{"as_of":"2026-08-16T08:16:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:1007b8aac6dd59d35a711ede658b2f5c36d746376e40ebe8e0f77218b0aedf12","coverage":[{"denominator":86,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":86,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T13:21:45.572027Z","state":"measured"},{"denominator":86,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":86,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-16T06:30:59.297886+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2505.22124/citation-record","integrity":"/paper/2505.22124/integrity","json":"/paper/2505.22124/citation-record.json","paper":"/paper/2505.22124"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:38.008169Z","title":"Initially, a long-term staffing and scheduling plan is made, represented by the blue node in Figure 2, followed by a sequence of adjustments","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.008169Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:1f7da68774a08b9df5edad0249665120e34cade0e891ebd2f73ba65a9f6c7833","observation_id":"818023b1-ff6e-4660-b872-78c516008183","resolution":{"observed_at":"2026-08-07T13:21:38.008169Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:38.061002Z","title":"Now we introduce uncertainty realizations and scenar- ios of this problem","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.061002Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:46c063cdfa92a2ca3ddbeee0498915203b82b10a59ff9f96b4a748e68e7eca91","observation_id":"5e8b25ae-7920-4c4e-93ba-af509fd6c138","resolution":{"observed_at":"2026-08-07T13:21:38.061002Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:38.152367Z","title":"We assume the overall scenario tree can be estimated","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.152367Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:c0972e33bec5e4dc0806297d0dd3a5faabc08836bdd92a6d0af763e9d385b18b","observation_id":"ec937e31-ef2c-4747-a592-357cd1909825","resolution":{"observed_at":"2026-08-07T13:21:38.152367Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:38.237805Z","title":null,"venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.237805Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:51cc0e547946d7c29adf03a59e7efb6d6ac31f78b60da358fe18dc2441efe879","observation_id":"d73a3e66-fc1c-498a-9cb4-f126a033c147","resolution":{"observed_at":"2026-08-07T13:21:38.237805Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:38.346323Z","title":null,"venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.346323Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:1d30613ccb875194e2d4363b003bb46851804d6d57ea2976007f2fd5a06d82b2","observation_id":"48c4aaa9-db43-4790-9c07-a345c0aebb9b","resolution":{"observed_at":"2026-08-07T13:21:38.346323Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:38.470508Z","title":"GFN is particularly good at sampling compositional, discrete objects like graphs or sets","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.470508Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:9f2be62bd71b51b2e01a3458050594474c4783e64bdda56c530772446b59031d","observation_id":"3dfcb8af-fd86-48fd-9717-37a3118f9dcd","resolution":{"observed_at":"2026-08-07T13:21:38.470508Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:02.282790Z","title":"First, the notation of consistent flow is intro- duced","venue":null,"work_id":"300e66e0-2d4d-4c2b-a264-034f51f5c07b","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.567153Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:8ee9b596e97edf9e8821901201354f8253064389d696ad1fd99d843431493f97","observation_id":"c34aaea9-2fd8-42bb-8e8a-44ebad602781","resolution":{"observed_at":"2026-08-07T13:22:02.363693Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:02.131148Z","title":"This approach has two main features","venue":null,"work_id":"eda5e7db-7a0c-497a-8bad-006bd97c2bde","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.640291Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:6a199f9f90a2155367df227ecb8003e8740c54c70362b14e239efd6f7da00dba","observation_id":"40ab0697-28d1-4953-a3ef-1f65983b36f4","resolution":{"observed_at":"2026-08-07T13:22:02.206699Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:01.870556Z","title":"The deterministic D1 solution is utilized as an initial solution and several ad- justments are made to it","venue":null,"work_id":"f327471d-d500-4f2a-9d41-19b8b2a3e61a","year":2002},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.725224Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:c4e194b06b9ad4e51084be6354fc61f03bc07a28a823d46e3a2f284bd06125a7","observation_id":"5a481c6a-74ed-485a-b2aa-49ac1d8d1bda","resolution":{"observed_at":"2026-08-07T13:22:01.987763Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:01.723397Z","title":"Halter, O","venue":null,"work_id":"7336e7a5-5dfc-482e-ac4d-fe31803d9e03","year":2017},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.792880Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:e4d766e1128ddb33e99f967523639cae11f8191097290d36d0a4f7f927424936","observation_id":"beea4ad1-7861-4b46-9e54-6bd25c102ce6","resolution":{"observed_at":"2026-08-07T13:22:01.798531Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:01.506737Z