{"as_of":"2026-08-11T17:43:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:e113546a19345cd51dbef6cebd83f253e6136a76d14860f3853cbd3d92b65e63","coverage":[{"denominator":63,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":63,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-10T21:04:13.804824Z","state":"measured"},{"denominator":63,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":63,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-11T06:34:44.6726+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2502.00018/citation-record","integrity":"/paper/2502.00018/integrity","json":"/paper/2502.00018/citation-record.json","paper":"/paper/2502.00018"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1109/tas","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:15.454042Z","title":"A novel mathematical model for the flexible job-shop scheduling problem with limited automated guided vehicles,","venue":null,"work_id":"f0fc1169-cf77-42e8-91d8-1d881983e684","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.153355Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:e035ef3df7ebee7c0f053f5b6c19a7fccf8122658b59a46f3b55816739cf3d06","observation_id":"f91e9a5a-8dbe-4816-a434-feaf2a1f5383","resolution":{"observed_at":"2026-08-10T21:04:15.479407Z","resolver_source":"doi_truncated","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:22.864833Z","title":"Knowledge-based lot-splitting optimization method for flexible job shops considering energy consumption,","venue":null,"work_id":"b23dad8f-e20e-4518-ae62-eff2a4b49f2e","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.204759Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:58a66a5fe500dd4b27da3fea7933a6cc1a78720c185c9598b02217c24c360666","observation_id":"887cc61c-c6e6-4239-80f2-7dbe62a18acb","resolution":{"observed_at":"2026-08-10T21:04:22.904902Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:22.654751Z","title":"Multitask multiobjective genetic programming for automated scheduling heuristic learning in dy- namic flexible job-shop scheduling,","venue":null,"work_id":"371c053b-f572-4172-be96-8eaf2d76dcf5","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.254758Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:2de9ae4a05d568739f48713bc2f70877a4b98ef375a729190130a121a4ecc19d","observation_id":"57d5d924-3e91-4d42-9ab3-38d50f507b3a","resolution":{"observed_at":"2026-08-10T21:04:22.704748Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:22.544832Z","title":"Multiobjec- tive optimization of energy-efficient job-shop scheduling with dynamic reference point-based fuzzy relative entropy,","venue":null,"work_id":"84ae577a-088a-41c1-a3ed-8d830e7f244a","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.294752Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:425c63daeca7be3faa9f55dbfa01273cd97979655885228f592e7a73d6501dce","observation_id":"f5864ad8-b8b1-48d5-8b9a-583c10b1514b","resolution":{"observed_at":"2026-08-10T21:04:22.555635Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:11.344751Z","title":"Huang, S","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.344751Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:547034f1fe8f62ac7e5bc9576734e4ab3191d761c0b326438715fb3d96664ab8","observation_id":"79504d18-5ab9-4496-bcaf-fe26109713d3","resolution":{"observed_at":"2026-08-10T21:04:11.344751Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:22.394832Z","title":"Self-adaptive multi-objective evolutionary algorithm for flexible job shop scheduling with fuzzy processing time,","venue":null,"work_id":"f656e9c5-ca10-4da7-8698-a88c789c3700","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.387948Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:d91b9635042fc1a03c5adfaebc3ab8753f87d1fb8cd3593c10d9cce258719be0","observation_id":"ed8c5a67-3a3c-4847-95a7-ee4f212ee1cd","resolution":{"observed_at":"2026-08-10T21:04:22.431700Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:22.264741Z","title":"Bi-population balancing multi-objective algorithm for fuzzy flexible job shop with energy and transportation,","venue":null,"work_id":"91b5d431-4be8-4596-a2aa-6b8c2e79763a","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.434752Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:4899bdce2d3ddaa98728a880992518dc52000061e5a3d3f1b1c57224dddf51a5","observation_id":"0aeb4aa1-0ab5-47a4-9f24-3a2febb28cc2","resolution":{"observed_at":"2026-08-10T21:04:22.304748Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:11.485834Z","title":"A