515","observation_id":"59ac7bbf-3cf3-41fe-a0bb-fd5dde49e279","resolution":{"observed_at":"2026-08-12T11:34:36.038061Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2012.22124","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.781075Z","title":"In: 2013 IEEE power & energy society general meeting, IEEE, pp 1--11, doi:https://doi.org/10.1109/tste.2012.2212471","venue":null,"work_id":"72d3464d-3ae4-4e56-b5f8-8bd6e5c88331","year":2013},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.042087Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:f41b5ab7445ac8de63cb43d211cdf93a3a92cee0440fb37bb18b11c631ac0fbb","observation_id":"69c97c42-3fab-432f-97bf-1362edd02b54","resolution":{"observed_at":"2026-08-12T11:34:36.788078Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2011.60396","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.711514Z","title":"In: 2011 IEEE power and energy society general meeting, IEEE, pp 1--8, doi:https://doi.org/10.1109/pes.2011.6039617","venue":null,"work_id":"ed4e6638-43e7-4924-9ea2-7cf0ddc589a2","year":2011},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.046276Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:3fd76f2598669a0d247233f44002f52a7c775b70169e2c5b373b98379a1eb937","observation_id":"193c2691-5b0c-428a-bba6-b565c8214d05","resolution":{"observed_at":"2026-08-12T11:34:36.719519Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.050133Z","title":"Optimization 60(10-11):1291--1308, doi:https://doi.org/10.1080/02331934.2010.527970","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.050133Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:50f3062f90b8421cca57e94a718ba3d2c363d132f60007e44b1deb39736cd24f","observation_id":"1238b051-9983-4102-b25b-068a087233d6","resolution":{"observed_at":"2026-08-12T11:34:36.050133Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s10898-014-0146-6","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.162652Z","title":"Journal of Global Optimization 61(1):1--17, doi:https://doi.org/10.1007/s10898-014-0146-6","venue":null,"work_id":"38ecd2dd-a269-4886-a305-31c8fbb0062d","year":2015},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.054875Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:af11262b0133a5f4f55ee4fb015da0715a84d38febeb6ae5219fd3638ecc102b","observation_id":"a9359435-6c48-4179-ac24-88b1186c41f8","resolution":{"observed_at":"2026-08-12T11:34:36.166905Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2015.24107","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.572603Z","title":"IEEE Transactions on Sustainable Energy 6(3):800--809, doi:https://doi.org/10.1109/tste.2015.2410760","venue":null,"work_id":"1a1f9b98-ca3c-4796-90a6-af83a7db4a09","year":2015},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":21,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.059237Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:9fdd6d27b7e10e53b807a6094e2c3639a1c4a7285ddc4fed2a3f70916a80b70f","observation_id":"0c7f8fd0-d819-410a-94d9-68b6667f2da5","resolution":{"observed_at":"2026-08-12T11:34:36.579431Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/s0377-2217(99)00132-0","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.149369Z","title":"European Journal of Operational Research 119(2):301--313, doi:https://doi.org/10.1016/s0377-2217(99)00132-0","venue":null,"work_id":"3aae9662-a00c-4601-b41f-ff42d2fe6260","year":1999},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":22,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.063367Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:9da38a763b27ce9fd69a94e4a86e2c0644de843d4801e4a06aac432f007453f1","observation_id":"b411441f-299f-42dd-9541-47485aa29248","resolution":{"observed_at":"2026-08-12T11:34:36.153546Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1002/etep.617","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.134532Z","title":"European Transactions on Electrical Power 22(6):846--865, doi:https://doi.org/10.1002/etep.617","venue":null,"work_id":"51fb8af1-814a-46ea-ab12-2506fe8a3e56","year":2012},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":23,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.067383Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:1bbfa397ead2f3621534d282dbb59bf6d4d16c357a94f7edec6af20e084d7a1a","observation_id":"aa70f99e-38ac-49a1-9dc4-70e7574931a5","resolution":{"observed_at":"2026-08-12T11:34:36.140143Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2022.10796","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.496744Z","title":"Computers & Chemical Engineering 166:107969, doi:https://doi.org/10.1016/j.compchemeng.2022.107969","venue":null,"work_id":"f758704e-687d-40d1-a8a1-b4513b239c23","year":2022},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":24,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.071423Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:172471346c20b573ba3ca70b7df959c86d8768c36f622353ef551ff83fa9cbb1","observation_id":"66efcc42-0198-45c5-a0ab-424426a06d3f","resolution":{"observed_at":"2026-08-12T11:34:36.503852Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2015.23900","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.410027Z","title":"IEEE