","title":null,"venue":null,"work_id":"4b278237-678d-4418-afb5-cfdc41f5a892","year":2021},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.891590Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:137edae161774541549d5874ecad917ebb7780317c06d8d29e8fef16c7555035","observation_id":"d20a073a-0983-40cf-821d-d6f0fbcdb99a","resolution":{"observed_at":"2026-08-07T13:22:01.627304Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:01.324991Z","title":"Breugem, T","venue":null,"work_id":"610ea8e0-f9f0-4e1b-9a5b-22481eecc11f","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:38.966180Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:ca615bb5c6b891191630d8b27c56f2573919388aa3acdff0a52a92ecf4b3fc2c","observation_id":"aa8435eb-842f-483b-acf2-194561eefc0a","resolution":{"observed_at":"2026-08-07T13:22:01.411540Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:01.098542Z","title":"Ceschia, N","venue":null,"work_id":"42dbf318-7862-47d0-bf7a-ae0c9ef36eea","year":2019},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.079026Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:a0d3115d77c65cd849308d153c6499ae46f5a0c75620bfbf50a608c33c4286da","observation_id":"74433f8c-e0bc-4af4-80e1-48e2c25161e7","resolution":{"observed_at":"2026-08-07T13:22:01.211866Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:00.825111Z","title":null,"venue":null,"work_id":"cf6913f2-a5c9-4dc3-ab8b-b681e1e12251","year":1976},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.225049Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:ee9701ec37341aa58222a72c9138bbfac3417d7f543529f2279fa94ebdf9ce6b","observation_id":"f646c649-1bb4-4a90-a567-8c5a87d31c9b","resolution":{"observed_at":"2026-08-07T13:22:00.941435Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:00.592024Z","title":null,"venue":null,"work_id":"937c0fba-c550-4dad-8dc8-031c0aa6cc8c","year":1976},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.344527Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:f143559c95913dd0dee6170833e4a7542cdf9cd173833e9954df5e8941a8000b","observation_id":"15ac26f5-1cc1-4700-a04c-09e6d6b666df","resolution":{"observed_at":"2026-08-07T13:22:00.668659Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:00.385260Z","title":"Aickelin and K","venue":null,"work_id":"e2900699-0dec-4b1f-960e-a41350003d8a","year":2004},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.420277Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:954bf0b28294fffb18631d34a131e8130d066b4b25c8739b2f6373e4e2509ea9","observation_id":"8cea02e1-d625-47c8-b888-779b73462aaf","resolution":{"observed_at":"2026-08-07T13:22:00.472933Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:22:00.203320Z","title":"Kim and S","venue":null,"work_id":"c23a3f72-1f0e-4c0a-aa66-e9f1a0768359","year":2015},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.513762Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:685be62efaf2547fca9ec7a7dec10b911c6faf46ad14dd1ce09adea2f4ca24b7","observation_id":"a5570d72-5bad-4127-a68b-f0d07a2534d2","resolution":{"observed_at":"2026-08-07T13:22:00.282104Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:59.986996Z","title":null,"venue":null,"work_id":"f223a72f-faaf-43dc-a35a-25a99d7f6045","year":2011},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.601313Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:f49b41d10abe9540cfa18896815b157e67c68e276516041e4add48deaf008900","observation_id":"1f6fe155-b78a-49af-b251-bddd77dd5448","resolution":{"observed_at":"2026-08-07T13:22:00.081856Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:59.834274Z","title":"Bengio, M","venue":null,"work_id":"3ec1ee43-7d0e-4628-83f5-93b0e2b9eccf","year":2021},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.682759Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:373a9c6b4a531cf56db4b77b7e310325462f7f00af14d3a10f5ec8d14fb51ce7","observation_id":"b94bc8b8-af69-4bb4-826e-0d24148da3f9","resolution":{"observed_at":"2026-08-07T13:21:59.898281Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:59.619340Z","title":"Bengio, S","venue":null,"work_id":"1ec55c8a-f17c-48c4-8ae4-fc806c328c68","year":2021},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.767212Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:77ca4e5988c91e09216ca50d79d392ee1d77896f0ed129361cadb98c3bb0a303","observation_id":"0a7069d7-ea48-4019-b0fc-c3637cee1fea","resolution":{"observed_at":"2026-08-07T13:21:59.721793Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:59.429717Z","title":null,"venue":null,"work_id":"92f06c50-acbf-40f9-af64-0441f3903ec1","year":2024},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.842220Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:f7ad8cb611bd6c5cd12f325f18bd246e05d897106dcc6ebe2f65273f14c6a390","observation_id":"e5f8a372-9f2f-4ee5-b9a5-111e24b822c9","resolution":{"observed_at":"2026-08-07T13:21:59.520447Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:59.248702Z","title":null,"venue":null,"work_id":"e34d604b-9d0a-4e58-8c71-887e977f7390","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.914740Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:7badcaaf1e43202c78528440a8b6c7dbe551fcdb28d7dacd0a74722905bbc787","observation_id":"7ebd84f9-9d7b-4511-9de6-227b9cda2aa3","resolution":