{"as_of":"2026-08-08T02:15:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:e0ee1c537e7b0b2eff1bcf235d2b6da559dc88c8fb145df051663b9d511cb703","coverage":[{"denominator":98,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":98,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T12:41:16.464290Z","state":"measured"},{"denominator":98,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":98,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-07T06:34:17.273281+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2505.24045/citation-record","integrity":"/paper/2505.24045/integrity","json":"/paper/2505.24045/citation-record.json","paper":"/paper/2505.24045"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:05.769408Z","title":"What are the causes and cures of poor megaproject performance? a systematic literature review and research agenda,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:05.769408Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:3e79feadee6626214f40d30faa311e2cef7bdccf57bb9c0f698a777d7a667d2f","observation_id":"99de9d2b-519e-4319-ba21-7999ecd20088","resolution":{"observed_at":"2026-08-07T12:41:05.769408Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:05.798748Z","title":"What you should know about megaprojects and why: An overview,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:05.798748Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:66f61abdd470f8b625cfa10786e4d54bb93fc26d893b688ed903ecac55540b9a","observation_id":"d59de094-123b-4900-9674-8d7dd5ae7d17","resolution":{"observed_at":"2026-08-07T12:41:05.798748Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:05.914012Z","title":"Oxford University Press, 2017","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:05.914012Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:6aa801be52672362f15c88cdad85647446a56f5741215b63206f57ae0338954b","observation_id":"5e2a98b5-e1ac-4c67-9c73-cdb790ba54e3","resolution":{"observed_at":"2026-08-07T12:41:05.914012Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:05.973601Z","title":"Complex project management as complex problem solving: A distributed knowledge management perspective,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:05.973601Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:c4664717f1a5bf9cf5b14578d39f92715c0afabbf74cd40a17993d4fc3e1a61e","observation_id":"b2e2788a-a0a8-4767-9717-b50285c9cf17","resolution":{"observed_at":"2026-08-07T12:41:05.973601Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.050833Z","title":"Flyvbjerg, Megaprojects and risk: An anatomy of ambition","venue":null,"work_id":null,"year":2003},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.050833Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:769d150fec99f1d2ccafba247ab8f82a13c8c072087dab02b10d1d04286409b2","observation_id":"a25d3300-c7ff-4e0e-8d79-d08af1941611","resolution":{"observed_at":"2026-08-07T12:41:06.050833Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.136451Z","title":"The fundamentals of boosting high-quality development by megaprojects: a systematic literature review,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.136451Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:17cb43e8a751fe662ed428c5acd6a00d3262650c12acd38009071698adf970fa","observation_id":"2feade33-ae54-4b4d-b2c7-3af033f82b27","resolution":{"observed_at":"2026-08-07T12:41:06.136451Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.218300Z","title":"Managing global megaprojects: Complexity and risk management,","venue":null,"work_id":null,"year":2013},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.218300Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:9d4a759e19cfe926324af96fea3a35487f779329c1dae5d317d4daa85b498327","observation_id":"def64e5e-e359-4239-b3ec-5614ffc4450e","resolution":{"observed_at":"2026-08-07T12:41:06.218300Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.289040Z","title":"Delusion and deception in large infrastructure projects: two models for explaining and preventing executive disaster,","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.289040Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:09bbe7af494d3db730c0f4f313b8db6064bf7e8989583102ae4b1565c0f91080","observation_id":"95f51adf-9cdf-4c46-8bc6-0adca623d150","resolution":{"observed_at":"2026-08-07T12:41:06.289040Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.365871Z","title":"Temporal clustering psha based on smoothing: a case study in the new madrid seismic zone of the central usa,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.365871Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:eebf9ce30021a35ddc536f1d18e7252fe0cc16c648987f710d862bda87e98c44","observation_id":"69234796-ca4f-4848-9b5c-89295edfd8e6","resolution":{"observed_at":"2026-08-07T12:41:06.365871Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.426331Z","title":"Measuring performance within the supply chain of a large scale project,","venue":null,"work_id":null,"year":2007},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.426331Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:40f2adc6a3b5f2747395d5fd5bb789d9828a6ea5c81888d783200812222e3e53","observation_id":"0475a512-cca9-4f41-8742-5c427f1e2ddf","resolution":{"observed_at":"2026-08-07T12:41:06.426331Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.504003Z","title":"Systems engineering to improve the governance in complex project environments,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.504003Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:6c4019a3752ef33c57274034cb8a6bc6cf7468084bf136fe9b835b4211967f48","observation_id":"eebd9d9b-4e04-450d-95c6-4499b99a5872","resolution":{"observed_at":"2026-08-07T12:41:06.504003Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.579566Z","title":"What are the strategies to manage megaproject supply chains? a systematic literature review and research agenda,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.579566Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:404cc041f30fbe4658a6aca232a95474b981037336f1d18460de34f223d78caa","observation_id":"bd6529ac-5e74-4b43-ad64-ba27cb0a2c8a","resolution":{"observed_at":"2026-08-07T12:41:06.579566Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.649266Z","title":"Keeping it simple? a case study into the advantages and disadvantages of reducing complexity in mega project planning,","venue":null,"work_id":null,"year":2012},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.649266Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:9a010cacb88016d78e974b6667f56655b7e5b88d99d317145e9d2c455b111064","observation_id":"09681c31-1cf0-4858-b9a2-9a6a2b82e092","resolution":{"observed_at":"2026-08-07T12:41:06.649266Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.724295Z","title":"Competing