decomposition-based evolutionary algorithm with clustering and hierarchical estimation for multi-objective fuzzy flexible jobshop scheduling,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.485834Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:d5ce25a8e9a82701d32e108a325123d96dd7c523ba57ec6d31c9a9ba4fe06bcb","observation_id":"a6044fce-3a84-4c75-835a-aca6b3a00bc2","resolution":{"observed_at":"2026-08-10T21:04:11.485834Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:22.140582Z","title":"Solving fuzzy job-shop schedul- ing problem using DE algorithm improved by a selection mechanism,","venue":null,"work_id":"b7ddf8f3-8b29-4671-b612-65355cd918ab","year":2020},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.544763Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:3cd270412ed831a25121b21f7a073dd2fad718df1f64924c3f139187191c685b","observation_id":"fb26933f-9952-4aab-aaeb-5788d01f992c","resolution":{"observed_at":"2026-08-10T21:04:22.159794Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:21.984868Z","title":"Improved artificial immune system algorithm for type-2 fuzzy flexible job shop scheduling problem,","venue":null,"work_id":"edb29d12-084d-4176-b653-016c6536f62c","year":2021},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.594756Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:178c7ae47c001f4e62ce11c954fd7538feae7ff1570704efcb0b47472450c761","observation_id":"c8d3ddff-3ddc-4366-a882-9afa82a2270f","resolution":{"observed_at":"2026-08-10T21:04:22.035869Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:21.824830Z","title":"A hybrid cooperative coevolution algorithm for fuzzy flexible job shop scheduling,","venue":null,"work_id":"557cfa25-a6ad-4f8f-96eb-595a828df1f6","year":2019},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.644752Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:5d63de0c9afa77b84cfa894d8a9a5199a11f0bf92b0cbe8aae75029f7c550d98","observation_id":"87a35022-20b1-48e7-a995-83d5770192ec","resolution":{"observed_at":"2026-08-10T21:04:21.874747Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:21.654995Z","title":"Solving multiobjective fuzzy job-shop scheduling problem by a hybrid adaptive differential evolution algorithm,","venue":null,"work_id":"40cbe9e6-532c-4aab-9188-579a1cd02a8f","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.694754Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:394386783cd3cd079124a38a54c8d0330b44e63ee8311df7b3b4c3f2fe503f83","observation_id":"7c2aadac-a64b-4aa2-81f6-2ed30854acfa","resolution":{"observed_at":"2026-08-10T21:04:21.714940Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:21.474749Z","title":"A bi-population evolutionary algorithm with feedback for energy-efficient fuzzy flexible job shop scheduling,","venue":null,"work_id":"93de0991-ed22-4435-a964-9df625139624","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.754755Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:9926a5a71d5c9d64effa507e58a778443650e903cbf2b746c37d33f3022435dd","observation_id":"21030524-1f03-4380-9655-ac9a25e3a256","resolution":{"observed_at":"2026-08-10T21:04:21.516542Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:21.284752Z","title":"A learning-based memetic algorithm for energy-efficient flexible job-shop scheduling with type-2 fuzzy processing time,","venue":null,"work_id":"4ec5dcac-e63d-43e2-b6eb-5b764c8512e4","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.814753Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:9e11b960fd804b4a6b41982ff401cf3eee8778000a394babdbfd516e0e9f0013","observation_id":"eb2a1514-6d7e-4ab9-a6ea-884f1e1873e5","resolution":{"observed_at":"2026-08-10T21:04:21.354751Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:21.124750Z","title":"A hyperheuristic with Q-learning for the multiobjective energy-efficient distributed blocking flow shop scheduling problem,","venue":null,"work_id":"c0d5cf28-5a05-4e82-a946-3702541aba8e","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.864756Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:6675ef3be1bcb9425f3a6c1bc9c44f729294be4e68ce8f1436db1f4a14f8e242","observation_id":"c2d6ead1-3bed-4e46-8598-abc2f51c0284","resolution":{"observed_at":"2026-08-10T21:04:21.174755Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:20.954751Z","title":"A reinforcement-learning-based 3-D estimation of distribution algorithm for