{"as_of":"2026-08-22T11:56:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:91cb9f1000db30dda043fc96259a9fbe62bf17562e372db27544b18de6fe7872","coverage":[{"denominator":23,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":23,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-10T15:07:50.617621Z","state":"measured"},{"denominator":24,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":24,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-22T06:32:14.747728+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T00:32:10.866941Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"pith","source_observed_at":"2026-08-07T00:32:10.930707Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"cited_work":{"arxiv_id":"2501.14526","doi":null,"metadata_source":"pith","pith_arxiv_id":"2501.14526","snapshot_observed_at":"2026-08-07T00:32:10.930707Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","venue":"cs.RO","work_id":"29961530-b6c1-4097-a8b2-f7c3acc63906","year":2025},"citing_paper":{"arxiv_id":"2506.13622","last_updated":"2025-06-16T15:50:17Z","snapshot_observed_at":"2026-08-16T18:55:07.829883Z","submitted_at":"2025-06-16T15:50:17Z","title":"Disturbance-aware minimum-time planning strategies for motorsport vehicles with probabilistic safety certificates","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T00:32:10.866941Z"},"links":{"cited_paper":"/paper/2501.14526","citing_paper":"/paper/2506.13622"},"observation_digest":"sha256:56fcadf9ec25d29762f9987d915702f6765c57cf59f037cbc8e1882d3df612e8","observation_id":"7e299056-6902-4eff-af9d-6f51d68e2c03","resolution":{"observed_at":"2026-08-07T00:32:10.935697Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2501.14526/citation-record","integrity":"/paper/2501.14526/integrity","json":"/paper/2501.14526/citation-record.json","paper":"/paper/2501.14526"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.477672Z","title":"Model predictive contouring control,","venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.477672Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:df84d10ea9ab235059bd9251c3526d58cf57621619478293ffbbb8d05b3f9b27","observation_id":"d28a46f1-9240-4fe4-954b-06617a86f344","resolution":{"observed_at":"2026-08-10T15:07:50.477672Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.485385Z","title":"Learning- based model predictive control for autonomous racing,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.485385Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:423909e146367dbadd262c7127b78dffaca377c9bdc02f96c4f964687c95b6b3","observation_id":"ed8851e1-00c4-41d9-bcdc-0407af5d7b15","resolution":{"observed_at":"2026-08-10T15:07:50.485385Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2403.17551","last_updated":"2024-06-14T09:48:41Z","snapshot_observed_at":"2026-08-19T15:22:44.159877Z","submitted_at":"2024-03-26T09:58:27Z","title":"MPCC++: Model Predictive Contouring Control for Time-Optimal Flight with Safety Constraints","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2403.17551","snapshot_observed_at":"2026-08-10T15:07:50.493553Z","title":"Mpcc++: Model predictive contouring control for time-optimal flight with safety constraints,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.493553Z"},"links":{"cited_paper":"/paper/2403.17551","citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:d99be53e31be1aa45adeadd8e127e4e92e7f3c0da3d9747ea099f4a056364f59","observation_id":"e0ee1ce6-daf4-47dd-9065-ff26e59cb0a6","resolution":{"observed_at":"2026-08-10T15:07:50.493553Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:51.111868Z","title":"Unmanned aerial vehicles (uavs): A survey on civil applications and key research challenges,","venue":null,"work_id":"e633d477-8c9c-469a-ab92-ec3acd012f4a","year":2019},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.501321Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:15a3da7fc108c09f7d387f66da15098b37cdc8324c3965a91fc2ab4f6083bea0","observation_id":"2bf0e4d4-bf11-4417-b6ab-6caf80fff383","resolution":{"observed_at":"2026-08-10T15:07:51.117809Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:51.083359Z","title":"Time-optimal motions of robots in assembly tasks,","venue":null,"work_id":"fbdaa990-6bfc-426f-b80a-86fd82bade0c","year":1986},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.512982Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:fb1a4910d31660606122cd22518471c88c45cdf244700d0c7e64702de0b41744","observation_id":"199b69c1-b208-4fde-9805-f2e0a53201e7","resolution":{"observed_at":"2026-08-10T15:07:51.091652Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:51.058888Z","title":"A stabilizing nonlinear model predictive control scheme for time-optimal point-to-point motions,","venue":null,"work_id":"c4d59944-b81a-41b0-b19d-3c86775c5fb3","year":2017},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.519266Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:f0ffd80b2e694c0fbebced4c17c74a761ce49a18d1322636481aadc18b6e3f79","observation_id":"dee14704-2162-4824-9b54-7a3b95e46b81","resolution":{"observed_at":"2026-08-10T15:07:51.065618Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:51.038603Z","title":"Timed-elastic-bands