management approaches in large engineering projects: The dutch randstadrail project,","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.724295Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:8258c203060bd3f201fd616b4d631837b135f178dc50d7806b0508f406fab9a8","observation_id":"ca173a5f-3fdd-4a09-8a12-877985f70b6d","resolution":{"observed_at":"2026-08-07T12:41:06.724295Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.800660Z","title":"Old mega-projects newly packaged? waterfront redevelopment in toronto,","venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.800660Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:51241e109cd5c01ab8e4844b2b9ae46064386c269ad4c9a500cff967ef71286e","observation_id":"44799757-1ff3-47c2-b17d-f20f5dad2838","resolution":{"observed_at":"2026-08-07T12:41:06.800660Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.867981Z","title":"Data-driven approach to risk identification for major transportation projects: A common risk breakdown structure,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.867981Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:7f13e1ce90f48628f784d27ec702a490e6fb5dd64cb0de8b963d7f0e4c34091a","observation_id":"84978b64-b67d-490e-8e59-c351266daf52","resolution":{"observed_at":"2026-08-07T12:41:06.867981Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:06.936226Z","title":"Five things you should know about cost overrun,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:06.936226Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:4c6577d451f718659af1f1ba84ee12e1ad461aca824655c593433a3f53d4b1ff","observation_id":"5a6ba054-50c0-4f65-9a36-54cdbd7f0f06","resolution":{"observed_at":"2026-08-07T12:41:06.936226Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:07.023982Z","title":"Causes of delay in large construction projects,","venue":null,"work_id":null,"year":2006},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.023982Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:81afcfa563b1c02f1dc63d1b83c873916570fa9b24ef7ae59e76c78e7a1ef315","observation_id":"e5acca2c-0ea3-4402-9b1d-0ea9240c7b18","resolution":{"observed_at":"2026-08-07T12:41:07.023982Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:31.476475Z","title":"How common and how large are cost overruns in transport infrastructure projects?","venue":null,"work_id":"0123a4c7-c087-4c9d-ace4-32796b9b32ce","year":2003},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.099279Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:49e066415d1196226fd294c629d7f5250924884af4980fe69526fcae88c777a7","observation_id":"05971b82-cca3-436c-b03a-8eca1e3c293b","resolution":{"observed_at":"2026-08-07T12:41:31.565996Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:31.265884Z","title":"Underestimating costs in public works projects: Error or lie?","venue":null,"work_id":"fddf70b8-bdfb-4531-92a2-8f96dfe9d8a7","year":2002},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.156846Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:c463ec757b89e1d2ec2d7f8a0c8170f51e631b6cf480a8ddd1ee11ae8dec1314","observation_id":"98012bb2-7d78-4bfd-bece-2eeedbd38254","resolution":{"observed_at":"2026-08-07T12:41:31.343414Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:31.105011Z","title":"Designing the transition to operations in large inter-organizational projects: Strategy, structure, process, and people,","venue":null,"work_id":"cb5da1a4-bae4-4595-a827-8bcd0d2071eb","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.269648Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:8093bf9973669c0be5b36074e4f07951c60b396f2d863ba78ad96ebe81a1bc1f","observation_id":"0a8798f3-6e2f-462f-9477-0a510e876809","resolution":{"observed_at":"2026-08-07T12:41:31.174152Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:30.950107Z","title":"Managing public–private megaprojects: Paradoxes, complexity, and project design,","venue":null,"work_id":"92cb148d-d7b5-408e-81a5-96c772de8b52","year":2008},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.387006Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:b3e48563898cddc80fa12071e9afbf742d6e8a7e5d947b5c1b97db8c9265416c","observation_id":"b9ad49b9-02ba-4db8-9750-3ed7cf0f116e","resolution":{"observed_at":"2026-08-07T12:41:31.024247Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:30.749864Z","title":"The culture of project management: understanding daily life in complex megaprojects,","venue":null,"work_id":"53483b1c-3ee5-439b-b33e-07a8ad595c34","year":2006},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.451452Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:7ad52c136ed4c807b7e66dfb1785d932ab60d2c7021d5febd1b47fd616eb5bac","observation_id":"6d3c96a1-2af8-4fdb-b344-1839ed2dc37f","resolution":{"observed_at":"2026-08-07T12:41:30.834155Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:30.528883Z","title":"Martin, Organizational culture: Mapping the terrain","venue":null,"work_id":"75c82dbd-6a32-4e27-a2b4-da8f8bba5037","year":2001},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.567010Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:0aa400d8a50dbcbd215fa9442a69391aaacfea1b96e454444f0d4c6065cfcd72","observation_id":"67e14a2b-f340-483b-867f-8f3a4bac14d0","resolution":{"observed_at":"2026-08-07T12:41:30.644128Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:30.339690Z","title":"The ambiguous project concept (s),","venue":null,"work_id":"4c075c2d-a7ad-4ffe-9378-9dcd47368f42","year":1998},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.619723Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:69d06c008e1ff05d4a6d3b873cc4906e1f0fcf4f4646245fa575f21c053bede5","observation_id":"f9a1cc63-2638-418c-b1b9-438b2cebd5ac","resolution":{"observed_at":"2026-08-07T12:41:30.431748Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:30.115865Z","title":null,"venue":null,"work_id":"281c52dd-f5e3-4daa-b503-6a2d472a952f","year":2007},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.682373Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:354742adc4e862851037df240d1574c7014c3bb7f4698cbd525fb4dfb26bf05b","observation_id":"d12f53e6-e2e9-4206-adb6-cddd009a82ea","resolution":{"observed_at":"2026-08-07T12:41:30.194960Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:29.981424Z","title":"Uncertainty: a typology and refinements of existing concepts,","venue":null,"work_id":"05157ba3-ee97-42d2-adc4-3f66072028e0","year":2011},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.760473Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:7948d1cab721120d5bf0a378505888461f7c9df570f271f076a5760cdff0f149","observation_id":"31862428-82bf-4da8-aaba-93bb9738a592","resolution":{"observed_at":"2026-08-07T12:41:30.046062Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:29.776684Z","title":"Collaboration and opportunism