{"observed_at":"2026-08-07T13:21:59.319625Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:39.981841Z","title":"Otero-Caicedo, C","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:39.981841Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:ce8fc974f040c26ef92802166242f94d7810a92c241b86614d30c8e5cebde06a","observation_id":"78a233bd-1cf4-4d41-8a4c-c91b7175232c","resolution":{"observed_at":"2026-08-07T13:21:39.981841Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:59.040601Z","title":"Schoenfelder, K","venue":null,"work_id":"301ed2d9-57eb-46d3-b6ee-926b46fdfdc7","year":2020},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.094906Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:342ffbeedc891014d817c18b5a5c1c1ab3035dcc5c9f6aaf2b850224103351de","observation_id":"43219ee2-b5f3-42a9-813c-acc483449fca","resolution":{"observed_at":"2026-08-07T13:21:59.139805Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:58.793055Z","title":"Legrain, J","venue":null,"work_id":"693abd08-8a5b-4689-9053-066b86a3886e","year":2020},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.201177Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:bab4df22a8e6136911ed0adc067da95ecf10d29b04e6eb032d00effbb84874ac","observation_id":"539f98fc-a1eb-490e-ad46-c8c5478c409f","resolution":{"observed_at":"2026-08-07T13:21:58.901732Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:58.650879Z","title":"Maenhout and M","venue":null,"work_id":"56843c2d-1dd5-403f-b645-9c813d7e061d","year":2013},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.286861Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:2ca80bcfaa62a060adbdb10c7dc4932118986f62b3fec3827119173e4aea72ea","observation_id":"c2713196-746c-4ecb-a66d-05d40afc73fa","resolution":{"observed_at":"2026-08-07T13:21:58.698820Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:58.435119Z","title":null,"venue":null,"work_id":"e5bd4ea3-086a-4845-9ff3-6378d292a0a8","year":2005},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.381461Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:dd18b313ec5524b1064bac32bd8643dea59dd13408e6a13a3e57874926e10a18","observation_id":"0855cd5c-8e46-4a58-a53f-92ef72763fb6","resolution":{"observed_at":"2026-08-07T13:21:58.544814Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:58.214632Z","title":null,"venue":null,"work_id":"88776e34-a70c-4de7-b3aa-d58edf0b4427","year":2007},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.462535Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:f6dae95ff5ac7fa643169fa9942960cfa912e9e2dd91f612b96ea348428460fb","observation_id":"68d6ff71-9435-4201-93c3-4de08fc0fbcd","resolution":{"observed_at":"2026-08-07T13:21:58.298813Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2021.10559","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:46.820721Z","title":"Guo and J","venue":null,"work_id":"ab00d86e-92d1-4bf9-8cc2-1a25fece714f","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.577515Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:aae6b8874778b586de0b1fe74c78d0edb1f8089ba1994007968cf262182ee43c","observation_id":"2ebb66b8-431b-4327-9868-e61eef75bb86","resolution":{"observed_at":"2026-08-07T13:21:46.916703Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2021.10522","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:46.595580Z","title":"Kheiri, A","venue":null,"work_id":"101e4068-99ea-465e-ac5a-12c9af8df1db","year":2021},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.613678Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:75fb694ae2da4f66531fb214b23929d963cb4852619878747c24a1a26ce69730","observation_id":"40637554-7348-4821-9103-fa26869b10fa","resolution":{"observed_at":"2026-08-07T13:21:46.693129Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2022.10843","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:46.304719Z","title":null,"venue":null,"work_id":"d59b1f9e-d292-43be-b53d-64471bdfbfa0","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.707837Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:1a2c0cef3427d4d98310c70dd676390eb4fe642eb025349bd2845e5e61881b21","observation_id":"4a3a001c-d6d6-4800-ab54-da3b5b0376e5","resolution":{"observed_at":"2026-08-07T13:21:46.385707Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:57.923860Z","title":null,"venue":null,"work_id":"6d10653d-2f89-4f7b-98e6-4352eb567468","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.793663Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:37c183dd87d982fe2f16bd9c7fc930df884fc33e63e250b82d45e83714f7e064","observation_id":"817bf850-69fa-4227-be81-250ecd200f0a","resolution":{"observed_at":"2026-08-07T13:21:58.027391Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:57.683702Z","title":null,"venue":null,"work_id":"271af6dc-1f9a-481a-aa39-03676a605c55","year":2021},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.841509Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:a958f921487385981f5894f6f23b42a3d8828a3674eaa4dbe2f747ac973df159","observation_id":"3fdf2c97-4800-413b-858b-34851db8c537","resolution":{"observed_at":"2026-08-07T13:21:57.801820Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2302.05446","last_updated":"2023-02-14T10:19:50Z","snapshot_observed_at":"2026-08-13T13:02:59.423476Z","submitted_at":"2023-01-17T18:59:15Z","title":"Robust