fuzzy distributed hybrid flow- shop scheduling considering on-time-delivery,","venue":null,"work_id":"1e77cb7a-58f2-488b-b1d6-863ad3cd484e","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.894763Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:b0f4fbedc1eee2826dbf9e64e082ac7d12d2be421d429e27fe289738a59c4057","observation_id":"ad18810b-e822-4828-9d25-3190c7e4c1e4","resolution":{"observed_at":"2026-08-10T21:04:21.004750Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:20.811441Z","title":"Co-evolution with deep reinforcement learning for energy-aware distributed heterogeneous flexible job shop scheduling,","venue":null,"work_id":"59c9bd13-0a17-4b8d-8cbd-6b77d69c9905","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.934772Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:c1818158f2857263a7084ed790d188c28e60bc555e4fe61bdac47f0963da6741","observation_id":"cce62992-1706-4560-972d-296631e0642f","resolution":{"observed_at":"2026-08-10T21:04:20.844749Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1109/tevc.202","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:13.904943Z","title":"MQL-MM: A meta-Q-learning- based multi-objective metaheuristic for energy-efficient distributed fuzzy hybrid blocking flow-shop scheduling problem,","venue":null,"work_id":"11347ca0-fa3d-4128-bfc7-890efd2989fd","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:11.984837Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:27f5dd58e6b7c5a97db52e707424f100cbe8fc1b44b42fb6e56776dce5b67929","observation_id":"99fc2dfe-5a9b-439d-91f5-69eee5c04c9f","resolution":{"observed_at":"2026-08-10T21:04:13.954753Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:20.695361Z","title":"A reinforcement learning driven cooperative meta-heuristic algorithm for energy-efficient distributed no- wait flow-shop scheduling with sequence-dependent setup time,","venue":null,"work_id":"34f3dede-2844-4333-9d99-b32036455629","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.044750Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:81d889ff320ed3b6bb91871a6112c26f769457f58472837cc61c1f7881291992","observation_id":"e501b1ba-8c43-40f3-b55b-7406f0a59327","resolution":{"observed_at":"2026-08-10T21:04:20.724849Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:20.525215Z","title":"A learning-based multipopulation evolutionary optimization for flexible job shop schedul- ing problem with finite transportation resources,","venue":null,"work_id":"da8e3a18-5b78-474b-bf10-cc458310f773","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.079853Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:ab48fa8fb6afd2f3fdfc60dc41ac5e6cb6b1e0ae8d2f1a7351feeefc63c061b0","observation_id":"989c84de-7638-4c40-b547-07f2345fb317","resolution":{"observed_at":"2026-08-10T21:04:20.564817Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:20.390809Z","title":"An improved artificial bee colony algorithm with q-learning for solving permutation flow-shop scheduling problems,","venue":null,"work_id":"18eff5fd-82dd-418d-acb5-56ee2d4d80f3","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.134905Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:1261864582344dd73c26da7322057a2996284321acf69e8041ab403372262817","observation_id":"76f1ba88-b1c2-4633-9539-59f1b2a125a5","resolution":{"observed_at":"2026-08-10T21:04:20.434757Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:20.214756Z","title":"Learning-based grey wolf optimizer for stochastic flexible job shop scheduling,","venue":null,"work_id":"a9d415f2-e5a6-4fe7-b195-4ea7fb650ba9","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.184778Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:2ab6d2b05957f0fbbafd5b18abc7daecdcb5ddef45afe92d33bc1e22c312a1c3","observation_id":"32f79484-6216-4355-8841-2adbfa7967cd","resolution":{"observed_at":"2026-08-10T21:04:20.265516Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:20.144757Z","title":"Learning to dispatch for job shop scheduling via deep reinforcement learning,","venue":null,"work_id":"7b0c01d1-5e42-44ee-acc0-e29ef88691f0","year":2020},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.234854Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:8f71dc735bb616242931e520bb05bd93463a372c1df6c7c5c0d7aa8fc51095e9","observation_id":"8cb224ff-2e8f-4ca8-90f4-565c59403a41","resolution":{"observed_at":"2026-08-10T21:04:20.160789Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.985339Z","title":"Fast