for time-optimal point-to-point nonlinear model predictive control,","venue":null,"work_id":"ba534ed1-d05b-431a-9e32-ccec1d8692da","year":2015},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.525973Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:c87bb57633e0ff661a5496b3ae9c46ab8668ea6aed4ffdc26aa9dafff76cb1b6","observation_id":"19072ffa-8afa-41ce-a047-dc40e7c79da7","resolution":{"observed_at":"2026-08-10T15:07:51.044444Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:51.019347Z","title":"Time-optimal point-to-point motion plan- ning: A two-stage approach,","venue":null,"work_id":"8a7e8643-8eed-4e88-ac08-16a6a000c9bf","year":2024},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.531590Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:64df901847f1691cb90b2227e9000d973ba02d79f552c72e6c9e730dc86b9465","observation_id":"a31acb96-3e49-4619-a5ec-173f78db96fa","resolution":{"observed_at":"2026-08-10T15:07:51.026001Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.998287Z","title":null,"venue":null,"work_id":"b1975291-7f28-43b0-b1f7-92821c78dc5e","year":2017},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.536350Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:fa5f7c915a9602ccee4e15ed7d0ac10e444f4eac35da00ae5c780861971ea468","observation_id":"2ba62eff-3b8a-4c20-90d5-33eaa6062efd","resolution":{"observed_at":"2026-08-10T15:07:51.005234Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.978241Z","title":"Robustness and stability optimization of power generating kite systems in a periodic pumping mode,","venue":null,"work_id":"2800eee3-350f-4278-9c08-b81972d9666e","year":2010},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.542083Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:1f45107ad7c2414dedf58e0ccf4a80b73894a19c372aa387031a6343cb7262c9","observation_id":"870b908a-b0b1-4da6-905d-c9854aac8f1f","resolution":{"observed_at":"2026-08-10T15:07:50.984766Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.958496Z","title":"A positive definiteness preserving discretiza- tion method for lyapunov differential equations,","venue":null,"work_id":"db1b07f4-0964-46a6-b312-4e2a33da45f5","year":2013},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.547405Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:653903b3ca87a5829775ee19d18882c1bf053d1a9a684167c91a7c75e7248009","observation_id":"f9ac76d7-7edb-4da0-80ba-b6b3ff7ce797","resolution":{"observed_at":"2026-08-10T15:07:50.963733Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.552220Z","title":"Cautious model predictive control using gaussian process regression,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.552220Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:dfba11a947892c344b96782dfa4f6e5a96b02973b497edcee404cc39795febe9","observation_id":"3382bce5-0ab2-4663-bcd7-7c6b3040d5b3","resolution":{"observed_at":"2026-08-10T15:07:50.552220Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.928499Z","title":"Inexact adjoint- based sqp algorithm for real-time stochastic nonlinear mpc,","venue":null,"work_id":"b8fdd3ec-ccc1-4055-9e84-f81f71539e85","year":2020},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.557350Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:fbea4a061779aec08eb804291c4488a1cfdd2a081ca883af9f054b5274724922","observation_id":"07b45222-73a1-4149-a6b7-870a4479a9e1","resolution":{"observed_at":"2026-08-10T15:07:50.934039Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.911354Z","title":"Zero-order robust nonlinear model predictive control with ellipsoidal uncertainty sets,","venue":null,"work_id":"91946309-6d45-4f08-8013-94091996bbc8","year":2021},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.561890Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:9101eab7204da537eab3eec3ecdaeacc9088f94f5fab48c9bc677366005205e4","observation_id":"ceec10fe-cfa6-450a-a353-170190abe97e","resolution":{"observed_at":"2026-08-10T15:07:50.916487Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.887192Z","title":"An efficient algorithm for tube-based robust nonlinear optimal control with optimal linear feedback,","venue":null,"work_id":"b1be5ea0-f1ea-45f6-a0da-f708225b7fcb","year":2021},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.566232Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:f6fcc59620cea30b09a07cfc6ef8b938f3c09ddcc712b34f75e65d4591a5e237","observation_id":"5cea55b0-4079-4a0c-8846-65376959d6ad","resolution":{"observed_at":"2026-08-10T15:07:50.894573Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.856728Z","title":"Collision-free motion planning for mobile robots by zero-order robust optimization-based