{"as_of":"2026-08-08T21:28:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:dbe25f4482035c081b967a9caa53f8b8e65982f02091b6f2d63b879a9c44f5d9","coverage":[{"denominator":22,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":22,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T13:02:39.274538Z","state":"measured"},{"denominator":23,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":23,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T00:51:53.351553Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"pith","source_observed_at":"2026-08-07T00:51:53.399735Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"cited_work":{"arxiv_id":"2505.23149","doi":null,"metadata_source":"pith","pith_arxiv_id":"2505.23149","snapshot_observed_at":"2026-08-07T00:51:53.399735Z","title":"Stochastic Production Planning in Manufacturing Systems","venue":"math.OC","work_id":"bb55cffc-3873-4a63-8f95-a371ac586dae","year":2025},"citing_paper":{"arxiv_id":"2506.12560","last_updated":"2025-06-14T16:03:52Z","snapshot_observed_at":"2026-08-07T13:30:19.595825Z","submitted_at":"2025-06-14T16:03:52Z","title":"An Iterative PDE Based Illumination Restoration Scheme for Image Enhancement","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T00:51:53.351553Z"},"links":{"cited_paper":"/paper/2505.23149","citing_paper":"/paper/2506.12560"},"observation_digest":"sha256:e2ad27f3720e9d8fa5fcbe5a0ceeccd2205f95255cd9ee340550a474f03b6d5a","observation_id":"0cc4e1d4-9eaf-4892-a450-2963bf40fd7a","resolution":{"observed_at":"2026-08-07T00:51:53.405873Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2505.23149/citation-record","integrity":"/paper/2505.23149/integrity","json":"/paper/2505.23149/citation-record.json","paper":"/paper/2505.23149"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:42.392140Z","title":null,"venue":null,"work_id":"f6f446e5-d1cc-462b-8eaf-96269d0e5884","year":1996},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:36.988081Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:0e53e0aba771428d0957902a29a22052e49045334fa5c78dbd815d33d5ed0c3f","observation_id":"a27ae36b-2ac9-4f24-bc71-e1064e7aba8f","resolution":{"observed_at":"2026-08-07T13:02:42.463974Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:42.214413Z","title":null,"venue":null,"work_id":"57130e5b-253b-4658-a854-640ae58eb966","year":1976},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:37.060301Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:a9846a5d7d49ddca9256c9baa4ce50b93f229a4d9ff870f1efe65214e9d9a057","observation_id":"ae8aed26-2f66-4875-8624-f74b6443958b","resolution":{"observed_at":"2026-08-07T13:02:42.314266Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:42.094015Z","title":null,"venue":null,"work_id":"06cb1e0d-3f55-4578-9327-47e48e791fd0","year":2006},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:37.209035Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:38866427d91d7590c693c8e3989a2ac09abdd80aca28d58a2eab281912d0640c","observation_id":"cd020c30-3610-4f78-83f0-b9bc8afb58b6","resolution":{"observed_at":"2026-08-07T13:02:42.145457Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:41.965605Z","title":"Bayram, T","venue":null,"work_id":"2142010f-9a5c-4fe8-830f-fbad1d532e62","year":2018},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:37.366976Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:06e532ad64e5c92786fdeabbac2ab8f144e6bca45e80e47b0615dace670f1830","observation_id":"dad30bbb-e574-4f05-af97-43ea548a6450","resolution":{"observed_at":"2026-08-07T13:02:42.024204Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:41.769859Z","title":null,"venue":null,"work_id":"f666ac9d-5e2d-4800-88f6-b818bcc3a9e9","year":1976},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:37.512549Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:cdb98eca316fdc0cb8ae234d9716df7d0e93fe479cd848d1ec0df4d103d66ccb","observation_id":"991c75f9-dac9-4d06-a9e0-9442d79df6e7","resolution":{"observed_at":"2026-08-07T13:02:41.903564Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:41.577092Z","title":"Cadenillas, P","venue":null,"work_id":"d217e958-5f87-49b8-b820-52161ab6af8c","year":2010},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:37.657355Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:6a5385e2a3961de29f92fffa5a8ae75ca69106335e18b0523ca8dfce998f83b5","observation_id":"fdf0baba-e274-465c-b417-97703040d943","resolution":{"observed_at":"2026-08-07T13:02:41.683347Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:41.401689Z","title":"Cadenillas, P","venue":null,"work_id":"b9c22eee-4bc4-4f4c-a7a8-b5893f38ba60","year":2013},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:37.772142Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:72b9253d02706eb7b00a0c0241e9005fa7b7e95fd7f72bacfd1058121e00957b","observation_id":"70e9b8ba-5320-4c4d-9f7c-9b0f8473d634","resolution":{"observed_at":"2026-08-07T13:02:41.479127Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:41.217706Z","title":"Canepa, D.