{"as_of":"2026-08-08T17:56:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:f78b77a6829d89bdf4d4e0377f5053d0297c807e08bf88ec2a4de1370b84e983","coverage":[{"denominator":13,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":13,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T13:30:21.244892Z","state":"measured"},{"denominator":13,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":13,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2505.21648/citation-record","integrity":"/paper/2505.21648/integrity","json":"/paper/2505.21648/citation-record.json","paper":"/paper/2505.21648"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:23.779947Z","title":"Transport and climate change: a review,","venue":null,"work_id":"f6a682ab-4858-45fc-937d-c3d778e16fd1","year":2007},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:19.770203Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:c6f9cf71f3cae66fff7997a0c88de74b89e350d208f522d4a1261372d76e2b60","observation_id":"e5419745-7bb6-4bf0-866c-478a4e40490d","resolution":{"observed_at":"2026-08-07T13:30:23.844797Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:23.624746Z","title":"A comprehensive review on developments in electric vehicle charging station infrastructure and present scenario of india,","venue":null,"work_id":"c9703cf1-309a-424e-91e6-1169a1554c9c","year":2021},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:19.861881Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:92110477d99054285267a52fb22271c7c04ec61de73bead1443f8a0969336a7b","observation_id":"181759da-dd24-4d0b-b079-8dea2fab18f8","resolution":{"observed_at":"2026-08-07T13:30:23.721495Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:23.354889Z","title":"Charging ahead: Breakthroughs in electric vehicle battery enhancement,","venue":null,"work_id":"a8e5bc32-bbde-4991-ab3e-9a0638ebe762","year":2024},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:20.014767Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:8edd61039f140e3ab45876d60a2fbbc7a3886579de4e866d3ed55a7198da6242","observation_id":"f32646fb-4918-4329-b525-0b4da9b711bb","resolution":{"observed_at":"2026-08-07T13:30:23.460159Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:23.163625Z","title":"Fast charging vs. slow charging: Pros and cons for the new age of electric vehicles,","venue":null,"work_id":"87f6e5cb-b0d8-4477-8a5b-e06f5ff4a074","year":2009},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:20.092752Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:16d6d9af37883a0cb4c384379ca512041f5452eee5dac0fa270af71f38189143","observation_id":"b1a935c4-5289-422b-9373-10b64b54d845","resolution":{"observed_at":"2026-08-07T13:30:23.216936Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:22.900293Z","title":"Current state-of-the-art of ev chargers,","venue":null,"work_id":"40090d10-64cd-4994-b299-d2906bc3348a","year":2015},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:20.229525Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:01f8e4969917f7608218707c35ac84180ee2370e1c5c6134561e64dd3f709b10","observation_id":"9d6e4ae7-4505-46cb-993b-2f537df12b57","resolution":{"observed_at":"2026-08-07T13:30:23.028849Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:20.366324Z","title":"Grid impact of electric vehicle fast charging stations: Trends, standards, issues and mitigation measures-an overview,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:20.366324Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:872d22a03d4afb575f46ca1ff8e54f049203c2a324849b8e772f631652c1bb57","observation_id":"5e02efa1-f41c-43f2-9d29-12ce428b1570","resolution":{"observed_at":"2026-08-07T13:30:20.366324Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:22.682833Z","title":"Renewable energy generation from livestock waste for a sus- tainable circular economy in bangladesh,","venue":null,"work_id":"4628b2df-aa94-4719-b390-7c881f900852","year":2021},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:20.494857Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:29a46fe905ca6bdaf06386ff5d071cf999d5f307e2884baa09fedc33a3e331e5","observation_id":"8e809eaa-261c-4c26-a647-8cd205ae5746","resolution":{"observed_at":"2026-08-07T13:30:22.746194Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:22.452396Z","title":"Feasibility assessment & design of hybrid renewable energy based electric vehicle charging station in bangladesh,","venue":null,"work_id":"3a2354ba-7e60-4e5f-8166-52c69c773ffb","year":2018},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:20.624912Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:a10153eb43a452b64c31051640e1b5ab0b9d9c8ba9e3d97a90d487406a2ea271","observation_id":"0dfa3550-4086-4049-9d8b-52597e64947d","resolution":{"observed_at":"2026-08-07T13:30:22.562221Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:22.286892Z","title":"Bmw ix3 (2021-2024) price and specifications - ev database","venue":null,"work_id":"ff7ce61c-960d-4c1b-80ab-7a610deb8536","year":2021},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:20.833872Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:325aea44c80364ff057211b90f6b4422764d4b67f96674873d48d41c785ce6f9","observation_id":"7e26e14f-914d-41cc-a80f-f53ddeb3e8de","resolution":{"observed_at":"2026-08-07T13:30:22.356140Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:22.063376Z","title":"Ford mustang mach-e er rwd (2023-2024) price and specifications - ev database","venue":null,"work_id":"48906096-f16a-4c6d-b771-29a6bce1d80b","year":2023},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:20.944051Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:79268b6fc2fce927247bc83a6a3646f2169f1d921d2dc4a1aba9ae391ca751f7","observation_id":"85c73fd0-0c0f-460a-a6ad-3dc841270d36","resolution":{"observed_at":"2026-08-07T13:30:22.147966Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:21.799528Z","title":"Tesla model 3 (2023-2024) price and specifications - ev database","venue":null,"work_id":"fc76f477-fce1-4682-ba46-e8ab4d751e25","year":2023},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:21.011233Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:55da2e5b50bfd9e5ec71294917457244c62941df0a3eb79b45159d9036d19e0f","observation_id":"81cf7bac-1e2e-40a0-b22d-ba4852f0b334","resolution":{"observed_at":"2026-08-07T13:30:21.931156Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:21.614743Z","title":"Tesla model y long range dual motor (2022-2024) price and speci- fications - ev database","venue":null,"work_id":"4f4604fe-cb6c-4d4e-987d-8822e47a59f9","year":2022},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:21.150101Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:ab9b7b6f11f861ee70b4e575628eb29a4355b2a4deb32021c03cd763e7dbc356","observation_id":"b37f1c47-f4f7-474f-b364-ea2b2becf7f9","resolution":{"observed_at":"2026-08-07T13:30:21.695484Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:30:21.401824Z","title":"V olkswagen id.4 pro (2023-2024) price and specifications - ev database","venue":null,"work_id":"87876f1d-8e88-4092-ade9-8eb7b1cd6c47","year":2023},"citing_paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T13:30:21.244892Z"},"links":{"citing_paper":"/paper/2505.21648"},"observation_digest":"sha256:daf8090485c78922257304827d4fed078f079ce85e7410042a068920ee3cbccc","observation_id":"e86888cf-a66c-43b9-a40e-074e6f2807fd","resolution":{"observed_at":"2026-08-07T13:30:21.482224Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2505.21648","last_updated":"2025-05-27T18:21:55Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-07T13:23:32.134615Z","submitted_at":"2025-05-27T18:21:55Z","title":"Design and Analysis of a Grid-connected DC Fast Charging Station for Dhaka-Chittagong Highway"},"reference_resolution":{"displayed":13,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":1,"verified_exact":0,"verified_fuzzy":12},"total_outbound_references":13},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 13 of 13 outbound references and 0 inbound Pith citation observations for arXiv:2505.21648."}