Scheduling with GFlowNets","version":2},"cited_work":{"arxiv_id":"2302.05446","doi":null,"metadata_source":"pith","pith_arxiv_id":"2302.05446","snapshot_observed_at":"2026-08-07T13:21:45.980480Z","title":"Robust Scheduling with GFlowNets","venue":"cs.AI","work_id":"2e33f437-747c-4e87-81ce-d86e015c2972","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.888996Z"},"links":{"cited_paper":"/paper/2302.05446","citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:9aaa33b6f0f9bb93b4e8890a68c5118de8edd4e9b31aee5af491c50e16b22da6","observation_id":"1f1e36c9-366b-4a34-94d0-f83d72f67262","resolution":{"observed_at":"2026-08-07T13:21:46.063845Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:57.495780Z","title":"Zhang, W","venue":null,"work_id":"e30103ff-41ce-42dd-b6d1-bfc0ea85b8ef","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:40.969583Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:64aa4e0ae233f8867cd5d189fa470817f88c2f311323e22e8d7f8d373e3d4c3c","observation_id":"b29a13b5-baec-4a41-b830-9c85da2036a1","resolution":{"observed_at":"2026-08-07T13:21:57.568162Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:57.331272Z","title":null,"venue":null,"work_id":"d42e1411-d595-45f6-bcba-c55fefb9da0b","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.102288Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:3ba466f83ce575653295cfd766a1c302f25d2e9241cdc38a0aae4b3d605d48a8","observation_id":"ff238351-1771-4e80-a68a-23165fc6a46f","resolution":{"observed_at":"2026-08-07T13:21:57.401688Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:57.183879Z","title":null,"venue":null,"work_id":"3da4daea-63bb-4ac2-9ece-9645118ee6ff","year":2020},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.169861Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:0f8979f2fcee2272e8bdbcd8c9423843c344b1b5307d18bfc64b348dc432c1c6","observation_id":"0c67a7eb-33f8-4dcf-ae59-5a6768f5a9cf","resolution":{"observed_at":"2026-08-07T13:21:57.244824Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:57.035792Z","title":"Bengio, S","venue":null,"work_id":"2e2f7bb6-18dc-4e75-b7d1-da02953cd64d","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.211587Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:62c4bc52f59a38e980f5ebd559d18b7d4d20cf7ba769a1d4224a6fd332b0bf66","observation_id":"e21c4662-6b5e-470d-9098-0389ea9e60fd","resolution":{"observed_at":"2026-08-07T13:21:57.088377Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:56.860100Z","title":"Malkin, M","venue":null,"work_id":"fcdb76b6-bc1e-43fa-84df-cef10dc5c469","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.270774Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:0945572d4effd42830975fa1947fb6545ef627912d3ff7cbb4db6efce1af3020","observation_id":"f526ea91-0489-4088-9605-11d0fad0f6d7","resolution":{"observed_at":"2026-08-07T13:21:56.941867Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:56.727145Z","title":null,"venue":null,"work_id":"9d485c42-a6bb-4baa-a5a5-9938526721ab","year":2024},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.336515Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:5d0ba6aa727a65fe2446f52b18620a53f0f4a3e22cd3f3bbf3748546df7b8170","observation_id":"239bf135-d486-4981-88f2-abe2b4c6107e","resolution":{"observed_at":"2026-08-07T13:21:56.777768Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:56.539072Z","title":"Anderson, M","venue":null,"work_id":"c2a3316e-0465-439e-a640-54330b531fa3","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.389693Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:541fc53559740d886814514ae1c828c1598b51f87c79b6846402c18ef9ee7c5e","observation_id":"192624d7-bf2a-4108-8a9c-3ffa17667674","resolution":{"observed_at":"2026-08-07T13:21:56.624988Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:56.370703Z","title":null,"venue":null,"work_id":"8b16b252-1682-4d60-a3c6-3f1faad3b5db","year":2021},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.458847Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:3a408d37d449e2625e565abe6f833a50e4956b5b163d47fa32f99c814e741289","observation_id":"777f590d-fcfd-475d-abd7-f63786635fc7","resolution":{"observed_at":"2026-08-07T13:21:56.443733Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:56.218482Z","title":null,"venue":null,"work_id":"4cd8dd8f-4c95-4453-a0d5-4df381b4d422","year":2021},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.536331Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:1f072c7a5f4322cd0d073566d415c87a4d603358529b8d77bed372c45ee61e12","observation_id":"07f55773-a082-41d1-a8e5-01b94feb6737","resolution":{"observed_at":"2026-08-07T13:21:56.299012Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:56.035733Z","title":null,"venue":null,"work_id":"a8adc00c-dd61-47d7-b2e0-e11819dd78f4","year":2020},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.602349Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:f21a643e3279a3e3aaf73c39a7d691f1206ffdd98183a2e8482e70bbbec40ed5","observation_id":"a4af3079-ef23-4e5c-9b4c-14dee61b66b8","resolution":{"observed_at":"2026-08-07T13:21:56.100277Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2020.10494","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:45.860383Z","title":"Strandmark, Y","venue":