approximations for job shop scheduling: A lagrangian dual deep learning method,","venue":null,"work_id":"c441c955-32e1-4007-9e9d-de73894674dd","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.262240Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:ec343656d4876a9998374370608b20fd8daa523c7f5a60b2ade09c6eadbad41b","observation_id":"5d46e2ce-ccab-4467-8ccd-6e644160d5b2","resolution":{"observed_at":"2026-08-10T21:04:20.044750Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2401.11849","last_updated":"2024-10-31T11:33:24Z","snapshot_observed_at":"2026-07-31T00:10:48.357368Z","submitted_at":"2024-01-22T11:08:36Z","title":"Self-Labeling the Job Shop Scheduling Problem","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2401.11849","snapshot_observed_at":"2026-08-10T21:04:12.294862Z","title":"Self-labeling the job shop scheduling problem,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.294862Z"},"links":{"cited_paper":"/paper/2401.11849","citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:2c2ba94c2442df37e36cdd992a8aad6d50eb7a52b1f38635445f88df357660df","observation_id":"46e9a2a0-1be3-4271-afb7-8d47a0d2440b","resolution":{"observed_at":"2026-08-10T21:04:12.294862Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.935953Z","title":"Flexible job shop scheduling via dual attention network-based reinforcement learning,","venue":null,"work_id":"959d8d88-ba60-4ba2-a701-e69410da7679","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.339114Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:1264d84876a69c6948f82ad6ffaadbfe0f87adc1aa7d810a81943d2294a95f1e","observation_id":"8a493c1e-a5ee-4027-99e4-48717e380b36","resolution":{"observed_at":"2026-08-10T21:04:19.954750Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.872347Z","title":"Deep reinforcement learning based optimization algorithm for permutation flow-shop scheduling,","venue":null,"work_id":"ab8a72c6-28f9-4c60-9142-0dde13b69d6b","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.375131Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:0732418ac820ba704f6daf6d0a68812acbeaa41b86a1741820ca2660c06de962","observation_id":"e29fa5f9-8f2d-4425-81ea-19ad5f8b2a25","resolution":{"observed_at":"2026-08-10T21:04:19.905010Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.744763Z","title":"An end-to-end reinforcement learning approach for job-shop scheduling problems based on constraint programming,","venue":null,"work_id":"0f49dfee-666a-4178-8606-a9395231469b","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.414752Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:a5e96c07b00212d479e9ed658de565eba9b2f196633083b49a584c99a6c053d2","observation_id":"acba2006-54a4-4e8a-a03c-29cd08ece902","resolution":{"observed_at":"2026-08-10T21:04:19.771797Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.599380Z","title":"Flexible job-shop scheduling via graph neural network and deep reinforcement learning,","venue":null,"work_id":"3bc71359-927b-409e-a7bb-ccc320c1d803","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.464824Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:c4cbd8fe0ed4d9895addce053d0aa353796973143212454496d5e21ce3c1b2c7","observation_id":"9f126584-2846-423c-9a26-d19a7ef61db6","resolution":{"observed_at":"2026-08-10T21:04:19.622683Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.481657Z","title":"Dynamic parallel machine scheduling with deep q-network,","venue":null,"work_id":"2d8f557e-33d0-418c-b78a-3ef1c46a4c5b","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.514753Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:47df93ece133914b2227b69bae2e64e7e0032bf53b096d3dba6f314c1569fad7","observation_id":"a9b2c037-8386-494b-9950-55720137ef79","resolution":{"observed_at":"2026-08-10T21:04:19.520535Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.350860Z","title":"A knowledge-guided end- to-end optimization framework based on reinforcement learning for flow shop scheduling,","venue":null,"work_id":"368e2cd3-aec6-47a5-81ba-68fa08b73f9f","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.554757Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:dc60671d1ec33fe4b088c7b4567ad2008ad5768e624c67f52a7a9b96ccbf6091","observation_id":"5758e1de-2eab-4588-93e5-bf2dfc7e47d0","resolution":{"observed_at":"2026-08-10T21:04:19.404759Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.229998Z","title":"A deep reinforcement learning framework based on an