{"as_of":"2026-08-08T02:54:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:5f451e9b8114cb10c5d4626fc02b3d5dbd391931c35b5cdd2fbf7388c7cb0859","coverage":[{"denominator":36,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":36,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T12:45:07.694833Z","state":"measured"},{"denominator":36,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":36,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-07T06:34:17.273281+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2505.24117/citation-record","integrity":"/paper/2505.24117/integrity","json":"/paper/2505.24117/citation-record.json","paper":"/paper/2505.24117"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:14.594130Z","title":"Bounding excess minimum risk via r´ enyi’s divergence,","venue":null,"work_id":"4b72670c-7fc4-4d86-9984-0b17c2ca61b9","year":2024},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:04.204187Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:dff3708d68c8498b92ce31003171448b7080cd88e58a236200b6d205dd31a0cd","observation_id":"31e46c4d-a869-4fb6-b3d0-5bb21085865f","resolution":{"observed_at":"2026-08-07T12:45:14.734468Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:14.339424Z","title":"On measures of entropy and information,","venue":null,"work_id":"ca0c93c4-a8fe-44d6-b575-7094e96da67d","year":1961},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:04.262683Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:2a5da3a9c5683d96573808786e28791d621c2944e2db59528482f668ef77ddfa","observation_id":"b1cccff3-1ba3-40dd-947c-96374322eb07","resolution":{"observed_at":"2026-08-07T12:45:14.467142Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:14.065522Z","title":"On a generalization of the Jensen–Shannon divergence and the Jensen– Shannon centroid,","venue":null,"work_id":"836efa5c-1291-412e-927d-420d204ae631","year":2020},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:04.366684Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:6d0a1468bad0e18502ee20f1c3b066329d3200f395a8bb462a07a18df77d515b","observation_id":"9398b9c2-c590-43d8-ac95-e1a782188890","resolution":{"observed_at":"2026-08-07T12:45:14.187102Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:13.776754Z","title":"Divergence measures based on the shannon entropy,","venue":null,"work_id":"abf830cd-eb8e-4e9a-9e24-11a4259e5930","year":1991},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:04.503338Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:b2a1ac009b4aa955ce76c02ae93eb6e91fdfda8ce886ac20815289038c945692","observation_id":"458d0424-95b1-4fe9-9a67-2649af49da85","resolution":{"observed_at":"2026-08-07T12:45:13.909916Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:13.524719Z","title":"Information radius,","venue":null,"work_id":"22c86875-41bd-4115-8cb3-5cc5b124b2e1","year":1969},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:04.613206Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:b1a36190b1534dd7667d40c5536c00a677efb19710976e0d4de571ad03e79a52","observation_id":"9f1a90d8-bd3b-4e75-bbab-01020f37509e","resolution":{"observed_at":"2026-08-07T12:45:13.644327Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:13.249407Z","title":"Generalized cutoff rates and renyi’s information measures,","venue":null,"work_id":"20d084ef-89d3-40db-850b-c1f36eb36e21","year":1995},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:04.728135Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:0722bd4f1b8735493549e7c4820d2c5ce794ca7000316265762f53a7083a7db5","observation_id":"f4608615-6199-48d8-9eb6-5e347c110204","resolution":{"observed_at":"2026-08-07T12:45:13.368873Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:12.978674Z","title":"Information-theoretic analysis of generalization capability of learning algorithms,","venue":null,"work_id":"386fbb28-1837-414d-a565-4c8def58cf0e","year":2017},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:04.824761Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:02752fb1c5c1796da69cc07b87b4bd0918f6d74732443e6dac84cccda5059bba","observation_id":"8ca6f926-20f5-49dd-9a69-b78b312171b0","resolution":{"observed_at":"2026-08-07T12:45:13.106411Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:12.693363Z","title":"Tightening mutual information-based bounds on generalization error,","venue":null,"work_id":"2019af9e-ecfc-43e4-9a89-346223efaaeb","year":2020},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:04.934777Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:51143e1d06c1f35faf1dae108c696cd87ecfc6503156af5fe9a5cb8cb84b6308","observation_id":"4aed6cd6-0f7c-48e7-be3e-5eea4a8068c2","resolution":{"observed_at":"2026-08-07T12:45:12.864023Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:12.429661Z","title":"Robust