-P","venue":null,"work_id":"faaaf28d-40a2-4c7e-88aa-37516af5e95e","year":2022},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:37.873280Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:d95130f8f83059ad2f22375800eda7da258c65e06ad76d71f3fc1c95bd7d61a8","observation_id":"0dc8a3d0-0017-46d4-8e28-0319d8ca2593","resolution":{"observed_at":"2026-08-07T13:02:41.302107Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2505.07699","last_updated":"2025-05-12T16:07:57Z","snapshot_observed_at":"2026-08-07T15:47:49.398380Z","submitted_at":"2025-05-12T16:07:57Z","title":"Image Restoration via Integration of Optimal Control Techniques and the Hamilton-Jacobi-Bellman Equation","version":1},"cited_work":{"arxiv_id":"2505.07699","doi":null,"metadata_source":"pith","pith_arxiv_id":"2505.07699","snapshot_observed_at":"2026-08-07T13:02:39.444953Z","title":"Image Restoration via Integration of Optimal Control Techniques and the Hamilton-Jacobi-Bellman Equation","venue":"math.AP","work_id":"e3104c99-36af-4882-9c86-6e08f15de4d7","year":2025},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:37.980373Z"},"links":{"cited_paper":"/paper/2505.07699","citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:6b012b8370df6540dd948e60271270d4da3d5e1a4a3d999f5ba0e1ada3d3c53a","observation_id":"4df66686-f048-4727-815e-89e58ed6acc1","resolution":{"observed_at":"2026-08-07T13:02:39.532038Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2505.12341","last_updated":"2025-05-18T10:14:14Z","snapshot_observed_at":"2026-08-07T15:43:41.603104Z","submitted_at":"2025-05-18T10:14:14Z","title":"Stochastic Production Planning: Optimal Control and Analytical Insights","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2505.12341","snapshot_observed_at":"2026-08-07T13:02:38.132321Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.132321Z"},"links":{"cited_paper":"/paper/2505.12341","citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:ca8da64a9ed721fd04ee887db5ac41fb46980224caa2507461e7d241e4c40ee9","observation_id":"3b707b7f-eb26-41f9-b904-4c825c14ee29","resolution":{"observed_at":"2026-08-07T13:02:38.132321Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:41.051185Z","title":"and Tubaro L","venue":null,"work_id":"b6ed7fb5-6170-4813-8594-71fbd6fb4b80","year":1990},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.242514Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:a12633a9019f22ea3e897f3406c0448888b01679eaae86af5dfc4fce9fe6be52","observation_id":"5d2872e8-677c-4713-a69b-f18ef64ef9dd","resolution":{"observed_at":"2026-08-07T13:02:41.121845Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.980026Z","title":"Gharbi and J.P","venue":null,"work_id":"3726a066-09d5-4ad1-94e9-f36a1def1d6b","year":2003},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.383150Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:6b2dcd6ab23517d4356c06a48130cd3acd2eb7c2b7f80e3cd8af6d1bd5f431b9","observation_id":"b4434058-2c29-4a47-a1de-87dda594c05e","resolution":{"observed_at":"2026-08-07T13:02:40.997337Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.964381Z","title":"Gilbarg and N","venue":null,"work_id":"2037f8c4-efec-4105-9339-b56cd933572e","year":1977},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.483214Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:ad51bcdce8fa6e98abe383b19e409dd904c6c534eab95207256f87c9e1e2d110","observation_id":"a397e1df-0e50-4c94-9899-8e245d5a78ed","resolution":{"observed_at":"2026-08-07T13:02:40.973084Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.844920Z","title":"Holmes-Cerfon","venue":null,"work_id":"12a68ded-d9b1-4d48-8e83-59f291a140f2","year":2024},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.618311Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:a58d7e63a3d8659304d4a80081d25b7bd97a49ef0c21382b73e8690f08ff3caa","observation_id":"261b2a7f-745d-471f-a743-b97a4af219d8","resolution":{"observed_at