attention mechanism and disjunctive graph embedding for the job-shop scheduling problem,","venue":null,"work_id":"9cda2163-5399-42c7-901e-406c94c00470","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.589250Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:c468d59488235e060ec317931100abb28215e3ea486aabaeabd3fef3525de6e6","observation_id":"898fc448-7fb5-4f4b-b92e-9e2d15df090d","resolution":{"observed_at":"2026-08-10T21:04:19.264809Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:19.125547Z","title":"A reinforcement learning approach for flexible job shop scheduling problem with crane transportation and setup times,","venue":null,"work_id":"2e86f1fb-567b-40b0-ad45-d42fac8e5e2a","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.628162Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:b8a90fd8c69f6cd124e60fd3ab279909ef72f9b2598c0de2a8335954425673e2","observation_id":"8810361c-38de-41bb-b8b6-84b92b77e8a0","resolution":{"observed_at":"2026-08-10T21:04:19.154767Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:18.965012Z","title":"Large- scale dynamic scheduling for flexible job-shop with random arrivals of new jobs by hierarchical reinforcement learning,","venue":null,"work_id":"33d148de-7067-40f2-8ee9-5fc6b5e09b62","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.664827Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:f292c0e4b92315ed57494f5a06925f8adc977b5f525e94db2ffb28b3aeb9cb33","observation_id":"00881303-44cd-4c69-9040-5cb51d9c2fdc","resolution":{"observed_at":"2026-08-10T21:04:19.014752Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:18.750143Z","title":"Double dqn- based coevolution for green distributed heterogeneous hybrid flowshop scheduling with multiple priorities of jobs,","venue":null,"work_id":"bb5a6e9d-60c4-42aa-b251-e2ecd35ac85d","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.704751Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:9df24ed46bf423c176e06498ea45be1929c71e2f52770281e4eb326aeb60626b","observation_id":"42c1484e-7e3d-4bf5-b0ca-bb1e7a89472f","resolution":{"observed_at":"2026-08-10T21:04:18.784750Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:18.590686Z","title":"Integrating ma- chine learning and mathematical optimization for job shop scheduling,","venue":null,"work_id":"ef0168d6-c54b-4230-8d87-80747e0951a6","year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.752487Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:11ef82a3c7ec2a614b7f29ae66aafef6cb8633275f85c85234418154a521ad49","observation_id":"3c6db507-7637-41b9-89ad-58f6ae6d1bbd","resolution":{"observed_at":"2026-08-10T21:04:18.634787Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:18.444753Z","title":"Dynamic job-shop scheduling problems using graph neural network and deep reinforcement learning,","venue":null,"work_id":"27989ef4-5823-4556-a139-2a1bf10090ba","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.784080Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:65b610b7469711679a3359bab0f363a3936aed720b50b59c3dde2326b87416c1","observation_id":"17c591df-4426-41ea-87d4-6bf7b4fdd98b","resolution":{"observed_at":"2026-08-10T21:04:18.485624Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:18.294909Z","title":"Real-time scheduling for dynamic partial- no-wait multiobjective flexible job shop by deep reinforcement learning,","venue":null,"work_id":"79206e7b-582d-4771-a1a6-589446eba323","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.824750Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:c17b8ef617ab6148f017c0644f0214c5b204c49be06bd0c5a0eda4d8b03cf57a","observation_id":"2e44037e-6e77-4172-b7bb-4e08aa87cc7f","resolution":{"observed_at":"2026-08-10T21:04:18.356595Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:18.141842Z","title":"Optimal foraging algorithm that incorporates fuzzy relative entropy for solving many-objective permutation flow shop scheduling problems,","venue":null,"work_id":"3c813273-721a-4c11-b26b-f89e2842a8e9","year":2020},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.844874Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:c03362e44725006b7e627631438d38ac1e4d47f9fa6de064032844555fbd2ed9","observation_id":"05f8e51b-7664-4f7f-b7fe-5c36988f8026","resolution":{"observed_at":"2026-08-10T21:04:18.186889Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:17.994752Z","title":"Fuzzy job-shop scheduling based on ranking level (/spl lambda/, 1) interval-valued fuzzy