in megaproject alliance contracts: The interplay between governance, trust and culture,","venue":null,"work_id":"07f59c8b-ffd9-464f-9a7b-9f700cc4daa7","year":2021},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.804552Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:dedeaaca01506319efd439318b2dcc9ef973fc0e81754d02ccc6b6c942c5ed60","observation_id":"099a9668-6e9b-4846-864c-d509c95f7c00","resolution":{"observed_at":"2026-08-07T12:41:29.863560Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:29.462676Z","title":"Boosting coordination and employee motivation in mega-project sustainable performance through quality relationships: The key role of quality management system,","venue":null,"work_id":"c01e46aa-6de6-4482-9556-c01927c8f1bf","year":2025},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.865498Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:0fc5d6f55891aa98e31876353fbbbea22811f898e85bfb99fcccf529dd41bb86","observation_id":"d32214dc-50c3-41c0-abb9-c335b2762130","resolution":{"observed_at":"2026-08-07T12:41:29.640599Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:29.206233Z","title":"van Steen, Graph Theory and Complex Networks: An Introduction","venue":null,"work_id":"2b2357cb-675e-4661-a199-73f225389944","year":2010},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:07.958104Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:4a30494fe024ea38f592b5782489fa842e38d134245e6894995301fe0ecce0ca","observation_id":"1b9ebacc-05ff-4d3f-9abb-4c1a47ff99dd","resolution":{"observed_at":"2026-08-07T12:41:29.333724Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:29.068768Z","title":"Multilayer networks,","venue":null,"work_id":"10dfac28-c8e4-4ad8-81ef-3c0c8da5324b","year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.071551Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:0b879416325848bfa74b90cbf61a7afb7f808f0837cc58d416dc5e8a99041924","observation_id":"181f3311-a7c3-49ef-92f7-94d60df38980","resolution":{"observed_at":"2026-08-07T12:41:29.112462Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:08.196569Z","title":null,"venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.196569Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:7568c5c6a5a7a9c2d72b896f9489159197eb603993f9cd7cf228d5ca1f42ada5","observation_id":"80deebc7-34d2-4055-8403-e83182ac6cf2","resolution":{"observed_at":"2026-08-07T12:41:08.196569Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:08.261917Z","title":"A Tensor-Based Formulation of Hetero-functional Graph Theory,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.261917Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:abbd116cc72fbc2b7d8dda514ba496d7b6e9479f83be0347fcd1a365702ce6cd","observation_id":"d388874c-c8e4-49c4-be42-dac3cf4dee8b","resolution":{"observed_at":"2026-08-07T12:41:08.261917Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:28.858762Z","title":"The four coordination roles of clients when designing megaproject organizations,","venue":null,"work_id":"bc7887de-cc6c-47f1-8904-05a7e29b86dd","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.352562Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:1e29755bf9d7cf1b5d91a94107c5b575940b086a912ee6f32af2e877068f35d8","observation_id":"74e19d8e-1c8f-41e3-b78a-36020f7fb179","resolution":{"observed_at":"2026-08-07T12:41:28.965017Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:28.594456Z","title":"Organisation design in megaprojects: A systematic literature review and research agenda,","venue":null,"work_id":"5f80b4ad-4cb2-4042-b187-990c2f52c5d5","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.441518Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:b1003954117fa8a2d765a5c887cc4181115d522d765be014c00b74ba2ac0ccf0","observation_id":"d0378559-5ca8-4d60-935b-c7cc272f795e","resolution":{"observed_at":"2026-08-07T12:41:28.723122Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:28.313833Z","title":"Complexity for megaprojects in the energy sector,","venue":null,"work_id":"c1645470-0680-4141-bcac-1082934c4b03","year":2017},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.508638Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:0656d27281ad3b35fc494359c0a05e9f366c82a992661747fb93bb7ca6bbdb86","observation_id":"cc34a71a-b0d1-4c14-ba9a-5bb512fcaf88","resolution":{"observed_at":"2026-08-07T12:41:28.460226Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:28.079334Z","title":"Megaproject complexity attributes and competences: lessons from it and construction projects,","venue":null,"work_id":"f508dced-e42b-4c4c-afe9-22f8a6284869","year":2019},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.598867Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:0a0e6d0eadbd501c75af0999709a1b430d957afb0d77d50767306e6c3c05a6b9","observation_id":"85cc0a4c-d5e7-4b7c-a964-190ad08e66af","resolution":{"observed_at":"2026-08-07T12:41:28.210211Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:27.858682Z","title":"Construction practitioners perception of key drivers of reputation in mega-construction projects,","venue":null,"work_id":"66d1ceb8-60e9-42db-a68a-b127f42a9188","year":2020},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.659188Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:8a632e49674a11b924ab2be86c48d4a9dd4112d9a3e91dd136ef87ebea6cac0b","observation_id":"297b81a7-a7e0-4f83-8a56-b0e7033af871","resolution":{"observed_at":"2026-08-07T12:41:27.988546Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:27.676481Z","title":"Innovation potential of megaprojects: a systematic literature review,","venue":null,"work_id":"75c2b490-9ee4-4321-864a-4fa5a8952096","year":2023},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.730858Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:1064f0998b15c7ec175e6dbfa0e0d18f74027c8d2579383d3c90cfd584b5de03","observation_id":"b32a9b42-0001-43fe-8c56-0b51aa2361f3","resolution":{"observed_at":"2026-08-07T12:41:27.740717Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:27.502474Z","title":"Megaprojects redefined–complexity vs cost and social imperatives,","venue":null,"work_id":"47c9fefd-ca75-48ec-9503-c31a2950dd72","year":2018},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.802519Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:976698f99ca720ca6766ddef88136cfaf026f7c7a3537149133128a0c8c88f05","observation_id":"e2128da1-a079-418b-b9a9-0cfe699f6228","resolution":{"observed_at":"2026-08-07T12:41:27.586050Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:27.354804Z","title":"A review of mega-project management research from an organization science perspective: Current status and future