":"2026-08-07T13:02:40.917298Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.700603Z","title":null,"venue":null,"work_id":"dfa03e3c-7a4b-4212-a53e-0e8496830c6a","year":1992},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.720539Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:b3087fd70c27256cc9c8fc43ff86423fa8adf945f96091a0f3ea636839431ae2","observation_id":"fbe27296-e3f0-4d24-a028-29415a3501df","resolution":{"observed_at":"2026-08-07T13:02:40.758169Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.559164Z","title":"Korevaar","venue":null,"work_id":"f924149a-0d12-4faf-b08f-858a15509468","year":1987},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.810025Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:c99da8b108edf14559a1a56e8f0dbbb21502c688c69d1312d907d233781ef0d6","observation_id":"dcb48b6e-6300-458b-81aa-c6b81fd6cf87","resolution":{"observed_at":"2026-08-07T13:02:40.619005Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.422174Z","title":"Lasry and P.L","venue":null,"work_id":"767f56a9-3146-4256-9895-231450a8f4ca","year":1989},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.910468Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:eb52df0d8d8cb7e1a7682d96998c66075a106003885652511fc45e3e72076a35","observation_id":"348bb15b-0d60-4853-a261-5732ed5729fd","resolution":{"observed_at":"2026-08-07T13:02:40.493037Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.306972Z","title":null,"venue":null,"work_id":"fc043889-7c7c-4a72-bdc2-6235fe60d96c","year":2011},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:38.972710Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:4d1b97dcbcb0c92edb83e42da80de49ca26dd8734efe3cd25cdb896bb47630e9","observation_id":"56556bfb-2b6b-41e7-92b4-2103ed40bd41","resolution":{"observed_at":"2026-08-07T13:02:40.366524Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.171956Z","title":null,"venue":null,"work_id":"6346b54d-c04b-41ff-adf9-44d3d4445624","year":2015},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:39.029300Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:2c7774efee765fbfcb84944e90cbfa2c195512e6a98110dedcf25d391d61ae56","observation_id":"a44e71dc-6013-42e2-82fc-04d4b4d23af5","resolution":{"observed_at":"2026-08-07T13:02:40.225995Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:40.038705Z","title":null,"venue":null,"work_id":"26b11ef6-fa13-4510-94d4-47529a8fb2c0","year":2020},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:39.100933Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:df8dbc0dac9ef8f4a57d2655956da98f5017b6b6eb0e3115f1fed1ed4927b057","observation_id":"4ab857f0-d6b1-4bdd-ac04-099c88284001","resolution":{"observed_at":"2026-08-07T13:02:40.111139Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:39.833864Z","title":"Sethi and G.L","venue":null,"work_id":"12d526bb-c77a-4db4-a5df-527ed09e4d1a","year":1981},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:39.195282Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:b06739fa933132eb42d9ce6bfe016f97a6a43168bb43f9b69597886a06df2d7d","observation_id":"3835cc5d-e4bb-4b47-826d-cc66f726a88c","resolution":{"observed_at":"2026-08-07T13:02:39.895764Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T13:02:39.624180Z","title":"S i m u l a t i o n ␣ halted ␣ at ␣ t ␣ = ␣ { t_vals [ i ]:.2 f } ␣ with ␣ x ␣ = ␣ { x_new :.4 f } ␣ ( out ␣ of ␣ bounds )","venue":null,"work_id":"18eb5e47-6809-4738-8789-9aed3008c75a","year":1984},"citing_paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T13:02:39.274538Z"},"links":{"citing_paper":"/paper/2505.23149"},"observation_digest":"sha256:1f667e158bce9520493f016cb132cfcc49b36f6deae4b795e3e692a0b9562d17","observation_id":"10a46f51-1620-4360-9831-7099f49659e4","resolution":{"observed_at":"2026-08-07T13:02:39.721238Z","resolver_source":"raw_fallback","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2505.23149","last_updated":"2025-05-29T06:41:37Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-07T12:50:03.950224Z","submitted_at":"2025-05-29T06:41:37Z","title":"Stochastic Production Planning in Manufacturing Systems"},"reference_resolution":{"displayed":22,"state_counts":{"malformed_identifier":1,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":9,"verified_exact":1,"verified_fuzzy":11},"total_outbound_references":22},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 22 of 22 outbound references and 1 inbound Pith citation observation for arXiv:2505.23149."}