{"as_of":"2026-08-15T05:44:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:7b3f9fe25d9e754d84626abed41c8423660410a44a658ce54847fac211a55a9c","coverage":[{"denominator":36,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":36,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-10T14:24:36.756011Z","state":"measured"},{"denominator":36,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":36,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-14T06:32:32.682623+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2501.15406/citation-record","integrity":"/paper/2501.15406/integrity","json":"/paper/2501.15406/citation-record.json","paper":"/paper/2501.15406"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.314373Z","title":"Risk-based resource allocation for collaborative system design in a distributed environment,","venue":null,"work_id":"a5b96b49-3b29-44f6-9e03-3335cf9be759","year":2008},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.626971Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:fe951bd3e6e54d0046cd5be1ecd7aad3568fca3e2500cc294c3cbf28cef604e5","observation_id":"79e6f34a-39be-4302-bf02-9cfa891cd2fe","resolution":{"observed_at":"2026-08-10T14:24:37.318274Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.303236Z","title":"Uncertainty quantification in dynamic system risk assessment: a new approach with randomness and fuzzy the- ory,","venue":null,"work_id":"5fdabe0d-eb1e-4b35-a64f-5904464037c6","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.631846Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:9cdaeb972ddb5a8c85b18e625efb0ae88b0af09d8436a6dec7f7d2d3688f6a68","observation_id":"d78213aa-59be-4bc6-84e7-6070c5534d26","resolution":{"observed_at":"2026-08-10T14:24:37.307170Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.291900Z","title":"Petri net extensions for modelling and validating manufacturing systems,","venue":null,"work_id":"84ca1045-6a47-436d-aef3-de9856a9703a","year":1994},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.635775Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:4f64dcad7963c58653157420a82a7784ae6de89f8245a992329e5573e543e1af","observation_id":"8495d3d4-7461-4d34-92b3-15123926ee8c","resolution":{"observed_at":"2026-08-10T14:24:37.295777Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.280762Z","title":"Availability modelling of repairable systems using bayesian net- works,","venue":null,"work_id":"65f4a0a0-6994-42a4-afe1-4821288ce816","year":2012},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.639522Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:5f9e10a7cfd62838d0a51352c634cf75c9b8abb6533ef8ba58eecc5975641ad8","observation_id":"7d625d36-bc5b-4be3-9b9d-b6bf8e513c91","resolution":{"observed_at":"2026-08-10T14:24:37.284771Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.268889Z","title":"A framework for building dimensionless behavioral models to aid in function- based failure propagation analysis,","venue":null,"work_id":"04ccd4e9-7d92-4007-8040-e5d5964c3689","year":2011},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.643265Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:5f58627423c77d46e9b98e1e47a37ecde89c529109ffb9a56cb80f160b17203f","observation_id":"6c76bc32-7ba0-4eac-a26f-47a7079e7072","resolution":{"observed_at":"2026-08-10T14:24:37.272989Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.257835Z","title":"Generalised fuzzy cognitive maps: Consid- ering the time dynamics between a cause and an ef- fect,","venue":null,"work_id":"f0f362b6-f061-44f5-9cf6-90531ae66b1d","year":2020},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.647192Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:d0dfea99c3623f6abc662cda0a6d2869a342988efd52e414dd97eb94fe7b1f39","observation_id":"b50c1765-97d5-490b-a033-7dd723b370ca","resolution":{"observed_at":"2026-08-10T14:24:37.261613Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.246564Z","title":"Fuzzy cognitive maps,","venue":null,"work_id":"318916ee-48ae-4003-931a-37bcc8697135","year":1986},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.651119Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:d133a1efb849be3f9a4a146ea0c75f5666ed095a5c682b99e494f5a901ef410b","observation_id":"9a633271-7493-4a76-96f6-91380f497df4","resolution":{"observed_at":"2026-08-10T14:24:37.250603Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.235117Z","title":"A review of fuzzy cognitive maps research during the last decade,","venue":null,"work_id":"ef53dc4c-5ac1-4832-b883-06535d5a1730","year":2012},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.654796Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:90a52704e6e80d1e7818c9b69938a753e7726c8801cab9977bc697267b4f13fa","observation_id":"de37e054-b540-41b1-844f-a137321d5e49","resolution":{"observed_at":"2026-08-10T14:24:37.238966Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.222357Z","title":"A review on methods and software for fuzzy cognitive