directions,","venue":null,"work_id":"1a73df36-8415-44d1-9d4f-916742bc4023","year":2023},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.888101Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:8ec448bbe60e561f43b730d4335bfd70bf57f219abea5aecc6922b8b22e69c34","observation_id":"df0a517f-1c1d-4581-bf57-c3c1762e61b3","resolution":{"observed_at":"2026-08-07T12:41:27.403697Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:27.209386Z","title":"Gaps in megaproject management system literature: a systematic overview,","venue":null,"work_id":"b111507a-2bc5-469e-9169-0b4a1d716b96","year":2023},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:08.953545Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:2c8865e1ef276c097b801b6db32dd034829353605a0c0d64149a7da7d2b0c186","observation_id":"246b9e37-3446-43ea-b7a6-b9cb031be117","resolution":{"observed_at":"2026-08-07T12:41:27.273776Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:27.004529Z","title":"Reconfigurability Measurement in Automated Manufacturing Systems,","venue":null,"work_id":"211016ed-ba99-4330-acfb-422db1358b3b","year":2007},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.028594Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:313f5662af43f64857a55d553379de2ae962765944233ec0ce40067ab07f54ba","observation_id":"c5c46249-79d1-4756-9c4a-2c6565c288b7","resolution":{"observed_at":"2026-08-07T12:41:27.100927Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2013.67136","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:18.241732Z","title":"Powering and Watering Agriculture: Application of Energy-Water Nexus Planning,","venue":null,"work_id":"f43abe88-354f-4a10-9eb8-2f7d64ff7685","year":2013},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.099736Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:6a6a2a23b14ee1cbc51ef9668b98f1011fdabc2d317f7fb6859ba1a641f7510e","observation_id":"28509fad-fd5f-41c8-a960-d201e47b42b8","resolution":{"observed_at":"2026-08-07T12:41:18.368741Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2015.24282","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:17.924745Z","title":"Static Resilience of Large Flexible Engineering Systems: Axiomatic Design Model and Measures,","venue":null,"work_id":"143d86b8-6738-44e6-bc89-06b2b814b01d","year":2015},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.154298Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:684dcca131e9215723cc6a8caa1bf838193bcd2f97125ccc321fd8d0cebcc57a","observation_id":"0174a269-d57f-4f61-93dc-97bfe23947e0","resolution":{"observed_at":"2026-08-07T12:41:18.001102Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:26.819595Z","title":"Static Resilience of Large Flexible Engineering Systems: Part I – Axiomatic Design Model,","venue":null,"work_id":"8be3e5df-2c43-49c0-82a2-f9a6b98f88d2","year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.227744Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:392e6be5f5e561ec6003be9f891649114d6713ef29b4baa9a22a6192837ca6f4","observation_id":"b0f30f16-38e0-4826-8992-f3b38ad47f07","resolution":{"observed_at":"2026-08-07T12:41:26.916976Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:26.627172Z","title":"Static Resilience of Large Flexible Engineering Systems: Part II – Axiomatic Design Measures,","venue":null,"work_id":"c772cabb-853b-4ea9-971c-fe9b95451dc0","year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.300904Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:bebffc2ae884950e6d894a5e5b0bb010a721d6c926f458f5da11447541bd102d","observation_id":"187b2f24-7b09-4d99-a573-ce5f5c7c783b","resolution":{"observed_at":"2026-08-07T12:41:26.721816Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:26.441544Z","title":"Product Degrees of Freedom as Manufacturing System Reconfiguration Potential Measures,","venue":null,"work_id":"8ee5cd43-0b26-4529-a830-fb1a7f1515c4","year":2008},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.367175Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:392cfbd888925a098cf157505d097be121c88feeeb96014d7243dd8840eca4ec","observation_id":"32654be4-2efb-4d45-8e32-c5ad6c06b828","resolution":{"observed_at":"2026-08-07T12:41:26.541273Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:26.219766Z","title":"An axiomatic design approach to passenger itinerary enumeration in reconfigurable transportation systems,","venue":null,"work_id":"f864efc0-1895-473a-bdce-3d946e533e10","year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.440867Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:23af9be57ebb7e0588217a1179ab8a0ed09b2101a1e74af0fbb389c75c3a4581","observation_id":"4cb0efa8-f528-4125-b579-e2affa248401","resolution":{"observed_at":"2026-08-07T12:41:26.309094Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:26.071517Z","title":"An Axiomatic Design Approach to Reconfigurable Transportation Systems Planning and Operations (invited paper),","venue":null,"work_id":"64d39c90-c779-4520-a5fa-49f694dd975a","year":2013},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.506243Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:59430774feb288da45fa9f3133efc37d67314657f83c9229db69d192acd51758","observation_id":"db15ac11-f3f1-417b-b977-baffa0aeffe9","resolution":{"observed_at":"2026-08-07T12:41:26.150200Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:25.880461Z","title":"An Axiomatic Design Approach to Passenger Itinerary Enumeration in Reconfigurable Transportation Systems,","venue":null,"work_id":"dd0b8143-d309-47be-97f3-069af560d258","year":2013},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.582189Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:4e31ae496a416830c1a79cfdb37bb218cb52909f966f4a3e71fc1c9b90475614","observation_id":"6a41b7e3-66b3-4dda-a99c-bb14ec36ef81","resolution":{"observed_at":"2026-08-07T12:41:25.941037Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s40903-015-0013-x","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:16.599709Z","title":"Multi-Agent System Design Principles for Resilient Coordination and Control of Future Power Systems,","venue":null,"work_id":"81c3f521-92af-4a88-a456-b8db34b26c0b","year":2015},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.646479Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:1b55e88693bcc31c11905e9db9d6299489350011ad1b5ca9e4218d3573936279","observation_id":"9c969a79-f0b2-4de7-bf39-bf9b77935d4c","resolution":{"observed_at":"2026-08-07T12:41:16.703201Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:25.782413Z","title":"Multi-Agent System Design Principles for Resilient Operation of Future Power