{"as_of":"2026-08-09T08:43:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:1fbec6e0db6badc80ded19ae5f2a35d1601f29269b17730cb6786f6ba67a2090","coverage":[{"denominator":34,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":34,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T13:48:01.198527Z","state":"measured"},{"denominator":34,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":34,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-09T06:31:02.800959+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2505.20952/citation-record","integrity":"/paper/2505.20952/integrity","json":"/paper/2505.20952/citation-record.json","paper":"/paper/2505.20952"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:08.609379Z","title":"Bepc ii: construction and commissioning,","venue":null,"work_id":"686e4036-7758-4562-b513-917ea61e3e97","year":2009},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:57.348743Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:5a294907bd07b3cc75378cf990103a4fdfe0a2e09ba37ded5dbcf13ef0ce6c79","observation_id":"82d697e3-ef9c-45e5-bbfc-80c1ff9ec8b5","resolution":{"observed_at":"2026-08-07T13:48:08.713222Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:08.380889Z","title":"Future Physics Programme of BESIII,","venue":null,"work_id":"b4003c03-9106-4455-a9b2-e61bb4818ccb","year":2020},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:57.498027Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:935dac8f3403f6628045dc2d9211122c44d165871d8b65ab87b56602260f6e72","observation_id":"20b405a3-2f21-41f9-823f-2d815cda72ce","resolution":{"observed_at":"2026-08-07T13:48:08.477818Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:08.176454Z","title":"Design and Construction of the BESIII Detector,","venue":null,"work_id":"0314c1f1-d959-4ded-9b72-fc231d7e1c7a","year":2010},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:57.622376Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:9a739387aea932b4357b9e10755ba85a8a0ea92a711da588f07784127a3e51b3","observation_id":"ae5133d5-793a-4ab3-b55a-8b6691c7888e","resolution":{"observed_at":"2026-08-07T13:48:08.281606Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:07.957209Z","title":"Precision measurement of the mass of theτlepton,","venue":null,"work_id":"f077d07c-82d1-4a4a-a58e-5050f62e2fcf","year":2014},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:57.756180Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:39a690cd5b049ea94752d5f6e42ac30578569537e832cde56e6f4909b0519d64","observation_id":"50c2025f-8f45-461f-bce9-82c19579f710","resolution":{"observed_at":"2026-08-07T13:48:08.062188Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:07.689814Z","title":"Measurement of thee +e−→π +π− cross section between 600 and 900 MeV using initial state radiation,","venue":null,"work_id":"f0d68971-6376-458d-b7b4-c9c513401d1a","year":2021},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:57.867348Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:ecba5aecd1e4644a272b6183e4117c53af7a0787d6399e4197a9c8cd08170deb","observation_id":"d885ae23-62a1-4e31-9e05-1cf806282e1c","resolution":{"observed_at":"2026-08-07T13:48:07.809854Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:07.435293Z","title":"Measurement of the cross section fore +e− → Hadrons at energies from 2.2324 to 3.6710 gev,","venue":null,"work_id":"4ad27aaf-74d3-484d-b009-c87f59ed86e1","year":2022},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:57.978204Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:b940dac1376c990ff0330da2da32e6ea1635f5643f6942d0368cf8e88d3c60e1","observation_id":"9e1759a8-c4d2-4526-afb8-e5e3ac6767ac","resolution":{"observed_at":"2026-08-07T13:48:07.598771Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:07.229287Z","title":"Observation of a Charged Charmoniumlike Struc- ture ine +e−→π +π−J/ψat √s=4.26 GeV,","venue":null,"work_id":"99b4a56b-419c-41ae-b91c-f4d02690cdd1","year":2013},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:58.091670Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:400dafebf28e114430fedc2b03baa43d548e7ce0159f2ddceb50d7aa30e16e8c","observation_id":"e348b7e1-4d43-4f17-a85a-d3f89c778111","resolution":{"observed_at":"2026-08-07T13:48:07.317131Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:07.045422Z","title":"Measurement of the Absolute Branching Fraction ofD + s →τ +ντ viaτ +→e +νe¯ντ,","venue":null,"work_id":"05b5d24f-3a02-402b-900a-92d16b87864d","year":2021},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:58.201627Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:669fec4f830d00d4ceb1f718610ea3f6903e612f90eec0a82c8a8dc08298e306","observation_id":"62bc2f09-c627-4ed3-8b61-6000592552ac","resolution":{"observed_at":"2026-08-07T13:48:07.136813Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:06.817365Z","title":"Observation