maps,","venue":null,"work_id":"3ab42cab-800b-4785-be4e-4720063830b6","year":2019},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.658399Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:d981101f89659321c4f0a57a2f63143ebacd9f1aeb93a7fde0e60b1da39be3c3","observation_id":"d5de8057-cc17-429e-a186-bfb313c06d12","resolution":{"observed_at":"2026-08-10T14:24:37.226464Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.210927Z","title":"Fault tree analysis: A survey of the state-of-the-art in model- ing, analysis and tools,","venue":null,"work_id":"7c93b996-ccb9-4f6b-bf28-ed3ec15a5f81","year":2015},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.661903Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:879a27f54901a9bb755b869d3c1c0f6fd6c6ec0fbea1b781ba93050ab7f01647","observation_id":"d0a9a0bd-55f7-493c-aa5a-8e5bc000f17a","resolution":{"observed_at":"2026-08-10T14:24:37.214833Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.199907Z","title":"Failure mode and effect analysis improve- ment: A systematic literature review and future re- search agenda,","venue":null,"work_id":"960ce7be-4fa1-4805-bce9-874988527ff2","year":2020},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.665582Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:0de3429fcb1c1e0330a730a71914f9a1568ef7df803cb57c655048c358ba6196","observation_id":"c2907689-f495-4a27-8b6c-31762b573733","resolution":{"observed_at":"2026-08-10T14:24:37.203869Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.187786Z","title":"On a machine interference problem with several types of machines attended by a single repairman,","venue":null,"work_id":"1e6ae3bc-0e91-40bf-b3f1-2245ddeba906","year":1983},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.669332Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:f90ccb139cb158dbcb1bd397d6015b9b2194200b55b598a174ad9fe524dc7f71","observation_id":"3bafb5f0-e573-4511-9b63-91021c86fcc2","resolution":{"observed_at":"2026-08-10T14:24:37.192256Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.065702Z","title":"Time-dependent risk associated with dete- rioration of highway bridge networks,","venue":null,"work_id":"b014cce7-1db8-4f08-a3e0-dfcd1125a36b","year":2013},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.672519Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:998fce3ba4382acf73931288e93ab4e0a3e94bd5f14ec6ddc74c0d0c112759a1","observation_id":"20838eb0-997f-411d-8a73-d4afc7cbb8e8","resolution":{"observed_at":"2026-08-10T14:24:37.069626Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.053877Z","title":"Monte carlo simulation of tolerance synthesis equations,","venue":null,"work_id":"83ec75b7-b3cc-47a8-9a63-cbfc4dfa23da","year":2001},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.676347Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:a2c3e3acc821cca33e726664ba47022874dc124325c6422d8b696ce090c8e458","observation_id":"dcdb5532-861e-4cd3-bc5d-c1501048489d","resolution":{"observed_at":"2026-08-10T14:24:37.058096Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.041892Z","title":"Reliability analysis with monte carlo simulation and dependent kriging pre- dictions,","venue":null,"work_id":"73d9f280-375b-429a-a311-b04cdf08cd52","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.679745Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:b67687ffd2dd5b58d06fa2aa87c663115bdcbb786f9834eed74db6127332563d","observation_id":"ae018ab8-8e7a-43ca-90d5-9bd31e1b8918","resolution":{"observed_at":"2026-08-10T14:24:37.046290Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.030603Z","title":"Quantitative risk analysis of offshore drilling op- erations: A bayesian approach,","venue":null,"work_id":"b7e75de8-bd06-4ade-810c-385f51389452","year":2013},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.683227Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:b00dddf2300657acb14a0b3c03111832399154bf82ce96d9a56d930767ba6f00","observation_id":"e59e0c06-8240-4533-9547-29f67487be6c","resolution":{"observed_at":"2026-08-10T14:24:37.034596Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.018600Z","title":"Resilience model- ing and quantification for engineered systems using bayesian networks,","venue":null,"work_id":"16f5a769-44b7-4628-ad0e-e9077845fb47","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.686654Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:684b303146179737a630a0a28aebf9d1dfbb5246e02fc5ac93ed4223b35936dd","observation_id":"b2171666-73dd-4e0f-b361-ab9244ca57d4","resolution":{"observed_at":"2026-08-10T14:24:37.022858Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.004546Z","title":"Bayesian computer-aided experimental de- sign of heterogeneous scaffolds for tissue engineer- ing,","venue":null,"work_id":"54da0a09-256c-4e00-90b5-781f7f90f08b","year":2005},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.690219Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:bcd7e9557dc6ec550f3ae760778243681db402012c68b517352631d45acebc97","observation_id":"496d1340-530a-4c61-8dc8-406767a75bf6","resolution":{"observed_at":"2026-08-10T14:24:37.009601Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.991240Z","title":"Applica- tions of bayesian networks and petri nets in safety, reliability, and risk assessments: A