Systems,","venue":null,"work_id":"c984df7a-2724-4dd8-a0ed-8b53da6d24c2","year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.702836Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:3666a74041667b9c947e0f3a5ffe52f529ffe4c375a649fa0fce99422e5f90bd","observation_id":"5d08682a-f637-4cd7-b87a-a1012c0d0d38","resolution":{"observed_at":"2026-08-07T12:41:25.836091Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:25.636604Z","title":null,"venue":null,"work_id":"e2aceb57-fc1d-44ff-9a08-d87643128655","year":null},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.759697Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:96b27b3ad1d6651aa046a2a28525d04c1dbdbd65f756d9bf18db1d4eb2655de5","observation_id":"096bc4de-0c5d-4af6-8d76-925c5fb556f5","resolution":{"observed_at":"2026-08-07T12:41:25.696465Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:25.188810Z","title":"Quantitative engineering systems modeling and analysis of the energy–water nexus,","venue":null,"work_id":"e8ce3e38-c22e-44c3-aabe-7ed479beb4aa","year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.817540Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:aa4e22f01aed7b4b02a505989f11aff1a3858625d5e1aefb50830a868dc57e59","observation_id":"42f9a239-a5c4-4978-a8e9-04e3779cb8e0","resolution":{"observed_at":"2026-08-07T12:41:25.341908Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"8289.2015","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:17.590335Z","title":"Axiomatic Design Based Volatility Assessment of the Abu Dhabi Healthcare Labor Market,","venue":null,"work_id":"286607df-f048-4329-8f42-ba2b99d357fc","year":2015},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.822526Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:fd30e6d2b9ac7b6cc17e62450f6c69a35195cdc9f2ba1dee6d288493a6381039","observation_id":"89ea0629-c8d3-41d4-923d-fbfed1018edc","resolution":{"observed_at":"2026-08-07T12:41:17.699903Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.829381Z","title":"(2024) Collaborative research: Gcr: Convergent anthropocene systems (anthems) - a system-of-systems paradigm","venue":null,"work_id":"9da844fb-6a28-4903-a5f1-3a65884017e8","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.904731Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:f6aed0c5d2984e5f61eaf9fe2f9867d60028aabadcf391b963cb2dff16e155d0","observation_id":"2a18bba4-3c43-4c09-bd1d-25f39c730a1e","resolution":{"observed_at":"2026-08-07T12:41:24.986782Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.697934Z","title":"Big decisions, big risks. improving accountability in mega projects,","venue":null,"work_id":"bec3816b-e650-41cb-ae8d-8274112fcf5a","year":2002},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:10.015794Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:ec7e86c5619103f28e6cf19a47c10c917067ea1e4e6da153d7b75808984f8ca6","observation_id":"4aadf762-820b-4ba8-8343-4f4ff642226c","resolution":{"observed_at":"2026-08-07T12:41:24.727433Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.655484Z","title":"The influence of optimism bias on time and cost on construction projects,","venue":null,"work_id":"e1e3e995-28ab-423d-9f0a-116c1b9b4dc1","year":2021},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:10.138386Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:7a00b97c4fd6f606d1f31cbb18df59112caa44ae369971590d387740aa9598a9","observation_id":"90ef09d4-ad0e-4c9f-983c-55bae714eb77","resolution":{"observed_at":"2026-08-07T12:41:24.672521Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.619539Z","title":"Beyond the socio-economic impact of transport megaprojects,","venue":null,"work_id":"4b2eb2f0-6ebd-43b2-8f3d-1c73cc770f00","year":2021},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:10.241606Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:48d3e35021f963b457d16054e31b66a20c8e086ceca62c56630b0aa2702d8e28","observation_id":"02ce34b1-a206-41d8-9b61-384bc4974550","resolution":{"observed_at":"2026-08-07T12:41:24.634271Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.594010Z","title":"The future of economic decision making in project management,","venue":null,"work_id":"9c13d13c-425e-4cdd-a979-0bd46d036523","year":2020},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:10.386010Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:d3eb6794ddcd4e61bd11250d9d64ca4a598d43e0879a9ebe4358c8bae6d34e9d","observation_id":"69b68982-8f49-42f0-9b19-4d9474985182","resolution":{"observed_at":"2026-08-07T12:41:24.603543Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.567387Z","title":"Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects,","venue":null,"work_id":"bc1aa891-39dc-4ceb-856a-683df10e3caa","year":2018},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:10.548529Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:7608f050425b5da2af9a846432aafd4555e6621d23f309ca6e57225098868266","observation_id":"dc1a15d1-dcd3-4824-a836-d2727962b84c","resolution":{"observed_at":"2026-08-07T12:41:24.578078Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.465041Z","title":"Evaluating megaprojects: From the iron triangleto network mapping,","venue":null,"work_id":"1bece306-ab7c-42b1-bbd9-52c74bf4c8f0","year":2014},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:10.693638Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:cca23237cbee81bf6aae1db5b2905cfa9e6bd94abc67f2ac974be2c198a3a1a3","observation_id":"7feacae7-eea4-4001-a59c-061b95af32d1","resolution":{"observed_at":"2026-08-07T12:41:24.561522Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.268382Z","title":"Options for reducing external costs from freight transport along the brenner corridor,","venue":null,"work_id":"1a097c5a-820a-4f57-992c-89f98e1e27cf","year":2018},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":64,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:10.895821Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:432f203b2063a3116672f65a2b1b549ae81afd9672ef903d3ff109b03bee307a","observation_id":"105aeaee-6101-4990-8926-6b21fe658ffe","resolution":{"observed_at":"2026-08-07T12:41:24.350160Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:24.040458Z","title":"An analytical network process model for risks prioritisation in megaprojects,","venue":null,"work_id":"d386903f-3fb3-416d-bb38-1e29fbc30398","year":2015},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":65,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:11.072834Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:ab811c9b0c6c7fe1bbb2ecbcf20641ceb6cf30d10e62796006148bd2907ef84f","observation_id":"4820e336-6aba-4497-9e10-fc878b05b800","resolution":{"observed_at":"2026-08-07T12:41:24.152145Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2021.31180","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:17.298451Z","title":"A Dynamic System Model for Personalized Healthcare Delivery and Managed Individual Health Outcomes,","venue":null,"work_id":"8e27b185-90a3-47c0-a2a3-a4002817f8f8","year":2021},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":66,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:11.227136Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:fea1e9ec675c70781570642f0b8cc4e487d6b4578266ef55033d02b5d9ef0ce6","observation_id":"4b5508ec-03ff-40fb-b4ed-a32909e740c4","resolution":{"observed_at":"2026-08-07T12:41:17.398216Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:23.918143Z","title":"Navigating