null,"work_id":"a14a7607-abab-46e9-b9e7-7916e55b58d2","year":2020},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.674091Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:dfb10ec1778929b0b9adc4abed3713c647f87d7ceaa93cdbafeb057b0095969e","observation_id":"1da0d094-b648-4cd9-ad27-227433162b3e","resolution":{"observed_at":"2026-08-07T13:21:45.917135Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:55.863839Z","title":"Wolbeck, N","venue":null,"work_id":"df292dca-1b3b-4e92-8b39-9bab2ac7fb51","year":2020},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.771295Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:b3e7928582948a3c857035fd4adf909cae660f302a8a9640601a6fa4841fb56b","observation_id":"82332801-e0ad-45fd-a0b7-a9f57298fe4d","resolution":{"observed_at":"2026-08-07T13:21:55.953924Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:55.717501Z","title":null,"venue":null,"work_id":"3e5d2e50-d7ae-4fce-819a-389d39113da2","year":2019},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.844789Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:415f5f516030e3d03f1abfd20279956987e61e3c6ef6dd6f9d7133fe73f62fd2","observation_id":"68ab4871-8fc4-47d1-90e9-549dd1c37c8e","resolution":{"observed_at":"2026-08-07T13:21:55.779459Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:55.520454Z","title":null,"venue":null,"work_id":"d08ec1db-31d3-4e71-96bb-3af54264797d","year":2014},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.893242Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:1f5517a9e010c4b4959f63eb4b343d53bb88ad8b8c27ab994485046ea8ed99d3","observation_id":"b797b337-7540-4bf2-b40d-fb75c9a2b23b","resolution":{"observed_at":"2026-08-07T13:21:55.626515Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:55.310454Z","title":"Maenhout and M","venue":null,"work_id":"73783002-5f42-49a0-bc4b-d107e6c241d6","year":2013},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:41.966651Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:4deb63ad9e33afc6ee22a0c78c3250ad8ce72fd97686a77559d7821996a6181c","observation_id":"8b4009a2-97b1-46a9-aa77-633017896645","resolution":{"observed_at":"2026-08-07T13:21:55.414436Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:55.154282Z","title":"Martin, D","venue":null,"work_id":"2bb7adc6-d48a-461e-a6af-4f87dd7de759","year":2013},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.030650Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:5e596bf6d8fe77f9c1eb3835bd6257ba1f63893709ee1bdc4cbef078c0facf67","observation_id":"0bc8b6b3-857f-406e-89b2-542a0b3d9787","resolution":{"observed_at":"2026-08-07T13:21:55.229952Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:55.036956Z","title":null,"venue":null,"work_id":"4a4ac233-5bcc-49d5-bec6-a450f9454fe3","year":2013},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.112355Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:a3fbb1d70d42b301563a2bffa2346fda16478320c6b728287b4dead3dc88fecf","observation_id":"2bf40a83-9f09-471c-bb8e-3bbbcdf3b8df","resolution":{"observed_at":"2026-08-07T13:21:55.109447Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:54.779207Z","title":"Vanhoucke and B","venue":null,"work_id":"ad010881-0bf4-4f22-a013-b4ee967a6c36","year":2009},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.188402Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:ba0fe4090e3a6163ced25a16034fb5a4594f8a4ae19671a0b59ccbde6339a7f1","observation_id":"b122a2ea-5ece-48f2-91d0-cdadc1ac5d7a","resolution":{"observed_at":"2026-08-07T13:21:54.909819Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:54.519861Z","title":"Nishikawa-Toomey, T","venue":null,"work_id":"8d4a7865-cb6d-45aa-babe-82e63802568e","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.272854Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:e5a697514deec5755dda786317bf73f3e97d83dbe70814cf23b521ec1562e8b9","observation_id":"44975f38-717d-4c0c-9736-9ec6e5e6ff1e","resolution":{"observed_at":"2026-08-07T13:21:54.671875Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:54.243077Z","title":null,"venue":null,"work_id":"ad1adb76-6f3a-4d69-9dcb-124409bde0a5","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.347542Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:74370dc4220bf1abbfb55f99e69d7b959e74026db17d64fd2b5d0792f41fc1fe","observation_id":"c1fedb96-c574-4fa5-857f-93c1e738944b","resolution":{"observed_at":"2026-08-07T13:21:54.409109Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:53.974530Z","title":"Lahlou, T","venue":null,"work_id":"7f683152-4f21-405d-9871-0174fc80dc70","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.415667Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:e562082f3e929e18b5cdd4e8d35bdedd9f51ca3853e4d70bafadf6f3a91744e8","observation_id":"2f0b19cc-452c-40ed-ab8b-fc56befc1791","resolution":{"observed_at":"2026-08-07T13:21:54.092708Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2302.09465","last_updated":"2023-06-25T03:31:57Z","snapshot_observed_at":"2026-08-16T05:08:26.555812Z","submitted_at":"2023-02-19T03:19:40Z","title":"Stochastic Generative Flow Networks","version":3},"cited_work":{"arxiv_id":"2302.09465","doi":null,"metadata_source":"pith","pith_arxiv_id":"2302.09465","snapshot_observed_at":"2026-08-07T13:21:45.673193Z","title":"Stochastic