numbers,","venue":null,"work_id":"912ff99c-b788-4dd4-b8f8-8f75d93a8c7d","year":2002},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.865675Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:d09742f02ba9c1073608bf4374c814f499851cb4e5e2a58b926e332596661c7b","observation_id":"6fafa413-4e7d-4ab5-b8dc-2076c7d58cc1","resolution":{"observed_at":"2026-08-10T21:04:18.037220Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:17.874749Z","title":"Jobshop scheduling with imprecise durations: a fuzzy approach,","venue":null,"work_id":"c58657f2-cd39-49b0-a357-d01e166ed954","year":1997},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.878682Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:c3b8174d7dd07fff5363807833b028648a66b83381846e7def6d1a347f17c03d","observation_id":"d32eb13b-7b70-4f52-a05b-e6f3a9456ca5","resolution":{"observed_at":"2026-08-10T21:04:17.900328Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:17.764753Z","title":null,"venue":null,"work_id":"fa618193-3b46-4750-8542-eb26de622dbb","year":2018},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.883094Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:9855047c1058d0f44fd8a6f830a00c8616f8f8ceff80abd2612b54c10bdbe49c","observation_id":"77659631-811a-4812-b0cb-8fb67fd7b965","resolution":{"observed_at":"2026-08-10T21:04:17.804951Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:17.575035Z","title":"Fuzzy job shop scheduling problem with availability con- straints,","venue":null,"work_id":"4766a68b-7a61-4122-982d-91025a2abe34","year":2010},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.891775Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:09df3756e4465a730ea60f80bce1cec2d115d04c7fc1ec1f769a3c8152fad285","observation_id":"437a7d3e-479d-4a15-be25-c280b6c7c21a","resolution":{"observed_at":"2026-08-10T21:04:17.624753Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:17.444753Z","title":"An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate,","venue":null,"work_id":"6f3dda25-497d-4fba-b6e4-ebfd431339db","year":1999},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.954754Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:e9ab96f07dd5ac06d2a07abd439002838cdf4cddcb16376e278f85fbbe40cc82","observation_id":"803b90bb-ae53-4780-9484-4fe8d7f1522a","resolution":{"observed_at":"2026-08-10T21:04:17.474851Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:17.304756Z","title":"The expected value of a fuzzy number,","venue":null,"work_id":"970ff2d9-ee89-401b-835c-b7501252fdac","year":1992},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:12.992114Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:cf85da099d84702ded162fc39d67d480277156cb379705a48402c0a0b28eb346","observation_id":"795c6a95-ac20-4e77-bdd9-a39f42851354","resolution":{"observed_at":"2026-08-10T21:04:17.335112Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:17.149801Z","title":"Co- evolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop,","venue":null,"work_id":"c3adb695-0896-4a5a-abf8-4cc1a3474b16","year":2015},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.030327Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:d231d160d2930481996ad2bc24f2342391d038ff370c7c678f3937c1c420c057","observation_id":"2796ce78-85dc-41be-aded-8d4f95db1ed2","resolution":{"observed_at":"2026-08-10T21:04:17.194836Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:17.032143Z","title":null,"venue":null,"work_id":"42d91705-c1c9-456d-8a84-e82e9c332363","year":2020},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.065694Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:f30d2aff90df6515c782fe65d1daf641b94a106f47ff8fe2080e6019601989c5","observation_id":"a8a6cb66-cc95-4b2f-89ec-978df6d5a7ad","resolution":{"observed_at":"2026-08-10T21:04:17.079251Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:16.913995Z","title":"Job shop scheduling by simulated annealing,","venue":null,"work_id":"a8ed0726-5b3d-4fa2-a380-961eec060044","year":1992},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.114759Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:9d1b9a4f09b6fa8f4147c21a3889ec9c7b3e493b79d0eb6023618c88ec49cfb8","observation_id":"4e286641-a02b-4191-8936-d25241e2aece","resolution":{"observed_at":"2026-08-10T21:04:16.961943Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2105.14491","last_updated":"2022-01-31T07:20:20Z","snapshot_observed_at":"2026-07-06T11:14:04.454155Z","submitted_at":"2021-05-30T10:17:58Z","title":"How