{"as_of":"2026-08-11T04:17:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:42591c8614db891118d88e146ba111e880c5959b73edfd19fecca810e6976443","coverage":[{"denominator":40,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":40,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-10T16:27:56.468850Z","state":"measured"},{"denominator":40,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":40,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-10T06:31:04.303077+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2501.13270/citation-record","integrity":"/paper/2501.13270/integrity","json":"/paper/2501.13270/citation-record.json","paper":"/paper/2501.13270"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.081314Z","title":null,"venue":null,"work_id":"a2073a79-e02f-4285-b808-2c88377209bd","year":2017},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.327676Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:81f9d020c7b1556677c8e7e04b7182a9c83fc20dd7d7d314471bd63b25333c56","observation_id":"1f2254be-a4e7-4ebf-9530-4ba17807bc83","resolution":{"observed_at":"2026-08-10T16:27:57.084573Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.071429Z","title":null,"venue":null,"work_id":"db65afad-305c-40b2-9f57-1a22f203bdbb","year":2007},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.332073Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:927769bcf44b35121ce5066c5fb91b48e954553e3007cc2e8edee28f16f2e5b7","observation_id":"9b56c1e2-5c1a-4fa3-b9b4-5fb929a6a990","resolution":{"observed_at":"2026-08-10T16:27:57.074698Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.061613Z","title":"Alessio, A","venue":null,"work_id":"62112ab8-25ff-4495-9402-6c33dda446ee","year":2009},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.335974Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:a59bada0feae39ffeedf2a943c3adcc57fa64482d66f14d4187c5332b72a813b","observation_id":"6eec1aa8-0d41-4b9c-bfb1-7257258a5a82","resolution":{"observed_at":"2026-08-10T16:27:57.065189Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.051996Z","title":"Kvasnica, P","venue":null,"work_id":"ea36001d-c0cb-40ae-94da-31ecac9811b0","year":2019},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.339818Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:fa80a2b8a42cd2af4867c9bb609dba8d8743e441108c61949d7f4b60d9f70807","observation_id":"fcfcc061-2116-499c-af92-12bee7a346a4","resolution":{"observed_at":"2026-08-10T16:27:57.055396Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.041340Z","title":null,"venue":null,"work_id":"89c18642-28b5-4141-9775-a4c55df5a11d","year":2020},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.343939Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:b3323bd755aaea1f4b25b78dfa21ba876fc33260ea7779819741f6a332ac842f","observation_id":"57e6c8d4-9768-4c92-9032-6e6de2d38a61","resolution":{"observed_at":"2026-08-10T16:27:57.045314Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.031434Z","title":"Henriksson, D","venue":null,"work_id":"481924d6-57da-4b8a-8cbd-58a13d1650b0","year":2012},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.347697Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:93a68487a9011bcd2e453fb90e1c5d3c06b96836311963048476fa75cee022c5","observation_id":"69897f1e-67a1-476e-9f3d-828cefddb802","resolution":{"observed_at":"2026-08-10T16:27:57.034901Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.021466Z","title":null,"venue":null,"work_id":"68180c36-b60c-4937-8672-c3438ce86cfe","year":2022},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.351456Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:59d1250d64d33cedbb4d5f65a9474b153e633c0c89564749f1ba462d261cea98","observation_id":"5269c038-e17c-4ea9-9194-8d10f8b82015","resolution":{"observed_at":"2026-08-10T16:27:57.024991Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.011681Z","title":null,"venue":null,"work_id":"60ea2517-e10c-49b8-879b-55bee58aa413","year":2020},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.354918Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:bbc7cb54204b713cfc7e2d28f6d85a992077a8888795f6ab7c9d1658741d3ebb","observation_id":"3bba6b8f-4d91-426a-8691-2e1862f0a04f","resolution":{"observed_at":"2026-08-10T16:27:57.015346Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:57.001778Z","title":null,"venue":null,"work_id":"c0acec9f-b509-41cb-9638-86cadcfd5e2f","year":2018},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.358318Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:13d0bd5d3d571cf81f80eb50ea2d24b3a246347a10cb961de7e61248974ee609","observation_id":"6c57a7dc-531a-4378-a384-6709e4c8f88a","resolution":{"observed_at":"2026-08-10T16:27:57.005233Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.992391Z","title":null,"venue":null,"work_id":"77bb1679-aeef-4d4f-9294-eae11a3f303b","year":2020},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.361677Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:bf0bafaf90704b64c794c741bf5e04b8a003cb0d4ef78734149841942c7a733d","observation_id":"1e59edec-27c9-4c1a-944e-c8be5d4b8317","resolution":{"observed_at":"2026-08-10T16:27:56.995441Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.983196Z","title":"Heydari, M","venue":null,"work_id":"73e1b210-1c0d-4d73-af90-3e54651c1c11","year":2022},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.364945Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:f8ea43874ca8ffd80fe66051ebefdfe6bbe2c03cf94aae6bdac69d6128f60889","observation_id":"c7c4a655-7f19-4ffe-8afd-abed3f3c5ef9","resolution":{"observed_at":"2026-08-10T16:27:56.986338Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.974096Z","title":"Cimini, A","venue":null,"work_id":"bef01126-03d7-42cb-ab9c-f4f5ace9c604","year":2017},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.368434Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:32e61b44d259f0ee8120eb8c967a63a744e0a61e8517e690d5b55557ce2b3677","observation_id":"9f892658-eb54-4164-9d17-d83c536f4caa","resolution":{"observed_at":"2026-08-10T16:27:56.977419Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.964510Z","title":"Ghaemi, J","venue":null,"work_id":"8704f824-0165-4a67-b3ae-cdb49e22d2b4","year":2009},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.371678Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:61aaa0ec2073c69aff58c8ca5123defc08b6a69a8eb21253400e60803b677cfc","observation_id":"6f5fd23a-0bc5-4be3-b3ec-b4217436c598","resolution":{"observed_at":"2026-08-10T16:27:56.967836Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.955298Z","title":"Liao-McPherson, M","venue":null,"work_id":"5a9cb55e-dd17-42f1-9815-633ffdaa7a5f","year":2020},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.375164Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:97e809d55aa4c69c85f3a0d0c5ccc0da9336520cdc9943af4ea2bc1150c1c17a","observation_id":"1ddcbd2a-3726-438e-9961-2b199a88318e","resolution":{"observed_at":"2026-08-10T16:27:56.958661Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.945901Z","title":"Feller, C","venue":null,"work_id":"daaacdc3-6f2b-4b0d-ab26-dd61cadb4318","year":2017},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.378917Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:632dea5c830a4635f311ef4947419f5628b3cabac6d9160a1342bc4776b22c36","observation_id":"dcd27d0b-1270-42af-9077-6fc6154a446e","resolution":{"observed_at":"2026-08-10T16:27:56.949445Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.936585Z","title":"Feller, C","venue":null,"work_id":"0b91d9ee-db51-448e-a390-bb11835f9545","year":2018},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.382176Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:fefb541d3a8c662d0819a18258036639086a41bb27d66697aa33b8d29d0deb62","observation_id":"51523eb3-d74e-4e0e-b2ee-eeb3a51a0cf8","resolution":{"observed_at":"2026-08-10T16:27:56.940181Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.927215Z","title":"Gharbi, C","venue":null,"work_id":"7659bf69-1e23-4abb-b9b8-0c0c13d4c1dd","year":2021},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.385500Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:e36f1cf6b2d57d67e4f1aae1971af656e85311a4965f557683fe854be59730a5","observation_id":"2431ee66-2c15-4cbf-8bdf-05c3971dc27d","resolution":{"observed_at":"2026-08-10T16:27:56.930456Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.389565Z","title":"Amiri, M","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.389565Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:e4106d9299f1c03e0b16d3aa8f089fac4eee1fc461e205da3f392e151974eea4","observation_id":"28e11eaa-bbc8-471a-be91-fb9ea0b1e26f","resolution":{"observed_at":"2026-08-10T16:27:56.389565Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.917655Z","title":"Limon, I","venue":null,"work_id":"ebc9f0f5-26d2-4028-967b-771bba65a1de","year":2008},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.392943Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:7cd4d86ed133114af7c6379fd80f181256a883dff427d58f2579769f6ffe4689","observation_id":"8e1301fa-2fd7-478d-b483-0910d72d2a6c","resolution":{"observed_at":"2026-08-10T16:27:56.920944Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.907914Z","title":"Ferramosca, D","venue":null,"work_id":"3a255701-8669-4944-9857-63a1c13c677b","year":2009},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.396313Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:bc280e1ed5d7133b9c5e6baad2f94dce4eff3683d42d14c2c6b513928810894b","observation_id":"c7f061dd-f76e-470b-aaa6-313d4ce20059","resolution":{"observed_at":"2026-08-10T16:27:56.911388Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.898516Z","title":null,"venue":null,"work_id":"1d9a203c-8695-4688-8afa-4d0ff965160b","year":2018},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.399500Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:b79f94f9e39b8414089fde8b47d87e47eac4754fe659ac5b2fbcfa21139b9a6e","observation_id":"6c214d30-6615-49d1-997f-00f7aff0ca43","resolution":{"observed_at":"2026-08-10T16:27:56.901741Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.888952Z","title":"Nicotra, D","venue":null,"work_id":"5974edcc-7ef3-4f95-9e51-337a87b750a0","year":2018},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.402940Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:f8d193c10aca3ccf36f6bb4ec2036a482ef7bde583360db09b57e28240b831cc","observation_id":"00207af0-3ae4-4997-9e00-feb967c8dcaf","resolution":{"observed_at":"2026-08-10T16:27:56.892203Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.879601Z","title":"Hosseinzadeh, E","venue":null,"work_id":"3b89ddb7-8c39-4243-8766-b25f0638bfc4","year":2019},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.406368Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:27f947c1641b24ff143c971119231e26b03278be8ba379b4f5d0c07379e225c2","observation_id":"c60df943-10a7-4916-bddc-dfdcab289fbb","resolution":{"observed_at":"2026-08-10T16:27:56.882881Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.413134Z","title":"Hosseinzadeh, B","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.413134Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:e9419568447dc89495ec4d9dd1a0459b5110779deb14d4243678378516a665f1","observation_id":"01cb340c-27d1-4b6f-9f91-04df18b41997","resolution":{"observed_at":"2026-08-10T16:27:56.413134Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.859811Z","title":null,"venue":null,"work_id":"7268c76c-4933-4829-9984-f112fcf99380","year":2006},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.416749Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:f931104aa895064fb3ee839ae1dc589f42faabf306862a238022ed1084f0943b","observation_id":"71f23bd5-1ee3-44a5-8dd6-24052c5a6502","resolution":{"observed_at":"2026-08-10T16:27:56.863241Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.839986Z","title":"Hosseinzadeh, B","venue":null,"work_id":"b938ef4a-feb0-4a07-9f23-e38a1330d8f0","year":2022},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.423671Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:de331e7d3fccf4790d96d16409cfab3f836142b207763b5773d94781711f3337","observation_id":"abf279d4-6767-44c5-bdb4-47be5379658b","resolution":{"observed_at":"2026-08-10T16:27:56.843437Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.829225Z","title":"Strang, Introduction to Linear Algebra, Wellesley-Cambridge Press, 2016","venue":null,"work_id":"aa1be593-f794-4779-a515-8a90732b456f","year":2016},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.426762Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:ba1f5d0524e2463f8ecae685881c7e6ecec27628f1bcf19e5617d80b2132e334","observation_id":"a55a36e4-1042-482e-b280-ac539e71ec06","resolution":{"observed_at":"2026-08-10T16:27:56.832840Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.818743Z","title":null,"venue":null,"work_id":"21604530-192f-406a-97bf-d14cf964ef57","year":1991},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.430019Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:f8dc16844414f50870f520ede60e96f76ea1b4e295ddaf019f10b7f358e76eab","observation_id":"8492f25e-2fbd-4c19-8818-9b463f0b198b","resolution":{"observed_at":"2026-08-10T16:27:56.822285Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.807268Z","title":"Polyak, Modified barrier functions (theory and methods), Mathemati- cal Programming 54 (1–3) (1992) 177–222","venue":null,"work_id":"4ca3d014-c50c-4b82-867f-2b6062a20e3c","year":1992},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.433388Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:08458d2788cbe8e8de05912ce04eaa7f50c16faa3e6763e9d59b13bdf05d8576","observation_id":"f211a6ca-916e-4587-806f-abaa0a484eed","resolution":{"observed_at":"2026-08-10T16:27:56.811444Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.797419Z","title":"Melman, R","venue":null,"work_id":"f868ece2-36c3-4bc4-b3ca-56f4fe0e9d77","year":1996},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.436607Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:52c7e02214500e36a17df3880e49a0ce2dc28b2b6b50bdc8dc32d894b2b4bab9","observation_id":"9a44800e-090d-49b2-b65c-e87391009e45","resolution":{"observed_at":"2026-08-10T16:27:56.800789Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.785006Z","title":null,"venue":null,"work_id":"06601320-eb3c-45a4-baa8-2d173583b711","year":1998},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.439723Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:6d0a125a681864f8da069b3b8881494e216aa7f921add8443f6f516149507bb5","observation_id":"17224bfd-7ffe-4d36-80f3-bd13a80abf34","resolution":{"observed_at":"2026-08-10T16:27:56.789883Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.773775Z","title":"Feijer, F","venue":null,"work_id":"b837c1cc