{"as_of":"2026-08-14T01:55:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:22b377622cc05dbd7c565c91631244941efe818aca5c732efa85228547a70ecb","coverage":[{"denominator":35,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":35,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-11T12:36:45.189116Z","state":"measured"},{"denominator":35,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":35,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-13T06:32:02.005865+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2412.14052/citation-record","integrity":"/paper/2412.14052/integrity","json":"/paper/2412.14052/citation-record.json","paper":"/paper/2412.14052"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.055710Z","title":", \" * write output.state after.block = add.period write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.055710Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:2c5bf7719ab6496eb783b39b711232e78b77c2f6e35fdc997f572e0cb2ccd7d0","observation_id":"48b191d0-6334-4071-a4ec-90bc8064f861","resolution":{"observed_at":"2026-08-11T12:36:45.055710Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.062065Z","title":"write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.062065Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:396c04c0ffb88a6aec41d07752037b2db5d1ff151bb7119aa5ad2dcab07dc2f8","observation_id":"8970b34b-c958-4f5b-a324-7313da3889bb","resolution":{"observed_at":"2026-08-11T12:36:45.062065Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"1607.06450","last_updated":"2016-07-21T19:57:52Z","snapshot_observed_at":"2026-08-12T08:59:05.030983Z","submitted_at":"2016-07-21T19:57:52Z","title":"Layer Normalization","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1607.06450","snapshot_observed_at":"2026-08-11T12:36:45.067537Z","title":"L.; Kiros, J","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.067537Z"},"links":{"cited_paper":"/paper/1607.06450","citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:d3d7736cac4dd3660fb410a690d89864c06621c9e117ed5fa02d9759f147e6de","observation_id":"bff9a8b3-d853-4d20-864d-7923b0390ed0","resolution":{"observed_at":"2026-08-11T12:36:45.067537Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.762848Z","title":"L.; and Nuijten, W","venue":null,"work_id":"ff8e71c9-2c34-4ea7-bc1d-b8d51283d556","year":2001},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.072762Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:f3b361e5eedebe0388f1d972008151c2d4957df90cde74dea7da2dc4c4b5a047","observation_id":"c0623f3b-6dfc-41eb-95ca-a93d208f4978","resolution":{"observed_at":"2026-08-11T12:36:45.766255Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.076759Z","title":null,"venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.076759Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:39a43fc0784df1bc7698ee8c5bc017629799eee6af53b229d254c57f9122a9c2","observation_id":"6c92aebc-0b82-46d4-9dda-d704e70b09aa","resolution":{"observed_at":"2026-08-11T12:36:45.076759Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.747181Z","title":null,"venue":null,"work_id":"bc451d26-7cea-447f-b491-711084f270e0","year":1993},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.080629Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:3a719340f0d062a80de944f66b65f1a56a5636e09601e193cde89341b0210b5b","observation_id":"27a8e78f-aac6-440b-a09f-0672884f0dc7","resolution":{"observed_at":"2026-08-11T12:36:45.750591Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.737803Z","title":"L.; and Kozan, E","venue":null,"work_id":"aa2bd375-bb4b-40f9-83c2-9ff1d191e1c5","year":2018},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.084384Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:686ddcc9d49b74644e4e8b363b99764f15c2a40eb9a448ba0e4163b33f6a66fe","observation_id":"af454a0d-30fb-465a-9c3a-e50eed381e8b","resolution":{"observed_at":"2026-08-11T12:36:45.741237Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.727800Z","title":"H.; and Gnanavelbabu, A","venue":null,"work_id":"40042af8-2838-456d-8292-acfb3318aba5","year":2021},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.088132Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:c375e6268d101a9a8b3e66c693c0ecfb82583087ced17c44bbd9336220633ba5","observation_id":"3d8c6b49-5f42-441d-87dc-e8347f057bf5","resolution":{"observed_at":"2026-08-11T12:36:45.731207Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.716572Z","title":"D.; and