Attentive are Graph Attention Networks?","version":3},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2105.14491","snapshot_observed_at":"2026-08-10T21:04:13.147735Z","title":"How attentive are graph attention networks?","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.147735Z"},"links":{"cited_paper":"/paper/2105.14491","citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:d5497cab4f33c50672e6bd1875bdd2886a72effae0918ef1e7ded33391814332","observation_id":"910ae732-1c2c-48f8-a243-15351c164750","resolution":{"observed_at":"2026-08-10T21:04:13.147735Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:13.184971Z","title":"Attention is all you need,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.184971Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:e315c67cebe9396fa521187f38bd7183b0d344a51fbfc1aec5ec770e1994bdef","observation_id":"783aec08-de28-4b59-b79d-75b1914697b0","resolution":{"observed_at":"2026-08-10T21:04:13.184971Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:13.234750Z","title":"Understanding the difficulty of training deep feedforward neural networks,","venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.234750Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:ff4c70c6c1fc5018197a278a01c2f790878a75893f8eaad75cf591a4fd48bbd9","observation_id":"a72a9c7a-aba8-453a-8c11-de4c6c345f3d","resolution":{"observed_at":"2026-08-10T21:04:13.234750Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:16.564889Z","title":"Maximum likelihood from incomplete data via the EM algorithm,","venue":null,"work_id":"0782a2fd-8082-4333-b518-dc2f8d514952","year":1977},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.272315Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:23203b716e6d65efef65d8b457eaa1d042c91368835b39c4d55814861e63cb66","observation_id":"ed14cc6a-3cc4-4cc0-823a-814d195c04ba","resolution":{"observed_at":"2026-08-10T21:04:16.596139Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:16.414935Z","title":"Many-objective evolutionary algorithm with reference point-based fuzzy correlation entropy for energy-efficient job shop scheduling with limited workers,","venue":null,"work_id":"61533900-64a8-4bd3-858c-7c20ac08e28a","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.324755Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:fde3c20b4ce1cd5eb6de49ca79e78b3b0a7e22342504b9bfe0839f73648985c5","observation_id":"83d0b546-0d6c-4da5-8a5f-e9b0734fdd7b","resolution":{"observed_at":"2026-08-10T21:04:16.454750Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:16.268579Z","title":"Fuzzy job-shop scheduling problems: A review,","venue":null,"work_id":"e45b564e-d02f-4152-8bd9-30e3c9135c50","year":2014},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.374756Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:4a27315e3e613b792017e84845c4570d8ef08e8f4d9021ab85fbdae20f5f2678","observation_id":"b99e2afa-27e5-4180-bc4a-c06665611f8b","resolution":{"observed_at":"2026-08-10T21:04:16.294891Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1412.6980","last_updated":"2017-01-30T01:27:54Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2014-12-22T13:54:29Z","title":"Adam: A Method for Stochastic Optimization","version":9},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1412.6980","snapshot_observed_at":"2026-08-10T21:04:13.414744Z","title":"Adam: A method for stochastic optimization,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.414744Z"},"links":{"cited_paper":"/paper/1412.6980","citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:e3a517d8f492690b153f412fb22cc83b293511847563d1192c6c48ef04d15486","observation_id":"6b7f4c20-49e7-4959-a1d3-4b8bc82b415a","resolution":{"observed_at":"2026-08-10T21:04:13.414744Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:13.464755Z","title":"Mitchell, An introduction to genetic algorithms","venue":null,"work_id":null,"year":1998},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.464755Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:3d38d9cdd60a40a4bf32404ff02a88439f718af7c83b6551ac0d121f4f5aed0b","observation_id":"c58f840d-69ec-4581-bacb-92e956a92906","resolution":{"observed_at":"2026-08-10T21:04:13.464755Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:13.514905Z","title":"Particle swarm