review,","venue":null,"work_id":"6ef6da53-50bf-47d6-81c3-608f648fb1c6","year":2019},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.693736Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:04d844cb490d8dacd8b82822d94c1fa49b8023d3b69e93c3810dd21419e29db1","observation_id":"e397a33d-7ea4-436e-b630-27d458c874b4","resolution":{"observed_at":"2026-08-10T14:24:36.995542Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.979304Z","title":"Extended object- oriented petri net model for mission reliability sim- ulation of repairable pms with common cause fail- ures,","venue":null,"work_id":"55b6beb5-d7f9-49a9-9a29-9005cd39ba09","year":2015},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.697500Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:aa46d06404f40465cac40d7f52a22f42bef7f35884dcc4e883601bb3063ddf1e","observation_id":"7799b84a-7ff9-47de-93e0-1bbbf9933257","resolution":{"observed_at":"2026-08-10T14:24:36.983584Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.968438Z","title":"Modeling the design process of product variants with timed colored petri nets,","venue":null,"work_id":"636ed8a7-e283-4471-906e-3c6cf25ed3b2","year":2009},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.700996Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:b7d4ddb732d7bd008787c906f1b15dea1b43f620e83d1023e6c709afc1dfe4f4","observation_id":"4347be95-5d77-490c-9965-1c1f2f765706","resolution":{"observed_at":"2026-08-10T14:24:36.971977Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.957659Z","title":"Bayesian in- ference in probabilistic risk assessment—the current state of the art,","venue":null,"work_id":"06b074be-d9bb-42ac-9b83-0a7255a7106d","year":2009},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.705238Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:7dbecaf33d4f9aa5210c5a2b14187d0ba7173a8b5f024ff68782cca42d80d470","observation_id":"814b3687-f235-4c99-a505-f73d1e39d79c","resolution":{"observed_at":"2026-08-10T14:24:36.961444Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.947206Z","title":"Markov re- generative stochastic petri nets to model and eval- uate phased mission systems dependability,","venue":null,"work_id":"cb3d0094-548b-4de4-b34f-595ca2f524af","year":2001},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.708730Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:8a093f5526a03ac6a5e5c4b3f22da76d800b3debd2b6648f59598140ca3d2f2a","observation_id":"ac170607-a692-42bf-9628-211229d0443c","resolution":{"observed_at":"2026-08-10T14:24:36.950869Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.936635Z","title":"Soft- ware failure prediction based on a markov bayesian network model,","venue":null,"work_id":"0c83841a-830b-49d4-92a5-3f2ca2c0fd10","year":2005},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.712470Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:86efdc86bfe6ca8bbd1f9c29f546014716c040402ba388906dffe08240ed83be","observation_id":"349acaf4-ec18-4ae8-834c-d69ca4dfbfcf","resolution":{"observed_at":"2026-08-10T14:24:36.940397Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.924269Z","title":"A bayesian monte carlo-based algorithm for the estimation of small failure probabilities of systems affected by uncertainties,","venue":null,"work_id":"adfdc488-bcb7-483b-9b01-8e8cec3d23ae","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.716277Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:fcf10be5763949319e6a69ea97c55c5cbf4e9a92996ff96a62b9159236a9cc70","observation_id":"8ea70697-ccf4-4919-b417-16e92d79520a","resolution":{"observed_at":"2026-08-10T14:24:36.928630Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.912800Z","title":"Dcr-based causal design knowledge evaluation method and system for future cad applications,","venue":null,"work_id":"22ca84c8-81c5-4d6d-9ad1-b81875afa24b","year":2012},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.719824Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:88630f258134027459ce0559e206d19fddae8f832828c055698de66ccef75466","observation_id":"4182e569-067e-4e2e-af56-f784a6a13b52","resolution":{"observed_at":"2026-08-10T14:24:36.916780Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.901255Z","title":"I., 2013, Fuzzy cognitive maps for applied sciences and engineering: from fundamen- tals to extensions and learning algorithms , V ol","venue":null,"work_id":"d5669e6c-a35f-4d8e-a7a4-ae860eafc395","year":2013},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.723386Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:f736e7855d1444436d13f6fc18cc81b28fd6cd11ab1cd60ee6563204b89e75df","observation_id":"2de8add6-6934-4c0e-8ff4-39da84fad6fe","resolution":{"observed_at":"2026-08-10T14:24:36.905310Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.889848Z","title":"A hybrid intelli- gent model for assessment of critical success factors in high-risk emergency system,","venue":null,"work_id":"39c73de1-cd80-469e-94aa-85000db47ad3","year":2018},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.727163Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:7392d6f98450cc3e730ce87d5317f96d755fcb0c4a7e25134b6dc2263b21a51a","observation_id":"fe984310-1007-4081-a571-a7ea8aba6a2f","resolution":{"observed_at":"2026-08-10T14:24:36.893811Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.876529Z","title":"Dynamic