{"as_of":"2026-08-13T08:54:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:0c1dafb1f3bf796f4c95d0d49864e84839828dd269d32c401dcda4fa3a216642","coverage":[{"denominator":18,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":18,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-11T23:57:33.628280Z","state":"measured"},{"denominator":18,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":18,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-13T06:32:02.005865+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2412.02041/citation-record","integrity":"/paper/2412.02041/integrity","json":"/paper/2412.02041/citation-record.json","paper":"/paper/2412.02041"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.901008Z","title":"Managing project scope creep in construction industry,","venue":null,"work_id":"2c3df66c-b36a-4963-9de1-e71a3695b513","year":2022},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.553773Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:8ed10421a65ddea778e43a5eed8c1e0fe6113417f12b8e5a62cf483c02c68087","observation_id":"8968bafe-1203-4554-8dab-0e2407e5377b","resolution":{"observed_at":"2026-08-11T23:57:33.905221Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.888216Z","title":"Identifying stakeholders’ involvement that enhances project scope definition completeness in Saudi Arabian public building projects,","venue":null,"work_id":"b86e6a4d-8e2e-4d59-acac-8107260ea8d4","year":2016},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.558239Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:ed0737286f8c52433d3ecf95eab9778cc0ad0a828397a58529b9c4d245f501a4","observation_id":"e9113899-33e4-4542-b6d6-cfdc873208fd","resolution":{"observed_at":"2026-08-11T23:57:33.892592Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.874757Z","title":"Synthetic structure of industrial plastics (Book style with paper title and editor),","venue":null,"work_id":"0587fa71-b2f8-43d6-9be7-13b4d1fe9697","year":1964},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.562144Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:3b3ba2e3227f9d0d293398d37719345c987372bd72ef56973551cb68afe1db6f","observation_id":"23642c1f-05e6-47a5-b553-e3e36ad90375","resolution":{"observed_at":"2026-08-11T23:57:33.879532Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.861254Z","title":"Agile project management challenge in handling scope and change: A systematic literature review,","venue":null,"work_id":"2b54f5e1-4170-4e0f-9619-7f33c8c25285","year":2022},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.566481Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:dd440b713a180ad797529be4c7d686ba92f6dc0bfb72bced7b6df5c85734a627","observation_id":"1f8e3577-aa83-4ac9-a99b-b5e2ea082462","resolution":{"observed_at":"2026-08-11T23:57:33.865867Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.847216Z","title":"Application of KDD techniques to extract useful knowledge from labor resources data in industrial construction projects,","venue":null,"work_id":"bf9fb138-53f4-4cc2-bdc2-ee5f9a1d7e58","year":2014},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.571132Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:895812ae4291d63e93e74df03c691654b1b6319a3eb0d3a5bdf5fcad0987395a","observation_id":"5fb80ee3-9706-4887-abc8-33c50b0db1d7","resolution":{"observed_at":"2026-08-11T23:57:33.852071Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.833658Z","title":"Application of machine learning in project management,","venue":null,"work_id":"56a223b2-aee1-4317-9dff-f0b2253cb554","year":2021},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.575637Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:38c41a2864b93452cd01abb5815ddf4a5ae19f315a5f3deef372090fe2fc7396","observation_id":"8200fa8b-d348-4e73-8d4a-f45c5e68d747","resolution":{"observed_at":"2026-08-11T23:57:33.838351Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.819854Z","title":"Budget allocation problem for projects with considering risks, robustness, resiliency, and sustainability requirements,","venue":null,"work_id":"2c88a2d6-5363-43e8-97e3-7ff4e168833e","year":2024},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.580373Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:e7a5739c6c99b09583573763e9eefecf37ebbfdc23a2a55382b446131b379c08","observation_id":"8a53d8c9-769d-4320-958f-1f20100ffded","resolution":{"observed_at":"2026-08-11T23:57:33.824673Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2411.17914","last_updated":"2024-11-26T22:09:55Z","snapshot_observed_at":"2026-08-12T11:40:17.065348Z","submitted_at":"2024-11-26T22:09:55Z","title":"Enhancing Project Performance Forecasting using Machine Learning Techniques","version":1},"cited_work":{"arxiv_id":"2411.17914","doi":null,"metadata_source":"pith","pith_arxiv_id":"2411.17914","snapshot_observed_at":"2026-08-11T23:57:33.662073Z","title":"Enhancing Project Performance Forecasting using Machine Learning Techniques","venue":"cs.LG","work_id":"cc15549f-7158-404d-985f-afe1d0d2d557","year":2024},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.584531Z"},"links":{"cited_paper":"/paper/2411.17914","citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:46dfcb343d7e83796fe59b3c0317d61084777948672e2060617c126498c8730e","observation_id":"508b03ac-23c7-447c-8e6f-88cb7008487a","resolution":{"observed_at":"2026-08-11T23:57:33.669207Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.805823Z","title":"Reinventing construction: A route of higher