of an Isoscalar Resonance with Exotic JPC=1-+ Quantum Numbers in J/ψ→γηη’,","venue":null,"work_id":"c876b02d-aefd-4acb-bde1-075450d9b0ee","year":2023},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:58.291000Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:25bfbff66ca8df2a7579a26c455f8341c447c851fc1a5bc3e19649fff092b765","observation_id":"6a1b71a0-8f98-4165-8075-1753114084f4","resolution":{"observed_at":"2026-08-07T13:48:06.933588Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:06.339161Z","title":"Erratum: Observation of an isoscalar res- onance with exoticJ PC = 1−+ quantum numbers inj/ψ→γηη ′ [phys. rev. lett. 129, 192002 (2022)],","venue":null,"work_id":"e5e5aa19-5008-4c43-92e3-fadb2e314d69","year":2022},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:58.391992Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:91e2d6af8cf647cee8ae1fd9eb039ce4b39085670cbc7d5531916cd2fac53614","observation_id":"7bb12a5f-2826-4a36-bd19-cea67ea6076b","resolution":{"observed_at":"2026-08-07T13:48:06.497992Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:06.149190Z","title":"Search for the decayD 0→π 0ν¯ν,","venue":null,"work_id":"af26c4d3-d35f-449a-a6b9-89959c980468","year":2022},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:58.506075Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:7de9b978a7eab861f1b71bcb831ce19fb42cb10ee557c73b2c5ce394baeeaf81","observation_id":"55b768d4-fc6d-4b96-95c3-3e6c977d9d54","resolution":{"observed_at":"2026-08-07T13:48:06.238394Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:05.875329Z","title":"The BESIII physics programme,","venue":null,"work_id":"5aa189c3-242f-4542-a70a-6f94e72e1208","year":2019},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:58.667562Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:edc153a9df0429b9e40d67343780cf03580bd6f90432a8004f9dca4bc8db60cf","observation_id":"5d553d8d-ff9f-46f7-a1cd-9bdb0f5f5c0d","resolution":{"observed_at":"2026-08-07T13:48:06.047517Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:05.675065Z","title":"Design and construction of the new BESIII endcap Time- of-Flight system with MRPC Technology,","venue":null,"work_id":"041e1c45-3000-4fa1-bb23-de390d935578","year":2020},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:58.804504Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:daea645d1f9f500794e77ee54daade2d92f5ecefa056c792829ddbc20a8c9500","observation_id":"33e8a667-3074-47b8-9bfd-249cfdb97244","resolution":{"observed_at":"2026-08-07T13:48:05.773344Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:05.401009Z","title":"Thin film field emission,","venue":null,"work_id":"7fd2dba0-86e2-42f6-a5a1-002017c205ac","year":1936},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:58.946091Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:f9a0f4cc047a38b86032d072c84faf621c5e4b4cd4fb990ee2c267b11f2c45d0","observation_id":"f01b4979-5b65-49df-859f-f481da74c8ec","resolution":{"observed_at":"2026-08-07T13:48:05.535924Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:05.182792Z","title":"Aging phenomenon in BESIII drift chamber,","venue":null,"work_id":"983ba722-8c09-4c94-ae82-92abe100afb0","year":2024},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:59.106948Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:8ff22085678cbe212d968311689b7f14e94e4532ee2b8c51455696b07a46fa3d","observation_id":"535396cb-b3b1-43d8-89db-095269d9651a","resolution":{"observed_at":"2026-08-07T13:48:05.273105Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:04.958669Z","title":"Gem: A new concept for electron amplification in gas detec- tors,","venue":null,"work_id":"8dd5419b-07ed-4379-8a27-8fa8038283f0","year":1997},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:59.219936Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:429850b9cf5785793e25f32c836aa4092454a738922abc375627f6fd2494da38","observation_id":"cf277a36-f380-40e6-b204-955eb5dc6101","resolution":{"observed_at":"2026-08-07T13:48:05.065540Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:04.791221Z","title":"The gas electron multiplier (GEM): Operating principles and applications,","venue":null,"work_id":"df8f9b94-adc5-4201-95a3-1ac3b7e23cb3","year":2016},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:59.348540Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:1fa38346ce956f8c7b66c614c5bd8104d77edc507702363e10d2f182ac718dd3","observation_id":"0541fadf-cfcd-4933-ba38-f9c39a7d62fc","resolution":{"observed_at":"2026-08-07T13:48:04.880253Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:04.601951Z","title":"GEM detector performance with innovative micro- TPC readout in high magnetic field,","venue":null,"work_id":"9ed8ccbc-1755-4e0b-8c08-cea71e9026ab","year":2018},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:59.477266Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:c468b720254d1d05fd85e3e94312bb05ff0f5c7042da63294e84d4299181e8b6","observation_id":"aae8be75-f0dc-4a18-a2d7-b23fbe0aeec7","resolution":{"observed_at":"2026-08-07T13:48:04.681166Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:04.391402Z","title":"Triple GEM performance in magnetic field,","venue":null,"work_id":"50561223-94e0-47d2-af64-47dfc82615d7","year":2019},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:59.583494Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:f51c591f1006144ee3eeacbb3eac1085670d00136989c8fea970622c677f8f25","observation_id":"7563144d-1972-4cb9-869a-93165584ed48","resolution":{"observed_at":"2026-08-07T13:48:04.489796Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:04.121758Z","title":"The CGEM-IT readout chain,","venue":null,"work_id":"53e7b1b0-4302-4cde-8252-6e55a5502d2e","year":2021},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:59.713422Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:a78c8b78a5043199a7185cffbd80ee1e536c3fe8561cc729a8abe99e924c8600","observation_id":"8eeab2d4-cc2d-40f9-ac2c-029d78b7009b","resolution":{"observed_at":"2026-08-07T13:48:04.251662Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:03.866795Z","title":"Cossio,A mixed-signal ASIC for time and charge measurements with GEM detectors","venue":null,"work_id":"fc72c1a5-086d-4a2c-9afd-05c1666954cc","year":2019},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:59.848008Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:ce323d8a1b79abd731aa36702d191152fbf52923682973dabfd8e809a9413c41","observation_id":"4a04e029-387f-4a1f-8c0b-ae00ffd4abbb","resolution":{"observed_at":"2026-08-07T13:48:03.955624Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:03.663900Z","title":"Tofpet 2: A high-performance circuit for pet time- of-flight,","venue":null,"work_id":"f2161afb-83ae-49ca-baa0-ab00001e1a54","year":2016},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T13:47:59.952244Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:b736694ea05f7ac365960bcbfff8b54a104571a47051d5cc99e7e889136d0e5a","observation_id":"476bd1cf-c3c7-4e79-b765-23fc97596a6d","resolution":{"observed_at":"2026-08-07T13:48:03.762553Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:03.437888Z","title":"A trigger system based on fast sampling adcs - implementation and tests,","venue":null,"work_id":"4e8041b6-9c04-4f2a-96d2-eaa1889a1aa9","year":2011},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.024639Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:5100ebcbfb8430cbb4fb25396a30d1907150a0940d1743c7a7d13baf6ed39e41","observation_id":"24f44920-57e5-4f3e-a46d-d6851bbe1cad","resolution":{"observed_at":"2026-08-07T13:48:03.527923Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:03.204222Z","title":"Technical Design Report of the Inner Tracker for the KLOE-2 experiment,","venue":null,"work_id":"6f1d54a0-768d-49ad-82f0-7d1a7bd7947a","year":2010},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.097918Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:66d3279fab61d7f4a5f4c0147bfbeedb71ee071e12614d88a61ebf2402f36bc6","observation_id":"f06a9c5c-3eaf-44ff-823b-1d1829014fd8","resolution":{"observed_at":"2026-08-07T13:48:03.326407Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:03.026876Z","title":"The KLOE-2 experiment at DAΦNE,","venue":null,"work_id":"c123d438-0232-4c67-a272-2678ad2afe62","year":2019},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.187046Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:defa4605df63328633f6782cb0d2a7ff4ebb7493edc5b8be7b97687f3bdc4a3d","observation_id":"a2c7da4d-58f2-472b-b1f1-c7b207c244bb","resolution":{"observed_at":"2026-08-07T13:48:03.103087Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:02.800310Z","title":"Aging of gaseous detectors: Assembly materials and pro- cedures,","venue":null,"work_id":"fd7c4e5c-1870-48b8-88ac-b8007df33783","year":2002},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.265432Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:f75275320c4209aba033a10957a9063477522a73f4162d4574353c12aa1e35cb","observation_id":"cdc4004c-410d-41de-9fbe-eff843492623","resolution":{"observed_at":"2026-08-07T13:48:02.906814Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:02.621792Z","title":"Gramigna,A Cylindrical GEM Inner Tracker for the BESIII Ex- periment: from Construction to Electronic Noise