Teppan, E","venue":null,"work_id":"9a211577-42a7-4952-9d28-b12cb802b28c","year":2022},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.091956Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:5e3871e1fe54e569142529ef6a3a0601ecca49cf8f2205833c1baad0f3e0eb9c","observation_id":"adc3684d-f21f-498a-bcd5-af0919e17d73","resolution":{"observed_at":"2026-08-11T12:36:45.720632Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.706008Z","title":null,"venue":null,"work_id":"2c586054-807a-41fa-9171-c0c6f73c6edd","year":2023},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.095487Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:bd6a271a64b74760ed34d7a3e34d383576a0eb24582dd38fab97fb33026fcc4b","observation_id":"90ec70f3-8377-4271-8ca5-3b2d75e850bf","resolution":{"observed_at":"2026-08-11T12:36:45.709848Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.695674Z","title":null,"venue":null,"work_id":"fd179fe6-b55f-46ef-99de-578c1bb14ef0","year":2024},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.099008Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:368d79e9d9f323df064a3869cac997f32465b6e7d017e2591c26e7425190c7a6","observation_id":"0228414b-b0f4-49d4-9db2-2cb2f0a28b99","resolution":{"observed_at":"2026-08-11T12:36:45.699187Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.684354Z","title":null,"venue":null,"work_id":"8775f708-5c4b-4c57-9f2f-3f2f915368dc","year":1994},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.103003Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:c23991f77deebabc3c49c232c54859d4ced116e995d9fd2072d4604d28b4258d","observation_id":"91301499-d540-4d01-87c6-1e7b3645c58e","resolution":{"observed_at":"2026-08-11T12:36:45.687614Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.674443Z","title":null,"venue":null,"work_id":"01dcf545-93e0-4aa3-8b42-7eb2fad4f18f","year":2024},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.107207Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:9bee08457ef01539620567cdbd591510297ff99062093814655c9693ccb35456","observation_id":"7dbc9862-3e10-42fe-855a-0dbd2ea9d040","resolution":{"observed_at":"2026-08-11T12:36:45.678496Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.665511Z","title":null,"venue":null,"work_id":"e3b31161-8710-4946-ba8f-8acba0654172","year":2020},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.110682Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:59bb7d1a50f9f10cc9ac76095518ab058f12308ffe138cb2c7a75a7aa17b75b2","observation_id":"4cf00c1e-9f71-4de8-a076-84d4c703325a","resolution":{"observed_at":"2026-08-11T12:36:45.668760Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.655911Z","title":null,"venue":null,"work_id":"7b0a1b6d-abb6-447d-9ef0-c807a12271c3","year":2020},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.114326Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:f76f7cfbe4e7e53d5f1da90d5daf17c94f6cd7db8d22493db4a3129f50e2280c","observation_id":"1228c4aa-87c2-4f24-81e0-b2ab85e7a04f","resolution":{"observed_at":"2026-08-11T12:36:45.658984Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.646973Z","title":null,"venue":null,"work_id":"13932851-9b54-4b00-b31e-a01b61f4e514","year":2021},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.118407Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:bf7308268edc914e925051adb9034cdae03dd97b500d04f9c2dfed012be55f61","observation_id":"271feb13-f6e2-4f57-8e39-9202a922f1f7","resolution":{"observed_at":"2026-08-11T12:36:45.650197Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.637353Z","title":null,"venue":null,"work_id":"a6c2edfe-e7ab-4d6c-be40-b3fa307933a5","year":2019},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":17,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.121921Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:140f17c4e9c2eab93dd2ed148d46e36c91fbc590ff285f258b869d68fdbd7478","observation_id":"bfabdb32-04f7-429c-8f21-20669d9439c1","resolution":{"observed_at":"2026-08-11T12:36:45.640889Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.627995Z","title":null,"venue":null,"work_id":"2d0405e3-6eb5-4e55-8acc-cca184bd118b","year":2023},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":18,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.125802Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:6ae06b01d2881dba32fdcf84e862e75343a04368744d6bd5489f4616182410f4","observation_id":"7431b91d-1e53-4d38-b162-d68b6b4286ac","resolution":{"observed_at":"2026-08-11T12:36:45.631335Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.617919Z","title":null,"venue":null,"work_id":"536a74af-1e7c-4938-b08d-4d12a4c310f7","year":2022},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":19,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.129966Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:53b22a1ef885c8879a7e7286e54eda9e32a00b98e17dc67719e8042718dd548d","observation_id":"cda20e77-eec3-4613-b0e8-5607b151bfad","resolution":{"observed_at":"2026-08-11T12:36:45.621457Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.608151Z","title":"H.; Kim, Y.; and