generalization via f- mutual in- formation,","venue":null,"work_id":"14f2066e-998c-4396-8149-bf9f385a0587","year":2020},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.057802Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:bee10c2710cf044c8340d48dadba1f996d4092b4bcf4d313bdd9ded4f5e1c9e4","observation_id":"9d68b508-201a-40a9-880a-fdecc50908a5","resolution":{"observed_at":"2026-08-07T12:45:12.580732Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:12.244044Z","title":"Variational characterizations of sibson’s α-mutual information,","venue":null,"work_id":"ac001b66-f9e1-4f57-967d-f2b8b19f75b3","year":2024},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.151771Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:afb79e867da96f70045729a438023e92a8a5b4be3dc77de804b04bfb281557c5","observation_id":"984a6eee-3e24-4c5a-90fc-c9017e35bf70","resolution":{"observed_at":"2026-08-07T12:45:12.328410Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:12.013028Z","title":"Generalization error bounds via r´ enyi-, f-divergences and maximal leakage,","venue":null,"work_id":"a0781195-c3f4-4f58-85e1-6019a25f9cc8","year":2021},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.304756Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:88a3c60f5b7cb3fea66aead46442d92a001edb2cadc78d685b7c96461375ea77","observation_id":"598d3006-2fb5-4798-b575-c61b7b9a1392","resolution":{"observed_at":"2026-08-07T12:45:12.121332Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:11.745426Z","title":"R´ enyi divergence based bounds on generalization error,","venue":null,"work_id":"cce2e34e-6924-41df-b333-f0606d448954","year":2021},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.405196Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:7a1f0391d0fe4937972f4570ae2376a961c5306bc5b1101ff088baca23f6ea59","observation_id":"55f6bdf0-5a1f-4bc4-83dc-9191bc44bd1a","resolution":{"observed_at":"2026-08-07T12:45:11.904346Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:11.543209Z","title":"Understanding estimation and generalization error of generative adversarial networks,","venue":null,"work_id":"ed6247bd-ee0f-4d6d-b54a-4a69f87b6a02","year":2021},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.556965Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:7b5c8547ec380267b253619378ba1de198defd55b2c1e6eb7aad2a7832fadf35","observation_id":"5a553289-aa76-4d0e-82b7-b4b032057a4e","resolution":{"observed_at":"2026-08-07T12:45:11.654497Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:11.322770Z","title":"Minimum excess risk in bayesian learning,","venue":null,"work_id":"bb8731ee-b78b-49db-9867-f9c1bf0822a2","year":2022},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.653484Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:839f7470af2d751fb11f786632652a114fb899644fb78a46de3200ec3caa2a86","observation_id":"b87338ba-abb8-4ba5-96c1-6a7bd9e20b11","resolution":{"observed_at":"2026-08-07T12:45:11.426721Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:11.148651Z","title":"Lossless transformations and excess risk bounds in statistical inference,","venue":null,"work_id":"df416534-0111-40ef-91a4-0adfd5fe2988","year":2023},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.762864Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:d4438f60ff244d056d34137116d122232e30dedb4f0f161e3869bc4cc0c951e1","observation_id":"69a486bd-4363-41fb-9b25-b65f690841bb","resolution":{"observed_at":"2026-08-07T12:45:11.208274Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:10.995763Z","title":"Information-theoretic analysis of min- imax excess risk,","venue":null,"work_id":"5f732504-3c7a-464e-9413-ea460b633a07","year":2023},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.837403Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:7edb072c172139de8bd64db614e4ec950cdef8adb176931e11772bfacd527e28","observation_id":"ca46b65d-cbf8-4679-a7ed-932602c50875","resolution":{"observed_at":"2026-08-07T12:45:11.094134Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:10.825365Z","title":"Information- theoretic characterizations of generalization error for the gibbs algorithm,","venue":null,"work_id":"2aa89bff-26e0-41bb-be2b-7886012996b3","year":2023},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:05.924771Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:b371607e0ff972d6c85648d311874d4a8297c56914e28b5228dacd65768b079e","observation_id":"c5558ee7-7525-43e3-bb5f-0b46b0e412dc","resolution":{"observed_at":"2026-08-07T12:45:10.904481Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:10.656656Z","title":"Learning