Generative Flow Networks","venue":"cs.LG","work_id":"7bd504c5-7afb-4123-8354-2cc13c336157","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.494099Z"},"links":{"cited_paper":"/paper/2302.09465","citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:7a71648e80002271f1f3b0dd964ce3b39c1770370aa0e1e9148a912d4860069d","observation_id":"c1482c53-ea04-4356-80f2-119c1d2c75d2","resolution":{"observed_at":"2026-08-07T13:21:45.721636Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:53.634014Z","title":null,"venue":null,"work_id":"4e99a268-819c-45da-a6e2-ceb06f22ff0a","year":2021},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.621475Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:0e81bb695f77b61ea305de778c83a821a8d1a4d2b04d813076c904862f49b29f","observation_id":"04b6f602-a953-449e-94eb-2fdb3715c7f6","resolution":{"observed_at":"2026-08-07T13:21:53.768443Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:53.407099Z","title":"Sitompul and S","venue":null,"work_id":"bb2359f6-501c-43bf-b728-04aeac5428e1","year":1990},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.723006Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:71c30f4946822b4e7675948803c7e048176302778fe49a22b5ea9bb3700123dc","observation_id":"8e0af29e-9183-418b-b45e-622b0a5e020e","resolution":{"observed_at":"2026-08-07T13:21:53.528228Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:53.137041Z","title":"Jaumard, F","venue":null,"work_id":"b20ffe20-7bab-4fad-94a3-4d479b5c5a39","year":1998},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.781039Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:139b3bb1270deac45382432d8e6b9769ccf002680d67a47c0adfed42f5887b59","observation_id":"d569334a-7492-461d-9719-6bca51ff8841","resolution":{"observed_at":"2026-08-07T13:21:53.286725Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:52.792970Z","title":null,"venue":null,"work_id":"ab53b70d-9fc3-4b87-b57f-f64e4fcc1dde","year":1983},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.867282Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:3992efb6a2215f89caec378e6ef5f2e441256e889f3e97af3cf82b9fcbd39529","observation_id":"702c772e-d181-4fc3-8eba-809f7ccd1612","resolution":{"observed_at":"2026-08-07T13:21:52.902590Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:52.522342Z","title":null,"venue":null,"work_id":"dae5f781-55c1-4b79-89d8-3e4db717d33f","year":2002},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.936406Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:47f0834997dfb77604d77f058e0c9d1a3705f44ea89029c6aeb49b6938e84ae4","observation_id":"5222cb6b-9757-4a0d-9377-c4a8aa27af8e","resolution":{"observed_at":"2026-08-07T13:21:52.668526Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:52.310714Z","title":"Flinkman, H","venue":null,"work_id":"f0fdf1bd-37aa-41bc-ad96-968d168f8ec3","year":2010},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:42.989176Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:1e8f3ae6c2e74dfa74df71994a5ce567c762738e5fda92d15afb0842a5502360","observation_id":"05e76421-3ece-4afa-ae34-c89470f35d60","resolution":{"observed_at":"2026-08-07T13:21:52.408258Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:52.023690Z","title":"Zaerpour, M","venue":null,"work_id":"bcf377a0-0f0f-49f0-99f6-c19ab1bdf04d","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.036219Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:586c59dc1c577c6745c249e8f0b176e184c3dd78b99671f7fcbb941b8150ff51","observation_id":"0af2181d-a8ce-44aa-abc4-a70930d2106c","resolution":{"observed_at":"2026-08-07T13:21:52.159920Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:51.780176Z","title":"Rath and K","venue":null,"work_id":"034ab321-5a32-4b5d-ba09-ebda93eb67d9","year":2022},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":64,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.105574Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:f6dcb1d3560cfc0a344626088f6aafa95bf8f2218d98308e5b7965753cea9136","observation_id":"ab2c5974-1f72-4b6c-8d19-48e1a6eb8913","resolution":{"observed_at":"2026-08-07T13:21:51.873973Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:51.533049Z","title":null,"venue":null,"work_id":"150c944b-79db-4133-b457-9a103b3cc5bc","year":2023},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":65,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.177943Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:28c7238afaeed37ac85c754b313d4e05d82a5c6a1caa68c51d77dc5c65b96c44","observation_id":"99a21915-81e8-4ad5-846a-d19faf88d4fe","resolution":{"observed_at":"2026-08-07T13:21:51.630520Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:51.286433Z","title":null,"venue":null,"work_id":"09376714-8abd-4cd2-bf70-468fe7e8da16","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":66,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.240962Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:98ddf015338d47957c0318acd82d87b93f54b4777b11db3b1c41ee88ca9d6673","observation_id":"f67a9ff8-6e8f-4062-85bc-83529a2a81ff","resolution":{"observed_at":"2026-08-07T13:21:51.397459Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:51.022092Z","title":null,"venue":null,"work_id":"a4138037-5bc8-4b1c-8bbc-655e9d3abb4d","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