risks modelling in erp maintenance projects with fcm,","venue":null,"work_id":"79215731-3a0e-4487-97b9-d5c8d052d830","year":2014},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.730576Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:917322b0ddb205fb8c1c943c628a00b990c804811a25c33a51a0f37245e4d958","observation_id":"50dda42f-6e0f-491d-9b19-b95f98539df3","resolution":{"observed_at":"2026-08-10T14:24:36.882113Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.863560Z","title":"Analyzing risk impact factors using extended fuzzy cognitive maps,","venue":null,"work_id":"25930d19-bf11-4f93-ad38-410033b7258d","year":2011},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.734399Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:998a407d0f06549a05af042339b6bde5255b2c0025d72e3b3901922fe6ec9024","observation_id":"dba09ad9-df23-4b57-97cf-b0321c99a9de","resolution":{"observed_at":"2026-08-10T14:24:36.867709Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.850761Z","title":"A hybrid decision-making approach based on fcm and moora for occupational health and safety risk analysis,","venue":null,"work_id":"d03e814f-9f7f-49e2-9b17-b21b56f7d6ae","year":2019},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.738017Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:ba6ee26d58782efbef32b1adbeeca9cbbfd853b18154245bd42cd41183d355cc","observation_id":"0411b178-680e-4e44-b33d-ab928e410632","resolution":{"observed_at":"2026-08-10T14:24:36.855655Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.838098Z","title":"Risk evaluation in failure mode and effects analysis using fuzzy weighted geomet- ric mean,","venue":null,"work_id":"af2f2e47-7d79-4542-9a9d-c18fe7af6ae1","year":2009},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.741651Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:f8bad033d50a48624d68dde7df1858b3bfb899b28c72fdae0b8f973415c19af3","observation_id":"27a67013-b9e7-412c-a60a-4f57ce8136c9","resolution":{"observed_at":"2026-08-10T14:24:36.841990Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.825450Z","title":"A decision-making method for complex system de- sign in a heterogeneous language information envi- ronment,","venue":null,"work_id":"43812d98-7621-4386-80ad-b7345ad1d6d1","year":2021},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.745359Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:6caa3905d44dc200d3db873d664ecb3a6288332f4b99cddf0ca5535106d0556d","observation_id":"6e82dc70-676d-4f3c-966f-dd85a255ff3f","resolution":{"observed_at":"2026-08-10T14:24:36.829628Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.810764Z","title":"Probabilistic linguistic term sets in multi-attribute group decision making,","venue":null,"work_id":"53fe7634-163b-4178-806a-4094da87f1cd","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.748770Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:63c12a37c01027811febd93d45f9adbaf1a2f89158480ad021c96df2de6613fe","observation_id":"bb8d185c-a5b0-4346-8de7-3ab89ae0737d","resolution":{"observed_at":"2026-08-10T14:24:36.815356Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.798316Z","title":"Consensus, dissension and pre- cision in group decision making by means of an al- gebraic extension of hesitant fuzzy linguistic term sets,","venue":null,"work_id":"1540f80a-2115-4c1c-975f-57a4f101e690","year":2018},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.752409Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:588373fd90a677318fc3b3780e6bf2d2b8fb8e1aab24b4fc5a8be6fc9ff24476","observation_id":"d37964f2-f3e6-487b-99cf-97e211c2f277","resolution":{"observed_at":"2026-08-10T14:24:36.802486Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.784225Z","title":"Approximating the condition and maximum load of an engine by comparing en- gine measurements,","venue":null,"work_id":"4e6bcf2b-3361-434a-a6de-f5504b5083f6","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.756011Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:95aa7478a807de6e54a4ca79ec9bcec348ba698e3b0c914ad40fcbda653ef2a6","observation_id":"3ef54d7e-04c7-42d6-be44-1e21ca506a87","resolution":{"observed_at":"2026-08-10T14:24:36.790299Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-14T06:32:32.682623+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","latest_version":1,"primary_category":"cs.CE","snapshot_observed_at":"2026-08-10T14:17:16.439550Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs"},"reference_resolution":{"displayed":36,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":36},"total_outbound_references":36},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-14T06:32:32.682623+00:00","source":"crossref"},{"observed_at":"2026-08-14T06:32:18.44784+00:00","source":"retraction_watch"}],"thesis":"As of 15 August 2026, this Paper Citation Record lists 36 of 36 outbound references and 0 inbound Pith citation observations for arXiv:2501.15406."}