Park, J","venue":null,"work_id":"58b05fb5-eea8-4b7e-9633-93cf7b4d8e58","year":2021},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":20,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.133971Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:95cd5da1c0843396d2e6e7e163e5e7cad8ab7c1d7e7d56c640b14d8b1e875637","observation_id":"a5b98af0-b399-4218-8c6f-d46c90d4d6dc","resolution":{"observed_at":"2026-08-11T12:36:45.611642Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.598013Z","title":null,"venue":null,"work_id":"b8b4d087-fb74-44d8-9b75-e340ab7438a3","year":2023},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":21,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.137608Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:ef9f876cf3dc9741eacdd08869227f2d2608e44cf917c655fdcdb10379392474","observation_id":"6ad77864-9845-440c-9068-243bfe1e0d97","resolution":{"observed_at":"2026-08-11T12:36:45.601905Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2308.12794","last_updated":"2025-03-17T10:18:45Z","snapshot_observed_at":"2026-08-13T10:28:19.779036Z","submitted_at":"2023-08-24T13:49:48Z","title":"Job Shop Scheduling Benchmark: Environments and Instances for Learning and Non-learning Methods","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2308.12794","snapshot_observed_at":"2026-08-11T12:36:45.141325Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":22,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.141325Z"},"links":{"cited_paper":"/paper/2308.12794","citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:ae2c89d62a503184c0fa333a56d31aae42a41293697b2cd6314468e1c333d7ea","observation_id":"22dbc66d-58fd-435d-b5c7-76a771921257","resolution":{"observed_at":"2026-08-11T12:36:45.141325Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.585929Z","title":null,"venue":null,"work_id":"04218048-7dfe-4612-b256-e0134c26bc8d","year":2019},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":23,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.145092Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:049e3fad676dc635d20eea41c0729247c74f9e78ba71d1ecbc2b0ad647e5b4cf","observation_id":"4f544933-e51b-44ef-b5be-a7b9f2176ee9","resolution":{"observed_at":"2026-08-11T12:36:45.589620Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.574636Z","title":null,"venue":null,"work_id":"833409d8-ac22-4252-8402-7e87ce0b9dbf","year":2022},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":24,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.148437Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:5056f7d214b9982a4b829077656d058d14b347729a34185993b460f749399899","observation_id":"dd8de539-2fc3-4cd3-89c6-c69b6d243a79","resolution":{"observed_at":"2026-08-11T12:36:45.578396Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1707.06347","last_updated":"2017-08-28T09:20:06Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2017-07-20T02:32:33Z","title":"Proximal Policy Optimization Algorithms","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1707.06347","snapshot_observed_at":"2026-08-11T12:36:45.152874Z","title":null,"venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":25,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.152874Z"},"links":{"cited_paper":"/paper/1707.06347","citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:0f5c5cbe81112c196809998920a3e7072e746784d26b40957138484a98658b9e","observation_id":"92ab9220-f6ef-4f46-a5e5-a87ad5222e98","resolution":{"observed_at":"2026-08-11T12:36:45.152874Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.156840Z","title":null,"venue":null,"work_id":null,"year":2012},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":26,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.156840Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:f7cca81bfeb02fb98ee7ddb8b02fd58e757b75aeabfd0e3a8d3256fc502d4586","observation_id":"fdc66a4c-8c28-4162-a7f6-17b76bcfd239","resolution":{"observed_at":"2026-08-11T12:36:45.156840Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.560587Z","title":"G.; Zhou, J.; Reijnen, R.; Wu, Y.; Chen, J.; Zhang, C.; Bukhsh, Z.; Zhang, Y.; and Nuijten, W","venue":null,"work_id":"cc893a79-8e94-4ca0-8b55-4aeed7d085d3","year":2025},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":27,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.160288Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:8646459a64aa333a078b4f1c83634ae0f373d5257f6af07d77495a948327eab7","observation_id":"2dd35df5-a408-4db6-8bfc-61366f9ea8cd","resolution":{"observed_at":"2026-08-11T12:36:45.565673Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.547506Z","title":null,"venue":null,"work_id":"b8725425-a42e-4888-af12-4f8648f8e176","year":2022},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":28,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.165006Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:e8937d687568572d70300619c50f5af6c2066fb46bb3caacc973da07104196d7","observation_id":"e02a1134-277b-45bd-af8a-9b213e41eaec","resolution":{"observed_at":"2026-08-11T12:36:45.552518Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.536676Z","title":null,"venue":null,"work_id":"8bb798cd-ef1b-4cdd-9124-71c08da078e6","year":2022},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":29,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.168580Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:d760fff35af57c8696923590f7b1a0b757f7bcaf39ac971101f9acfc0189f6b3","observation_id":"0b3cda9d-f5dd-4de3-be54-c10d25023d8d","resolution":{"observed_at":"2026-08-11T12:36:45.540573Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.172131Z","title":"N.; Kaiser, L","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":30,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.172131Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:5e5b7170711b012f68c896853f82371603a35ffa9a19133e2cfedf955b8b33bc","observation_id":"531cbe13-6989-4dce-8a1c-778eba96bf12","resolution":{"observed_at":"2026-08-11T12:36:45.172131Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"1710.10903","last_updated":"2018-02-04T19:13:29Z","snapshot_observed_at":"2026-08-13T22:35:40.714745Z","submitted_at":"2017-10-30T12:41:12Z","title":"Graph Attention Networks","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1710.10903","snapshot_observed_at":"2026-08-11T12:36:45.175217Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":31,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.175217Z"},"links":{"cited_paper":"/paper/1710.10903","citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:d5f5c95f87527b7825b62693e27d47abfeb763f8ce322ac6bb74013319c29fb0","observation_id":"24dccdbb-6e2c-44e7-b5b4-28cef88cb674","resolution":{"observed_at":"2026-08-11T12:36:45.175217Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.516982Z","title":null,"venue":null,"work_id":"845bd463-061b-4c73-a58a-9c6ceb868c91","year":2023},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":32,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.179134Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:8a148d688a4aba0adb22009c6dd94d9d1550f92a8390cf8cc1d9c0d22cbd171e","observation_id":"540bd275-e735-4542-b9fa-dd6ea42ac894","resolution":{"observed_at":"2026-08-11T12:36:45.521511Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.504992Z","title":"S.; and Chi, X","venue":null,"work_id":"3bf9577a-7393-40c1-ade9-fbba3974ae7d","year":2020},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":33,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.182425Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:f3f28f645b81ab424f9cbad24f37221693d1306cb21b254889d7910eb28db6ac","observation_id":"2a32fec2-bc3f-49bd-8797-555a2ab87a17","resolution":{"observed_at":"2026-08-11T12:36:45.508712Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2016.11452","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.363837Z","title":null,"venue":null,"work_id":"37c9b8e4-fd8b-42e2-a4a0-aef6524a7649","year":2016},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":34,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.185900Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:271fec8c9cca8ae1d39f541b811ed209fa0ff2c45c11c5de3cc0be10ce0ae95a","observation_id":"937ddb75-ad52-4820-be6e-505d5a275216","resolution":{"observed_at":"2026-08-11T12:36:45.371052Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-11T12:36:45.493114Z","title":null,"venue":null,"work_id":"e4c21891-6121-42d2-993a-c65e81db356b","year":2023},"citing_paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems","version":1},"reference_index":35,"source":"arxiv_source","source_observed_at":"2026-08-11T12:36:45.189116Z"},"links":{"citing_paper":"/paper/2412.14052"},"observation_digest":"sha256:762b738232db4d4800d20a0dac2b96665cf54202970034e58981c57848ac980d","observation_id":"0654a5b7-981f-437f-88ed-d888801d1985","resolution":{"observed_at":"2026-08-11T12:36:45.497157Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-13T06:32:02.005865+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2412.14052","last_updated":"2024-12-18T17:05:33Z","latest_version":1,"primary_category":"cs.AI","snapshot_observed_at":"2026-08-11T12:29:38.227322Z","submitted_at":"2024-12-18T17:05:33Z","title":"Neural Combinatorial Optimization for Stochastic Flexible Job Shop Scheduling Problems"},"reference_resolution":{"displayed":35,"state_counts":{"malformed_identifier":0,"metadata_mismatch":1,"parse_uncertain":0,"unresolved":27,"verified_exact":0,"verified_fuzzy":7},"total_outbound_references":35},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-13T06:32:02.005865+00:00","source":"crossref"},{"observed_at":"2026-08-13T06:31:53.387327+00:00","source":"retraction_watch"}],"thesis":"As of 14 August 2026, this Paper Citation Record lists 35 of 35 outbound references and 0 inbound Pith citation observations for arXiv:2412.14052."}