institutional demands: Organizational responses to institutional complexity in megaproject delivery,","venue":null,"work_id":"88d588e4-f540-4a3f-8c7f-afac480f5004","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":67,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:11.358551Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:ecb068ac7fa836a65e67d3478b6cb463195f0256b4e885c498776db2707e3cf8","observation_id":"7e85a739-18e2-429d-96a1-003c45afaffc","resolution":{"observed_at":"2026-08-07T12:41:23.974597Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:23.736006Z","title":"Relational network of megaproject governance mechanism based on risk prevention and control: experiences from china,","venue":null,"work_id":"e13d633f-41c4-4fcd-a2c2-837074875ffe","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":68,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:11.485269Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:ca6fb3c7e1388636177120bc6857746a671dc8e248e4dfa1633b16ffb86b550d","observation_id":"be52d2f7-b8c0-460b-a609-116336cdeb98","resolution":{"observed_at":"2026-08-07T12:41:23.807778Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:23.562972Z","title":"Participatory governance in megaprojects: the lyon–turin high-speed railway among structure, agency, and democratic participation,","venue":null,"work_id":"28db70bd-8b83-4b5c-8990-3c611cdec9ea","year":2023},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":69,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:11.649997Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:c1ed852f596c950fa96637dd03b2920b457c614a6768b8ca387c4b16fc391ae5","observation_id":"b23b33dd-0caf-4a90-b5c1-28b6ec878870","resolution":{"observed_at":"2026-08-07T12:41:23.640862Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:23.353605Z","title":"Completing projects on time and budget: A study on the analysis of project monitoring practices using real data,","venue":null,"work_id":"e7cd405c-4f74-43fc-954c-44138aba127f","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":70,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:11.814791Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:7a2214694f44893b205c8e26ac8f0123757ec1b95c7526d58285b36ee9aae397","observation_id":"7de65a1e-f386-4fd5-af6e-e4e1a49db131","resolution":{"observed_at":"2026-08-07T12:41:23.458392Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:23.216531Z","title":"A hetero-functional graph structural analysis of the american multi-modal energy system,","venue":null,"work_id":"fbc5a5bf-4f2a-4245-af2b-9ee1f0012379","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":71,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:12.018230Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:8319b441a4a48a7167222bd7d429de52e59e79811a605dcfaabb5bd2aaad5fa8","observation_id":"2362f949-5fc2-484e-8afe-f34c2c3161a3","resolution":{"observed_at":"2026-08-07T12:41:23.292975Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2012.14486","last_updated":"2021-05-24T17:10:48Z","snapshot_observed_at":"2026-07-06T10:28:22.365158Z","submitted_at":"2020-12-28T21:06:56Z","title":"A Reference Architecture for the American Multi-Modal Energy System","version":2},"cited_work":{"arxiv_id":"2012.14486","doi":null,"metadata_source":"pith","pith_arxiv_id":"2012.14486","snapshot_observed_at":"2026-08-07T12:41:16.976897Z","title":"A Reference Architecture for the American Multi-Modal Energy System","venue":"physics.soc-ph","work_id":"45a9c232-3645-4ea7-95f9-eccd15ab7e27","year":2020},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":72,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:12.250488Z"},"links":{"cited_paper":"/paper/2012.14486","citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:096b8907d5c5554c072bf2f2e836218e936f89c1196522f7d922765dfe320717","observation_id":"ae7316e4-53ca-4e0c-855c-5faa26c61eb3","resolution":{"observed_at":"2026-08-07T12:41:17.105044Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:12.420720Z","title":"Hetero-functional Network Minimum Cost Flow Optimization,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":73,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:12.420720Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:c37bddd3f099b9992ca75f1c6e5da6608c127cf7ebeacd4a3979af163da3103a","observation_id":"f4fdb079-eb5c-4024-b321-caf81421083f","resolution":{"observed_at":"2026-08-07T12:41:12.420720Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:23.042246Z","title":"Collaborative management framework for interorganizational risk in megaprojects based on metanetwork,","venue":null,"work_id":"4c85f7b5-4de3-4bd1-b577-c0777fe17285","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":74,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:12.582662Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:b6cbbff997e9b01ee0510544907e697074c22e7d5e6c9fd8017b86132e5a4d73","observation_id":"f02af8e4-6277-43c7-a618-688d98288730","resolution":{"observed_at":"2026-08-07T12:41:23.140174Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:22.860794Z","title":"Development of a risk breakdown structure in mega projects based on di fferent case studies,","venue":null,"work_id":"899f1308-9416-490b-89cb-33175abdba5a","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":75,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:12.763331Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:82bc3dbf03ff5ff306b9bb67c021276f1ac1d45aac8781cf5f1c45cd0336cb2c","observation_id":"6ccb482c-0da5-4963-bf3b-b1b27409ee60","resolution":{"observed_at":"2026-08-07T12:41:22.963572Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:22.684652Z","title":"Using fuzzy approach in determining critical parameters for optimum safety functions in mega projects (case study: Irans construction industry),","venue":null,"work_id":"56a5844f-4a01-415c-b894-a42e2366e109","year":2022},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":76,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:12.926720Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:7e307f8a2ec89a0129455fadf7f876c8f804b5ee5083369282d78aecc5d468c1","observation_id":"88cc0194-5827-4c38-8818-06dde1e0ae2a","resolution":{"observed_at":"2026-08-07T12:41:22.781488Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:22.487317Z","title":"Combining stakeholder and risk management: Multilayer network analysis for complex