productivity,","venue":null,"work_id":"85105405-5845-4ee7-afe2-7762834da6aa","year":2017},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.589206Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:835e33a2dda4fe10d59c3bf335ca047188857bb6db82b9fb30c226295ce6f0d0","observation_id":"9f1500a8-3971-40cd-be2d-0e754e6e1b22","resolution":{"observed_at":"2026-08-11T23:57:33.810305Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.791971Z","title":"Interactions of building information modeling, lean and sustainability on the architectural, engineering and construction industry: a systematic review,","venue":null,"work_id":"6f4c8597-57be-4198-bb87-340bc3d60b59","year":2018},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.593552Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:ecffa1c5a25aa8e71317002fb2f1c6b249a5a51e2bf781eb0db6c0b153eb4189","observation_id":"02c3b8e1-81a6-4529-a3e1-0b203ee31584","resolution":{"observed_at":"2026-08-11T23:57:33.796825Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.778600Z","title":"How AI will transform project management,","venue":null,"work_id":"d9d0b8fa-1028-49b2-804e-1c95c8a7977a","year":2023},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.597892Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:70d817aefc71c610726a5b4629f7ec40b02cbaf69648aef27008ea37660094c4","observation_id":"c043ddfb-6968-4583-9cb0-cefe8c465400","resolution":{"observed_at":"2026-08-11T23:57:33.783156Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.764810Z","title":"Investigating antecedents and drivers affecting the adoption of collaboration technologies in the construction industry,","venue":null,"work_id":"ad032c02-f158-44cf-8c59-3aaee84a02cb","year":2007},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.602307Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:75ed708ac9d898732110c394249e5818acef97d727fa0d64b7cfa7ccc768831a","observation_id":"c5c53575-3da2-4d76-82c4-0638ba72742f","resolution":{"observed_at":"2026-08-11T23:57:33.769289Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.751669Z","title":"Cloud computing in construction industry: Use cases, benefits and challenges,","venue":null,"work_id":"372c6685-83b8-4d12-8559-46027275d9c2","year":2021},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.606999Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:03c17b531f0385f09dae442c5641866fb1c2a891ec44760f238bc93309197362","observation_id":"5c2adbc9-de8f-409f-8915-b71f16e115c0","resolution":{"observed_at":"2026-08-11T23:57:33.755837Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.736530Z","title":"Digital Twins for the built environment: learning from conceptual and process models in manufacturing,","venue":null,"work_id":"aec3fc1f-9af1-4a02-a03b-742a4c569aa7","year":2021},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.611142Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:4c9eb2a9a57e6c2c290b7019632bda3095cbae3cda6eb4c97855e82ec5b0a4bd","observation_id":"c0bf02fa-71f6-41bb-968b-bc049109e5f3","resolution":{"observed_at":"2026-08-11T23:57:33.741578Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.722781Z","title":"A study of preproject planning and project success using ANNs and regression models,","venue":null,"work_id":"0ecbe25a-bbda-4d98-a17c-37d5c43fa60b","year":2010},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.615552Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:1dcf94779cf3a1e20291ac874780b5122697f5eccd3e816524b5346a6f75ae61","observation_id":"53686624-afce-4fa9-a91d-187a699b1b2a","resolution":{"observed_at":"2026-08-11T23:57:33.727497Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.708686Z","title":"Employee Well -being in the Age of AI: Perceptions, Concerns, Behaviors, and Outcomes,","venue":null,"work_id":"ae8b67c9-4820-4ad5-8ae6-2bf49620159e","year":2024},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.619909Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:b93dd545c324534abf0554f5655563a124ac3801584043077bef9f8bdf8efdef","observation_id":"494c0959-62fb-4302-825c-384ddede6113","resolution":{"observed_at":"2026-08-11T23:57:33.713310Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.693844Z","title":null,"venue":null,"work_id":"cba4eaae-18fa-402e-9470-71cceb3cada0","year":2018},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.624133Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:a3884a27c7d948443cc38eb843a97a7bf1190c1e7b499066f08629fa4a53d826","observation_id":"c3f95d2e-9da6-4ec0-8985-43761da9a616","resolution":{"observed_at":"2026-08-11T23:57:33.698282Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T23:57:33.679354Z","title":"Developing a dataset of real projects for portfolio, program and project control management research,","venue":null,"work_id":"8805b49c-e400-4436-a994-0eaa7e591aa4","year":2021},"citing_paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-11T23:57:33.628280Z"},"links":{"citing_paper":"/paper/2412.02041"},"observation_digest":"sha256:e6c2e2f28a6807e2e58edc57ca20830534e1ae5ad2615fb10aa59bcadd9a174b","observation_id":"0522b8c8-b43f-422d-b08b-092fadc8f981","resolution":{"observed_at":"2026-08-11T23:57:33.684201Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2412.02041","last_updated":"2024-12-02T23:54:00Z","latest_version":1,"primary_category":"cs.LG","snapshot_observed_at":"2026-08-13T04:51:36.359029Z","submitted_at":"2024-12-02T23:54:00Z","title":"Predicting the Impact of Scope Changes on Project Cost and Schedule Using Machine Learning Techniques"},"reference_resolution":{"displayed":18,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":1,"verified_exact":1,"verified_fuzzy":16},"total_outbound_references":18},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"thesis":"As of 13 August 2026, this Paper Citation Record lists 18 of 18 outbound references and 0 inbound Pith citation observations for arXiv:2412.02041."}