Transactions on Power Systems 31(1):339--347, doi:https://doi.org/10.1109/TPWRS.2015.2390038","venue":null,"work_id":"f4e31105-f7e7-4181-bd22-c2b0de6eef66","year":2015},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":25,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.075452Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:77c5ea426e5e9d4a5cda9892ae49a048e43f31f9b993b987340bab25cfd6db4b","observation_id":"cf198588-cad4-4a79-af2b-81cfd1560cee","resolution":{"observed_at":"2026-08-12T11:34:36.417327Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:37.297231Z","title":"://publications.rwth-aachen.de/record/828516","venue":null,"work_id":"853b02ff-629d-437d-b479-c25b85785760","year":2021},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":26,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.079397Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:5c732a4fe6fe5e8924bd50527838f6eb5ed6c046e001799ac8717578dc5924e0","observation_id":"0f35296a-44f7-4957-8b77-a159d068adb3","resolution":{"observed_at":"2026-08-12T11:34:37.301931Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.083095Z","title":", \" * write output.state after.block = add.period write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":27,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.083095Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:79b47e7eee7760e39bff22f3f5ba8722b9deb9d33842eb984387e2df5384c8f9","observation_id":"5160d4d7-e8f1-49ec-97f0-4d56505d400b","resolution":{"observed_at":"2026-08-12T11:34:36.083095Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:37.275285Z","title":"write newline","venue":null,"work_id":"b2ed78ca-6e51-4c3c-954b-a195d6aebf13","year":null},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":28,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.087669Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:68e1918977b12c06510f2abdda787d51114637a161d3339dd6189e101423c04a","observation_id":"fc8ec01c-8956-474f-88e0-d1ff673727f2","resolution":{"observed_at":"2026-08-12T11:34:37.279605Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.092101Z","title":", \" * write output.state after.block = add.period write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":29,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.092101Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:890664867c8ac011d40892a2a25067ecac79d3e06b07dea06d8c2eaf347b459d","observation_id":"00e038ac-165a-4951-b0e9-c75668a2aec0","resolution":{"observed_at":"2026-08-12T11:34:36.092101Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.096240Z","title":"write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":30,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.096240Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:c6262a89fd46927b9b0544c9827d02f3bf0275db94cf4e9c3107fa124f763d69","observation_id":"5890591a-5317-4143-ba83-92528f552c05","resolution":{"observed_at":"2026-08-12T11:34:36.096240Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.100539Z","title":", \" * write output.state after.block = add.period write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":31,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.100539Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:b9f8a32b96c97370543feeffafa54e16e84606fc870d01361494c84a01db3d62","observation_id":"32c6000e-68a0-479f-a5c3-575bc9914eb0","resolution":{"observed_at":"2026-08-12T11:34:36.100539Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-12T11:34:36.104944Z","title":"write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties","version":3},"reference_index":32,"source":"arxiv_source","source_observed_at":"2026-08-12T11:34:36.104944Z"},"links":{"citing_paper":"/paper/2411.18178"},"observation_digest":"sha256:a15df5ee27b87c7a8f9fb0acf73431488d98222716e6651b7263ebd65753d332","observation_id":"a9b0600a-d7a4-45ca-8cbe-0d14162a2309","resolution":{"observed_at":"2026-08-12T11:34:36.104944Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2411.18178","last_updated":"2025-01-24T14:45:57Z","latest_version":3,"primary_category":"math.OC","snapshot_observed_at":"2026-08-12T11:24:04.768814Z","submitted_at":"2024-11-27T09:54:50Z","title":"Optimizing Flexibility in Power Systems by Maximizing the Region of Manageable Uncertainties"},"reference_resolution":{"displayed":32,"state_counts":{"malformed_identifier":0,"metadata_mismatch":7,"parse_uncertain":0,"unresolved":10,"verified_exact":13,"verified_fuzzy":2},"total_outbound_references":32},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"thesis":"As of 13 August 2026, this Paper Citation Record lists 32 of 32 outbound references and 0 inbound Pith citation observations for arXiv:2411.18178."}