optimization,","venue":null,"work_id":null,"year":1995},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.514905Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:5f27fdc8fbf7f7fb44920cfd11df2f34e2050ee131684daf4a1a5146488c02d0","observation_id":"3ef2ae40-b3c5-47d0-b148-1696b73a121e","resolution":{"observed_at":"2026-08-10T21:04:13.514905Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:13.574756Z","title":"Denoising diffusion probabilistic models,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.574756Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:cceb88583c233a5fb08a09f87c474aa2d7087b39ff9b90c2199ad61e051a410f","observation_id":"9e406efc-c324-4351-b078-f52bee4eda53","resolution":{"observed_at":"2026-08-10T21:04:13.574756Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:15.904751Z","title":"Generative adversarial nets,","venue":null,"work_id":"5534a7c8-aa80-46ea-9491-2ce0e4545fba","year":2014},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.614752Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:aeea4883e5725d89f9c1e37d620ff2eea55bba4523595b2244d7abf747efef9f","observation_id":"034cf543-b356-45ae-9b63-397def07bb9e","resolution":{"observed_at":"2026-08-10T21:04:15.949811Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1410.8516","last_updated":"2015-04-10T12:27:56Z","snapshot_observed_at":"2026-07-06T03:59:05.142685Z","submitted_at":"2014-10-30T19:44:20Z","title":"NICE: Non-linear Independent Components Estimation","version":6},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1410.8516","snapshot_observed_at":"2026-08-10T21:04:13.655689Z","title":"Nice: Non-linear independent components estimation,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.655689Z"},"links":{"cited_paper":"/paper/1410.8516","citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:41cef6d427a4b68777fc9cc131ee052f18f86a8e5c996fb4eaf74d9503a522a1","observation_id":"08cda87a-9169-4789-913c-a86ecdac691d","resolution":{"observed_at":"2026-08-10T21:04:13.655689Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:15.725137Z","title":"Permutation flow shop schedul- ing with multiple lines and demand plans using reinforcement learning,","venue":null,"work_id":"6f928f0e-b795-4e30-8369-aff2c54a9f57","year":2022},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.705500Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:61a93bbf67da75d576906b7850482d8b03918e644331cdc8887b4e77544fae58","observation_id":"1206cbf0-d4a1-41b3-aee5-dafb74c1a52e","resolution":{"observed_at":"2026-08-10T21:04:15.775953Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:13.754752Z","title":"A tree-based multiobjective evo- lutionary algorithm for energy-efficient hybrid flow-shop scheduling,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.754752Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:9fef4c075ca615cd7fc8559ced97543cd2da90df203d755ed94c5439b1ac7345","observation_id":"3a9b16df-80ac-4b74-ac73-528e0322d714","resolution":{"observed_at":"2026-08-10T21:04:13.754752Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T21:04:15.555867Z","title":"A biobjective optimization for integrated parallel machine scheduling and location problem: Mathe- matical model and iterative two-stage heuristic,","venue":null,"work_id":"e4404e95-521a-408a-802b-386be82e299e","year":2023},"citing_paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem","version":1},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-08-10T21:04:13.804824Z"},"links":{"citing_paper":"/paper/2502.00018"},"observation_digest":"sha256:be8b30c8cda02b146a13ebcc2e3e77a92b08e40e558d99c1b6dfa32370eb5c6b","observation_id":"fe8f4798-08f1-4340-ad31-6245393db32e","resolution":{"observed_at":"2026-08-10T21:04:15.595518Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2502.00018","last_updated":"2025-01-11T10:20:16Z","latest_version":1,"primary_category":"cs.AI","snapshot_observed_at":"2026-08-10T20:56:49.081847Z","submitted_at":"2025-01-11T10:20:16Z","title":"An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem"},"reference_resolution":{"displayed":63,"state_counts":{"malformed_identifier":1,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":14,"verified_exact":1,"verified_fuzzy":47},"total_outbound_references":63},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-11T06:34:44.6726+00:00","source":"crossref"},{"observed_at":"2026-08-11T06:34:36.301508+00:00","source":"retraction_watch"}],"thesis":"As of 11 August 2026, this Paper Citation Record lists 63 of 63 outbound references and 0 inbound Pith citation observations for arXiv:2502.00018."}