":67,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.350557Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:5e839b3e5bd198fd874e7cd61036fba6d1e37f4dfc5499427606cea3158dea3c","observation_id":"cc83a324-4c37-48f5-8c65-addf1a02b286","resolution":{"observed_at":"2026-08-07T13:21:51.159726Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:50.722464Z","title":null,"venue":null,"work_id":"fa1f91e8-7c8b-461e-8469-bc2dea42e5e9","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":68,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.411512Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:aca97747959da6ef8f9fd2cd0c4489312dfdbfffd8d9b87d9fa9af67c923c8e9","observation_id":"ea2deb93-f047-480e-8b05-52907c1c8dc4","resolution":{"observed_at":"2026-08-07T13:21:50.855791Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:50.445977Z","title":null,"venue":null,"work_id":"34aad01e-4741-407a-b709-53e6e4366f57","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":69,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.536841Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:6414bc26f3dc271eb3d4a37c37fc588de9b91564266f46b595879644797606f5","observation_id":"2e519161-3941-4dc8-833c-9142081b1cc8","resolution":{"observed_at":"2026-08-07T13:21:50.594979Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:50.287729Z","title":null,"venue":null,"work_id":"f2677ed6-9e67-4076-be91-039c7897f77d","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":70,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.600838Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:314067bf65ff378dca5785d644fa87ded24700b7f87fd576766bb3434ab2c1ac","observation_id":"3c0d5ebc-4b24-4bc9-8d82-71cf80885c57","resolution":{"observed_at":"2026-08-07T13:21:50.374679Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:50.015247Z","title":null,"venue":null,"work_id":"36b26f83-6934-40c3-b202-03486851a7a6","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":71,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.713437Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:461e430c471ae6257a3f947fa3a8600479c638553435409af06cadbd3e7cac2d","observation_id":"285df0cd-326a-437e-b03c-db24cef7619b","resolution":{"observed_at":"2026-08-07T13:21:50.159118Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:49.732152Z","title":null,"venue":null,"work_id":"86f9db26-e3be-4470-a97e-277b6e41918e","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":72,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.854210Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:f12dc6f2ea552f6eaafab6144a158769b8b983fe17003706d9b2d7f88697e4b9","observation_id":"b334a84e-ea28-4a50-8172-31c0eedf1b85","resolution":{"observed_at":"2026-08-07T13:21:49.867053Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:49.458230Z","title":null,"venue":null,"work_id":"a6d73454-8755-4828-8f74-11a7f7936fc7","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":73,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:43.972756Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:3dad0f43baafd8c3b52bad6b1647e0ebca4627bc7eb403083bcfc9a0a87a6cda","observation_id":"4baf45cc-7880-4afb-acef-bb9c376082b6","resolution":{"observed_at":"2026-08-07T13:21:49.623546Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:49.243020Z","title":null,"venue":null,"work_id":"8695e17e-b86b-4bab-86bc-59ec2c39cf58","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":74,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:44.106172Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:3c2b4d2b0f2d526c013ef9697ef3bc6d9e01ca80ed1be45871ac785ba825aa2b","observation_id":"2ffd00e8-88f8-449c-bcee-1c45e65d3f61","resolution":{"observed_at":"2026-08-07T13:21:49.331114Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:48.934181Z","title":null,"venue":null,"work_id":"21c84be2-bdb8-4f6e-b216-1912bb77e42e","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":75,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:44.197697Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:8e187c55dbfeb62a9dc223a3881922e2c6ab70d5515056bb23633d600bb8a887","observation_id":"9486d355-6c08-4f4a-8dc5-bf9f0c5981dc","resolution":{"observed_at":"2026-08-07T13:21:49.074189Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:48.740154Z","title":null,"venue":null,"work_id":"031a8432-cd7f-4bbf-9e7e-cce25787b68b","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":76,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:44.314274Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:2c121ee9e900d7cd4c40088e3dc5d7ba920addce66985236c6159480c440f920","observation_id":"2a40a9e1-ea3e-4966-8419-c31ecfda229b","resolution":{"observed_at":"2026-08-07T13:21:48.857117Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:48.483082Z","title":null,"venue":null,"work_id":"efb36958-99d1-489e-8329-e20cc4cff018","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":77,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:44.455563Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:99b10c11eca6b7f6fad22165063d19a65c0a761b80ca12203a5f31e00c7f56f4","observation_id":"d8ad549c-9f68-4d1b-bfcd-bc8c09758181","resolution":{"observed_at":"2026-08-07T13:21:48.597110Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