Studies","venue":null,"work_id":"ea86c108-efc3-4263-802e-61cff943534f","year":2022},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.426750Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:d6599b3ee46dd65734894544ba9d40bad22ed7c67367853160df736dc6e91617","observation_id":"9f26652b-23db-4b07-b796-eba8c527bef8","resolution":{"observed_at":"2026-08-07T13:48:02.709553Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:02.386968Z","title":"The CGEM-IT: An Upgrade for the BESIII Experiment,","venue":null,"work_id":"c71de051-4ce2-4b15-8fbb-73ebcfb386cb","year":2022},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.513796Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:3f1525a83e2566bdb6bf1ab3e41b3ac9805eca9351811c29985adb869ad72989","observation_id":"0e777d83-a1c2-4e0c-83d5-693a1275b929","resolution":{"observed_at":"2026-08-07T13:48:02.493306Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:02.222257Z","title":"Construction and assembly of the CGEM-IT innermost layer,","venue":null,"work_id":"88583486-97f4-4f36-bc98-1523afbc7d9d","year":2022},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.629070Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:1aea04c29204b6b433296104a9a0a6d5ce9ddddcea0308bf891cbd1a781b695e","observation_id":"14c871d3-fe3e-4e3a-b913-1ccb5e4bc53e","resolution":{"observed_at":"2026-08-07T13:48:02.307281Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:02.047140Z","title":"De Oliveira","venue":null,"work_id":"22c6cd78-2d48-4fe0-967e-1e0d2dc29525","year":null},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.801316Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:befb31f29910f92823b42a82c48fac5676c14f6339e2b062208f0ad02bd2702b","observation_id":"855d2a3b-01c5-4252-956f-5b9d7b403453","resolution":{"observed_at":"2026-08-07T13:48:02.124649Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:01.838523Z","title":null,"venue":null,"work_id":"50c1bb8b-30be-4d78-aa88-a07ae2896ad8","year":2023},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.884127Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:2054a93a39969c763648ec52cf8250679e614b529c6ba9ee468fc936871d52f1","observation_id":"4368d7e8-04fa-4bc0-b6ae-6fef7f9fb026","resolution":{"observed_at":"2026-08-07T13:48:01.945131Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:01.636578Z","title":"Bortone,Deployment of the readout electronics for the BESIII Cylin- drical GEM Inner Tracker","venue":null,"work_id":"c57e93fb-dc48-4c62-af29-86ce00ffbdbf","year":2021},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:00.984468Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:623943c3dd26030ca3a912a5ef3bd66797b191ae5cadaee0f8324608ab163c6b","observation_id":"ced17829-9d96-4a2a-a699-6ff1f2666d16","resolution":{"observed_at":"2026-08-07T13:48:01.729048Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:01.461165Z","title":"Grafana’s website","venue":null,"work_id":"1a007c35-933f-49a4-bc14-adce7feb0fec","year":2022},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:01.129361Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:a1f4fa4dcd2bc9576d38b8cd8a75b7b9af0583677387184453b062f97a2f1382","observation_id":"feec5592-a0a6-4b5f-b4d5-3bc922ccbc42","resolution":{"observed_at":"2026-08-07T13:48:01.543748Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:48:01.311878Z","title":"Commissioning of the Cylindrical GEM Inner Tracker for the BESIII experiment,","venue":null,"work_id":"52ee6a49-9081-4459-9741-02d3b7d1ad5f","year":2024},"citing_paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-07T13:48:01.198527Z"},"links":{"citing_paper":"/paper/2505.20952"},"observation_digest":"sha256:0ea2c28e4e33fd1ba596029e9f5a0f248c82f2df83684b121dbe5ca739a5ebdf","observation_id":"5242d975-415d-41d6-8c70-a4f424b7b45a","resolution":{"observed_at":"2026-08-07T13:48:01.355240Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-09T06:31:02.800959+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2505.20952","last_updated":"2025-05-27T09:49:30Z","latest_version":1,"primary_category":"hep-ex","snapshot_observed_at":"2026-08-07T13:40:39.074672Z","submitted_at":"2025-05-27T09:49:30Z","title":"Construction, Commissioning, and Installation of the Cylindrical GEM Inner Tracker of the BESIII Experiment"},"reference_resolution":{"displayed":34,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":1,"verified_exact":0,"verified_fuzzy":33},"total_outbound_references":34},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-09T06:31:02.800959+00:00","source":"crossref"},{"observed_at":"2026-08-09T06:30:57.326959+00:00","source":"retraction_watch"}],"thesis":"As of 9 August 2026, this Paper Citation Record lists 34 of 34 outbound references and 0 inbound Pith citation observations for arXiv:2505.20952."}