-7edf-415f-844c-e5ada0bd9901","year":2010},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.442803Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:cf391faffb12eeeffbc682572b3d0f5bc65c47b1dc72cbfc518359222d579742","observation_id":"0e31efae-082f-4ebc-8dce-426393f72d9c","resolution":{"observed_at":"2026-08-10T16:27:56.777671Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.850138Z","title":"Hosseinzadeh, E","venue":null,"work_id":"38ae5bf0-c2a4-417c-beb7-65798ab7a16b","year":2020},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.445831Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:2a24ea446bd3b724cbe622403d8dcf5be67354443fac7c6c09a1b45849afd974","observation_id":"55d9488c-eae0-4101-8982-480d15cdfaa2","resolution":{"observed_at":"2026-08-10T16:27:56.853598Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.869704Z","title":"Hosseinzadeh, A","venue":null,"work_id":"0e813479-0ef9-4dcf-b896-8ce05e81f567","year":2019},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.449201Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:a0b02e8ef0039e32fdeb8870d40d16989b87736df361d5f671521df1e431e27a","observation_id":"760d325f-0de1-4b8a-b045-44e8332556ae","resolution":{"observed_at":"2026-08-10T16:27:56.873140Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.763265Z","title":"Hosseinzadeh, E","venue":null,"work_id":"43c5670f-3760-42a5-bc2b-4f1769542430","year":2019},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.452011Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:968c262a9a44abef77ccc7d9251fc83b46674145872b250f5db95d3320427ac6","observation_id":"0e233165-1c76-40a3-aa52-8988b4acef28","resolution":{"observed_at":"2026-08-10T16:27:56.766823Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.455396Z","title":null,"venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.455396Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:b8aca23f65cf8a4893fd34209773bc1a8e051c7428f62c68b7d900794ce81eb2","observation_id":"c521d8a0-8423-4527-9fc8-a3f8b40af58c","resolution":{"observed_at":"2026-08-10T16:27:56.455396Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.752445Z","title":null,"venue":null,"work_id":"413d1ede-e46b-4069-a7bf-c15caca4e573","year":2005},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.458811Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:81abe0ae97cbf1c3607cb5f3cb8847e4832e841740c41a82367c73f4d6dbd88d","observation_id":"fe94c09e-e433-4c93-99fd-4df7c7259737","resolution":{"observed_at":"2026-08-10T16:27:56.755967Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.742272Z","title":null,"venue":null,"work_id":"2a5001a8-ed2f-4f23-bef9-ec8991dbd2cb","year":2016},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.461963Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:a1ab4da1357882f14e7cea5e6a32ccac329c774d06f26c9da919490ca69ccccf","observation_id":"aeff5dc9-f76d-43c2-a2cb-887a9d4d20b0","resolution":{"observed_at":"2026-08-10T16:27:56.745780Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T16:27:56.728032Z","title":null,"venue":null,"work_id":"1578f4e4-cd3c-404e-820f-271a63a60779","year":2010},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.465585Z"},"links":{"citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:79f8a1a953622a51d555419e233101d8404e6c72f9be1bc3f8f3d8c5c9d65978","observation_id":"5ce300e6-a7b8-4b5d-88c7-8184a413fbf3","resolution":{"observed_at":"2026-08-10T16:27:56.734186Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2404.07267","last_updated":"2024-04-10T18:00:21Z","snapshot_observed_at":"2026-08-03T16:06:58.060058Z","submitted_at":"2024-04-10T18:00:21Z","title":"Closed-Loop Model Identification and MPC-based Navigation of Quadcopters: A Case Study of Parrot Bebop 2","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2404.07267","snapshot_observed_at":"2026-08-10T16:27:56.468850Z","title":"Amiri, M","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-10T16:27:56.468850Z"},"links":{"cited_paper":"/paper/2404.07267","citing_paper":"/paper/2501.13270"},"observation_digest":"sha256:63fce10926fb656bfd6bf7373f4e53c1622de4c2a04b3e7d3899891af5536447","observation_id":"a47dfb33-58a0-48dc-bc0a-67e3f1b5741b","resolution":{"observed_at":"2026-08-10T16:27:56.468850Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2501.13270","last_updated":"2025-01-22T23:27:35Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-10T16:16:26.707051Z","submitted_at":"2025-01-22T23:27:35Z","title":"Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control"},"reference_resolution":{"displayed":40,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":18,"verified_exact":0,"verified_fuzzy":22},"total_outbound_references":40},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"thesis":"As of 11 August 2026, this Paper Citation Record lists 40 of 40 outbound references and 0 inbound Pith citation observations for arXiv:2501.13270."}