:48.231338Z","title":null,"venue":null,"work_id":"e1042763-4de5-4e15-ac0c-02b3c6b20e9c","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":78,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:44.576277Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:fb705186796139a1245afd21df41ec6074e88bba3a0eab61442bd808aa6ba747","observation_id":"6d3f41e9-0aee-4d4f-bdd2-62fdcfdefb31","resolution":{"observed_at":"2026-08-07T13:21:48.357079Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:47.974143Z","title":null,"venue":null,"work_id":"1df27e26-097c-4891-ad9f-8ba1a9df12b1","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":79,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:44.739766Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:6b19008a1a9e141b0b4716719933679f572ee132d85d3291e026787ce78407fa","observation_id":"b39087de-03ef-4e90-8a9d-a25f39f74963","resolution":{"observed_at":"2026-08-07T13:21:48.111992Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:47.907720Z","title":null,"venue":null,"work_id":"a036d2f7-71f2-4c9a-892b-31256ca3da8c","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":80,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:44.870623Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:7450b57a47afc7ee01420ad5338f54b23387743cd744f57310adbd22543be155","observation_id":"03f8384b-274b-4f19-9593-0c448a9c6db6","resolution":{"observed_at":"2026-08-07T13:21:47.960767Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:47.771033Z","title":null,"venue":null,"work_id":"ce58a21a-55d7-4ea2-8a84-857a28b5c31f","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":81,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:45.001025Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:3104c4c724a2dc7663bb903684bb449a3ea44d8f1d81d484a97842aa1764bb1c","observation_id":"bb689a51-e98e-4cdb-8b18-a046df8e65c5","resolution":{"observed_at":"2026-08-07T13:21:47.845514Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:47.638232Z","title":null,"venue":null,"work_id":"3048231a-faee-45d5-af3c-93a80463f883","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":82,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:45.117173Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:a12193d0dcdfe9d05df892c03265e7c35e913a562ccd9dbabc97102b7b63beb6","observation_id":"682f60cc-ed2b-43b2-ae01-3df49e24ebda","resolution":{"observed_at":"2026-08-07T13:21:47.696782Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:47.541774Z","title":null,"venue":null,"work_id":"7c3dadd0-b1be-4a16-a9a3-6d98e8f4e27b","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":83,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:45.273629Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:547438a30535320a2451e6954ad4600567b1f47e47c7db9302a8597063ca0917","observation_id":"1aca3cff-b7c6-4363-907e-073dec3d1f80","resolution":{"observed_at":"2026-08-07T13:21:47.569708Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:47.381003Z","title":null,"venue":null,"work_id":"5dddaf3e-cb23-499f-8a4f-13960ebf0643","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":84,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:45.375264Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:e8e6c8cb91e5bd9eb684407ddf94cabb360ce9dda243f66957a8c82bc37c4190","observation_id":"48dfef1c-68e6-49b4-9f4c-05d4fa379b9b","resolution":{"observed_at":"2026-08-07T13:21:47.444060Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:47.249541Z","title":null,"venue":null,"work_id":"b1b46b36-3c9e-4f98-a353-4956c74196cc","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":85,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:45.495310Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:78f3302e8a7d442d899b64c307676357e844ac5ed197208f4e8e0cc500c076ef","observation_id":"1af1decd-7e64-47d2-a3e5-9e4340a9fdfc","resolution":{"observed_at":"2026-08-07T13:21:47.314258Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:21:47.080746Z","title":null,"venue":null,"work_id":"fb323ed3-4e40-465f-b503-a17e753059a9","year":null},"citing_paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty","version":2},"reference_index":86,"source":"pdf_text","source_observed_at":"2026-08-07T13:21:45.572027Z"},"links":{"citing_paper":"/paper/2505.22124"},"observation_digest":"sha256:42a3a0d47ab16abf35286c5bcdc3d24b083fc5880463c8ac3da6a7997c5744a2","observation_id":"3253a379-bc56-46f2-9716-36288e329673","resolution":{"observed_at":"2026-08-07T13:21:47.159976Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2505.22124","last_updated":"2025-05-30T06:53:20Z","latest_version":2,"primary_category":"math.OC","snapshot_observed_at":"2026-08-15T06:51:33.768279Z","submitted_at":"2025-05-28T08:50:09Z","title":"A Nurse Staffing and Scheduling Problem with Bounded Flexibility and Demand Uncertainty"},"reference_resolution":{"displayed":86,"state_counts":{"malformed_identifier":0,"metadata_mismatch":4,"parse_uncertain":0,"unresolved":52,"verified_exact":2,"verified_fuzzy":28},"total_outbound_references":86},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"thesis":"As of 16 August 2026, this Paper Citation Record lists 86 of 86 outbound references and 0 inbound Pith citation observations for arXiv:2505.22124."}