megaprojects,","venue":null,"work_id":"ba6c01f9-57be-40c0-b860-73191c7a3ae8","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":77,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:13.136033Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:f575ef352e2e56f4bea00c564a6761f37a69686c24b79551e391d8a605b3b861","observation_id":"608f3ab5-e32f-4dd7-bb7d-97b6c1d07515","resolution":{"observed_at":"2026-08-07T12:41:22.569716Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:22.321237Z","title":"Framework for integrated project portfolio selection and adjustment,","venue":null,"work_id":"80d82d12-4dec-4496-b978-101d3a1d23bb","year":2019},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":78,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:13.289493Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:1dae25bebd7aef6ee001b411d31e4f8fcd4f58398c930dab7470a6e3bc62f3be","observation_id":"64cb1584-9f3b-4f4e-b956-878b9068552a","resolution":{"observed_at":"2026-08-07T12:41:22.427622Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:22.139631Z","title":"Project risk response decision making under uncertain project interdependencies,","venue":null,"work_id":"0a71b37c-9809-48e6-99b4-ca7e43ffbc0a","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":79,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:13.457755Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:5dc3c99d0235dfdc9e2f1d51a946bebec2598fa14dd9f12497da794982d3a31a","observation_id":"a44b99d9-2ebe-428c-8ef7-b4e51b3afd50","resolution":{"observed_at":"2026-08-07T12:41:22.230445Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:21.881401Z","title":"From construction megaproject management to complex project management: Bibliographic analysis,","venue":null,"work_id":"2dbe3a8b-d155-48e4-9dfa-a4b7163f0f7b","year":2015},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":80,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:13.631945Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:dd8a2ebf80f24abafff4c21db25d5fd359a9c6f896605606555dc74cee6df375","observation_id":"b89513c0-0cdf-4122-9797-53d085718d85","resolution":{"observed_at":"2026-08-07T12:41:22.004600Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:21.693960Z","title":"Exploring the both-and success paradox in mega construction projects: multi- dimensional assessments of paradoxical leadership, project agility and megaproject success,","venue":null,"work_id":"fe07d26f-cd4a-4760-a5dd-56d00a4da37b","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":81,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:13.860717Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:3d112a455cd1aea29f49143841023e33041201b7a6055cdaebc765ed934308e6","observation_id":"5da12d3c-a980-47b4-ba74-3178ea0a2686","resolution":{"observed_at":"2026-08-07T12:41:21.779760Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:21.466043Z","title":"Exploring mega-construction project success in china’s vaunted belt and road initiative: the role of paternalistic leadership, team members’ voice and team resilience,","venue":null,"work_id":"ce1fbf62-1c03-4876-afa7-f52b5db80d03","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":82,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:14.052477Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:603ae75ee84c175dac138c494e158611337acb4e76899090d7298a6f6a3f08eb","observation_id":"3d2e4d49-cbe1-4ba7-be2a-5dd466b273b6","resolution":{"observed_at":"2026-08-07T12:41:21.580699Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:21.266780Z","title":"The right stu ff: Identifying and developing e ffective champions of innovation,","venue":null,"work_id":"a31728ae-7b91-4be3-8f8a-32ec18f7bc41","year":2005},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":83,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:14.278486Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:9adbc532420aaa2caa17cf632c11af938e669a905fcf6884899c231f91c29ff5","observation_id":"f36a55d8-1dd0-4695-a11f-0d817c00ddc1","resolution":{"observed_at":"2026-08-07T12:41:21.372409Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:21.077658Z","title":"The demands of industry 4.0 on project teams,","venue":null,"work_id":"02af2e52-1c99-4180-a742-23f64d858f02","year":2020},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":84,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:14.502121Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:1d9553b315a5fd71ed2622c44c3ba0efeaea4c5885290d72a9d6d19679c57de9","observation_id":"04726ce9-cce2-4e40-a705-a1438f30b9af","resolution":{"observed_at":"2026-08-07T12:41:21.148716Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:20.931557Z","title":"Technological innovation and the theory of the firm: the role of enterprise-level knowledge, complementarities, and (dynamic) capabilities,","venue":null,"work_id":"917c34eb-9065-4ffe-9283-e6011d636c1b","year":2010},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":85,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:14.653574Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:1e5859cd8350a384c35f0b0b0edb5eb1e3ee6cb1cdafb7942dd2a7223a61fc32","observation_id":"9f38f510-9c46-4dea-9b90-eb2aede1561e","resolution":{"observed_at":"2026-08-07T12:41:20.996473Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:20.746119Z","title":"A clash of clans: an empirical study of conflicting institutional logics and their impact on megaproject collaboration,","venue":null,"work_id":"aceb5d36-bf77-44db-a1ec-dc963884177e","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":86,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:14.804964Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:87c83aed06dbefee6e5f54e9ff0bbe09f97fba7edd19ee798ce3010bcb0971ec","observation_id":"896b5933-1c77-4890-ab06-79bfcc1b15e2","resolution":{"observed_at":"2026-08-07T12:41:20.850577Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:20.543181Z","title":"Top government hands-on megaproject management: the case of istanbuls grand airport,","venue":null,"work_id":"5aa9001e-7ebe-43a5-b736-a2ac27cb82e9","year":2019},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":87,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:14.952605Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:0ad00039aed87dcb08fa7e838441dc4e704de58d20b749a661c94864f725a2db","observation_id":"86ba4866-d756-4215-817d-9ecc255bcf6a","resolution":{"observed_at":"2026-08-07T12:41:20.634778Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:20.349657Z","title":"Meta-organizing and responsibilization: Government strategies for community engagement and high-quality development in public–private megaprojects,","venue":null,"work_id":"b7708388-113a-4909-821b-7aca102d9a35","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":88,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:15.109917Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:986f1f540ddcc7072923f07752d350855cd0d1c62e4de5f632c52cb3290dacc4","observation_id":"6cc3edda-547a-4a8a-8478-0a787a38a826","resolution":{"observed_at":"2026-08-07T12:41:20.439569Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:20.151397Z","title":"Sense