mpc,","venue":null,"work_id":"8043195f-054a-432d-b0c3-6b4aa837c6f8","year":2023},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.570508Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:9dacc730222a9e1774f66ac0c89d6f7893445aa13f3b79685d72a46b2509c2b2","observation_id":"91ae940b-db50-4708-bd77-da7c2338c0ba","resolution":{"observed_at":"2026-08-10T15:07:50.867085Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.832809Z","title":"Robustified time-optimal collision-free motion planning for autonomous mobile robots under disturbance conditions,","venue":null,"work_id":"8a0b034d-74e2-4956-8acb-d1ce36483e4f","year":2024},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.579503Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:63b891e49f0596a4f914a4aa8b868dbfa0bb0d38c6ea426ba2c76720c8dbdfbd","observation_id":"c56afb8b-2cb9-4109-8e05-61c73ffeb019","resolution":{"observed_at":"2026-08-10T15:07:50.838963Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2402.06263","last_updated":"2024-03-13T07:53:08Z","snapshot_observed_at":"2026-08-16T14:19:57.888269Z","submitted_at":"2024-02-09T09:24:42Z","title":"ASAP-MPC: An Asynchronous Update Scheme for Online Motion Planning with Nonlinear Model Predictive Control","version":2},"cited_work":{"arxiv_id":"2402.06263","doi":null,"metadata_source":"pith","pith_arxiv_id":"2402.06263","snapshot_observed_at":"2026-08-10T15:07:50.679487Z","title":"ASAP-MPC: An Asynchronous Update Scheme for Online Motion Planning with Nonlinear Model Predictive Control","venue":"cs.RO","work_id":"db8f81e9-60a9-41fb-a8f1-512749d56a1f","year":2024},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.584399Z"},"links":{"cited_paper":"/paper/2402.06263","citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:9a0b7561fa99a85bab6abe1e58c06bd3812c103d3349c4992d4176c6c619d92e","observation_id":"acf3e81c-f145-45ce-b37a-742863ba61c1","resolution":{"observed_at":"2026-08-10T15:07:50.692989Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.809419Z","title":"Practical methods for approximate robust periodic optimal control of nonlinear mechanical systems,","venue":null,"work_id":"2467d9de-2d19-48f9-81f4-2caf43270a1c","year":2015},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.589823Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:85efd5d638652acff9686efa0e7aaf4d5d20bf9f9ca4d30b1e63398dffeca1c6","observation_id":"0d25d53a-9594-472d-9a17-d521effc6e0b","resolution":{"observed_at":"2026-08-10T15:07:50.815972Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.789262Z","title":"On the implementation of an interior- point filter line-search algorithm for large-scale nonlinear program- ming,","venue":null,"work_id":"16dde1b1-c643-4b8b-b269-680ebfd6841d","year":2006},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.594661Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:45f9dd5099a96883387c0561e8ea6ee08c821672503fd425e12dfa92c322f4e2","observation_id":"f96c0338-e3f0-425e-87be-7648fd6c095b","resolution":{"observed_at":"2026-08-10T15:07:50.795811Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.767361Z","title":"Effortless modeling of optimal control problems with rockit","venue":null,"work_id":"f8bff152-ee2a-4e1b-bd47-18fffa1ffea7","year":2020},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.604146Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:7113ded5a451389fbf5b145fb559728431b816fdf63237ff70ae2a85866d7b26","observation_id":"5ed857a5-2376-4f38-a5b6-bef82a67ff06","resolution":{"observed_at":"2026-08-10T15:07:50.773861Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.747384Z","title":"A collection of fortran codes for large scale scientific computation,","venue":null,"work_id":"5d86e570-0507-409b-96ea-9cf2054aa815","year":2023},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.610379Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:460166fa3571a350ee4ae08572092698207257aff786bea28ec501bcea93bac1","observation_id":"f6a33eaf-1ab9-4ffc-aa88-eff6668b9a22","resolution":{"observed_at":"2026-08-10T15:07:50.752065Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T15:07:50.617621Z","title":"CasADi – A software framework for nonlinear optimization and optimal control,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-10T15:07:50.617621Z"},"links":{"citing_paper":"/paper/2501.14526"},"observation_digest":"sha256:991f8cca4c8e72bd35a06a8e02975c6c81a600a8fd93ad1e9c62c38950d05928","observation_id":"b6992d75-6020-4a52-9630-e12483352be6","resolution":{"observed_at":"2026-08-10T15:07:50.617621Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2501.14526","last_updated":"2025-01-24T14:29:58Z","latest_version":1,"primary_category":"cs.RO","snapshot_observed_at":"2026-08-15T20:54:53.150608Z","submitted_at":"2025-01-24T14:29:58Z","title":"Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty"},"reference_resolution":{"displayed":23,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":6,"verified_exact":1,"verified_fuzzy":16},"total_outbound_references":23},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"thesis":"As of 22 August 2026, this Paper Citation Record lists 23 of 23 outbound references and 1 inbound Pith citation observation for arXiv:2501.14526."}