algorithm general- ization error bounds via auxiliary distributions,","venue":null,"work_id":"f9e0fc90-6328-4bb8-80b1-2e6e35713f86","year":2024},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.014772Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:d25199542c3b0e55931c8c71764f03233ec47057cd742582db51bcccab08df0a","observation_id":"ed39310d-3005-4305-a6f5-d65d23449688","resolution":{"observed_at":"2026-08-07T12:45:10.730535Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:10.496897Z","title":"Variational representations and neural network estimation of r´ enyi divergences,","venue":null,"work_id":"5570e7f8-fcfe-440f-bd32-cf9724494fdf","year":2021},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.114740Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:9d26e52c1752b9bb5fbd3fdaae6470660a076ddc7ce6646406594017c7103654","observation_id":"5d514fd9-5839-450f-bcf6-a4cabb18e55c","resolution":{"observed_at":"2026-08-07T12:45:10.588623Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:10.359648Z","title":"Robust bounds on risk-sensitive functionals via r´ enyi divergence,","venue":null,"work_id":"cc37e2f0-04db-4ac1-8101-cc9496b8f718","year":2015},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.155034Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:395699e193eb2f47029198c04353306a1d44c0ee543f17e09a82890d622a6232","observation_id":"b6a26174-7437-4749-9832-b2ea609981fb","resolution":{"observed_at":"2026-08-07T12:45:10.405703Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:10.234426Z","title":"A variational characterization of r´ enyi divergences,","venue":null,"work_id":"87a3ff82-5e2a-4318-a5f3-f346099bb9d9","year":2018},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.214132Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:7b1e0bd8f3d8da73ff71bf7b5054a799037e42fe2b68526c8369cc14f0b804aa","observation_id":"e773e3e7-bb5c-448b-aecb-9a50ecfc6ebc","resolution":{"observed_at":"2026-08-07T12:45:10.285950Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:09.988269Z","title":"Information-type measures of difference of probability distributions and indirect observations,","venue":null,"work_id":"51ed16a7-040b-440d-945d-e5622e34111f","year":1967},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.269878Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:30fbe7a1baed511b2e41d605f28ab6511707fab83af91731da85b096123946ea","observation_id":"22412b67-10a3-48ee-9f37-ff02beb186f7","resolution":{"observed_at":"2026-08-07T12:45:10.135062Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:09.845464Z","title":"Divergence measures based on the shannon entropy,","venue":null,"work_id":"64058471-a936-4519-899e-610b5b98e2d1","year":1991},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.289294Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:27bb3fad468fdce0c1de0855619b78290571d734def295b5506a3d28c564739d","observation_id":"aef1789c-06d3-4cd5-abeb-7cbdb615a9dd","resolution":{"observed_at":"2026-08-07T12:45:09.922335Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:09.685840Z","title":"Pac-bayesian model averaging,","venue":null,"work_id":"2d79aebb-0568-468f-bc35-07d84825d03c","year":1999},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.359452Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:c1d5ff5e4280cf91ff838551bc35f5c0e6d84eb14ec72686e31943529ae2eace","observation_id":"f7ce28f9-6bba-48e1-b008-45d2140d528b","resolution":{"observed_at":"2026-08-07T12:45:09.764744Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:09.494604Z","title":"Properties of variational approximations of gibbs posteriors,","venue":null,"work_id":"764e7a2f-b389-4713-ba90-10f4ec85025a","year":2016},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.444833Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:fe5c9251ce9e50d11d76993693d107436bb08f9bfaefe38c2968887971f6f172","observation_id":"76d91182-058e-4de2-94f3-576d8bdc6146","resolution":{"observed_at":"2026-08-07T12:45:09.583876Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:09.259168Z","title":"Generalization bounds via wasserstein distance based algorith- mic stability,","venue":null,"work_id":"e5ae845e-3b81-4ef9-a8b4-15f27e1c801e","year":2020},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.605082Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:45d7daa84ed373a70e74aba84a73d068f6b119de79193c24038ce6fcf2d71562","observation_id":"5a2a524c-b0ca-4413-adf9-abb4b9d35686","resolution":{"observed_at":"2026-08-07T12:45:09.349250Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:09.117761Z","title":"Addressing