and sensibility: Narrative strategies shaping megaproject development,","venue":null,"work_id":"4a0b1055-76bf-457c-a981-b5a1513f94a2","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":89,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:15.256031Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:989b9909759816ed4b385c714f3fc1a7df00bd6aab10a8e7582018bcf0e13d7e","observation_id":"ab79fd47-d519-41af-8270-356dbc12484b","resolution":{"observed_at":"2026-08-07T12:41:20.246915Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:19.961707Z","title":"Social value for whom, by whom and when? managing stakeholder dynamics in a uk megaproject,","venue":null,"work_id":"cd1aa13f-495d-4161-8a9a-0a1ba6e205f3","year":2020},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":90,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:15.422345Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:333dcdd4690adfb762c9fe1d7db8c448dfedcacaaceff45033169464eb807770","observation_id":"81c6c79a-d119-40b7-a0ff-179092e5a841","resolution":{"observed_at":"2026-08-07T12:41:20.072643Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:19.776410Z","title":"Tackling tensions between project owner and project manager in benefits realization of public projects: A paradox perspective,","venue":null,"work_id":"74e0cfc1-e905-475e-acdb-ba7d991c9edc","year":2024},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":91,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:15.571198Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:ba30be42189200346fb3c66db3c4e0e23f6a8329dfce525918dea0b4f42a278e","observation_id":"2cfda229-1275-4f29-9607-8a0e39e1dd7b","resolution":{"observed_at":"2026-08-07T12:41:19.894343Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:19.570089Z","title":"Old theories, new contexts: Extending operations management theories to projects,","venue":null,"work_id":"b030a8f8-8b2d-4e01-a37f-8092a38685ea","year":2018},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":92,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:15.733319Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:8417cbce5071b0f06e932c73f57f97f00437146ef9386dbee19ada5152161dc6","observation_id":"22192010-cb42-407a-ac87-f3f10a985d85","resolution":{"observed_at":"2026-08-07T12:41:19.690528Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:19.433406Z","title":"Collaborative supply chain management (scm) tools for improved teamwork in construction projects,","venue":null,"work_id":"6590de25-3616-46ec-8f40-cb7c4060c3ff","year":2019},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":93,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:15.841346Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:6173eb510283ffd45607e143190f45f9edbedc87d931228316fb2b1e934b368e","observation_id":"17946ebf-5afc-40ed-882e-297ec06f8bbd","resolution":{"observed_at":"2026-08-07T12:41:19.482356Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:19.215817Z","title":"Creating relational capital through socialization in project alliances,","venue":null,"work_id":"1f9efcf1-4064-4373-8081-f069a3d3ab0d","year":2018},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":94,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:15.993946Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:b8ffe79307f19f3d6e614c808e270225f76000b73c498f9f67acf90b0f6bf35a","observation_id":"ef874ccd-2540-4741-a9f3-cba47f13496e","resolution":{"observed_at":"2026-08-07T12:41:19.327841Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:19.032267Z","title":"The international journal of production research in the past, the present and the future: a bibliometric analysis,","venue":null,"work_id":"7e710daa-ee63-458d-adbe-8075a06e441d","year":2019},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":95,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:16.121731Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:d55b13cae865b70f2c5b7106ed4a6310f12b92d24d0fb20fbb9b06544953de83","observation_id":"d95cd161-6d6a-4806-aaa3-540552d2740c","resolution":{"observed_at":"2026-08-07T12:41:19.094430Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:18.843714Z","title":"E fficiency in project networks: the role of inter-organizational relationships in project implementation,","venue":null,"work_id":"a00549bd-65f1-415f-9535-afb3279302d1","year":2009},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":96,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:16.305614Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:37d476e55a16e08e0b06d1658fe82d499b3af20548961992d3f5a3f284e8dd35","observation_id":"b2c3a1ba-6f70-4da2-a3e1-e3af0d4f30a6","resolution":{"observed_at":"2026-08-07T12:41:18.934673Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:18.540252Z","title":"Innovation in megaprojects: systems integration at london heathrow terminal 5,","venue":null,"work_id":"65bc333a-035a-4be7-a0b2-84a9543d742e","year":2009},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":97,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:16.464290Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:6cc1e01604390befb77b452da70479d67a03df4034ced4131acf478b55fc1510","observation_id":"7f48699f-53c1-4a5d-a67a-bc66524bfa2c","resolution":{"observed_at":"2026-08-07T12:41:18.721914Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:41:25.482786Z","title":"Available: http://ieeexplore.ieee.org/xpl/bkabstractplus.jsp?bkn=5264253","venue":null,"work_id":"b5465cc2-d52f-41cb-8c7f-40b77d0a241d","year":null},"citing_paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects","version":1},"reference_index":2000,"source":"pdf_text","source_observed_at":"2026-08-07T12:41:09.813465Z"},"links":{"citing_paper":"/paper/2505.24045"},"observation_digest":"sha256:ac5b6ae0dffe51463df682772b6116e960eee572c39849bea0f93113cea92754","observation_id":"4faf4b4c-8915-4103-822c-d08280333ab0","resolution":{"observed_at":"2026-08-07T12:41:25.603279Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2505.24045","last_updated":"2025-05-29T22:28:03Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-07T12:34:48.610774Z","submitted_at":"2025-05-29T22:28:03Z","title":"A Hetero-functional Graph Theory Perspective of Engineering Management of Mega-Projects"},"reference_resolution":{"displayed":98,"state_counts":{"malformed_identifier":0,"metadata_mismatch":3,"parse_uncertain":0,"unresolved":23,"verified_exact":3,"verified_fuzzy":69},"total_outbound_references":98},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 98 of 98 outbound references and 0 inbound Pith citation observations for arXiv:2505.24045."}