gan training instabil- ities via tunable classification losses,","venue":null,"work_id":"f38a22ab-5011-4315-bc28-9eeadb7f8293","year":2024},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.724763Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:60f08a2fa74e8fc9e1e7656f79fadc08fe55ebd4e25447d678b55de11c86ce6e","observation_id":"a446b34e-4df7-4844-98b8-a3ea87a4c6d0","resolution":{"observed_at":"2026-08-07T12:45:09.209717Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:08.916814Z","title":"Generative adversarial nets,","venue":null,"work_id":"554f2862-ad1c-4a34-be27-bf8c6e1a1e6f","year":2014},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:06.970569Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:fc87435064d098ee9ff05acb23ee304d28927fa1493d06084408d228cbd8c425","observation_id":"d77e4a28-625d-42f1-a634-7dcbcc955a36","resolution":{"observed_at":"2026-08-07T12:45:09.028578Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:08.761415Z","title":"Asymptotic evaluation of certain markov process expectations for large time. iv,","venue":null,"work_id":"8bc371ac-c28c-40bb-bef9-c360eb408820","year":1983},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:07.074753Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:d8ac6b00f86bebdea04a85b28c93b555de76a14cfbedb29c5b20cb1866f07875","observation_id":"c14fde93-7f96-4eb9-8dec-52dc1e7435df","resolution":{"observed_at":"2026-08-07T12:45:08.863629Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:08.577442Z","title":"R´ enyi divergence and kullback-leibler divergence,","venue":null,"work_id":"80f82af1-e5d7-4b97-aa66-bdf44a91c1ee","year":2014},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:07.154826Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:dbec59c02cd5f12b36ed335f807e6ef2d222ef8327cbc7d06974a340944befef","observation_id":"a437c8f2-f9c3-46bf-a300-b4cbdacd1190","resolution":{"observed_at":"2026-08-07T12:45:08.700264Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:08.397716Z","title":"α-mutual information,","venue":null,"work_id":"5eed460e-680d-4f03-b077-3eb8a9714e2e","year":2015},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:07.274756Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:442a970970e775130fadd964bac7444a0b86e423a7c3e63bb6a9d32a1d9c1a0f","observation_id":"4393f498-28a4-43c6-91d9-cecd8117b7ca","resolution":{"observed_at":"2026-08-07T12:45:08.459171Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2405.08352","last_updated":"2025-07-11T00:52:00Z","snapshot_observed_at":"2026-07-06T18:13:59.779068Z","submitted_at":"2024-05-14T06:45:27Z","title":"Sibson $\\alpha$-Mutual Information and Its Variational Representations","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2405.08352","snapshot_observed_at":"2026-08-07T12:45:07.339719Z","title":"Sibson’s α-mutual information and its variational representations,","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:07.339719Z"},"links":{"cited_paper":"/paper/2405.08352","citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:7d3cb4149ffe01d16e1afa835c5639a9b3b51a036076d8d38bd60b341eb4e67d","observation_id":"5238bf58-811d-41ef-9809-90fa5aacd67b","resolution":{"observed_at":"2026-08-07T12:45:07.339719Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:07.424746Z","title":"Probability inequalities for sums of bounded random variables,","venue":null,"work_id":null,"year":1994},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:07.424746Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:10fcc6ae28c08e3714b12c562432d3b60f4731b281fe7bbb2e0c2c07ac92483c","observation_id":"87644a8c-5332-47e4-b35a-92a0550eddec","resolution":{"observed_at":"2026-08-07T12:45:07.424746Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:08.276234Z","title":"Lautum information,","venue":null,"work_id":"4ea0f4a2-bc73-42e1-afb8-b83a03923173","year":2008},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:07.564750Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:53e194facb80f70ae504e41cb5050f6d019596f15a6de3777bbb3d50cba3ad4d","observation_id":"ceb70c74-0544-4577-ab92-8658741a14f7","resolution":{"observed_at":"2026-08-07T12:45:08.336887Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:08.044425Z","title":"Sub-gaussian random variables,","venue":null,"work_id":"cf8c395e-3f10-4f1b-ba85-8c27c1496509","year":1980},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:07.625786Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:e3295feb2bed1e501410b664d5f419d819cec8dc482c978b09ac99083ae811c0","observation_id":"8e76093e-3451-4eb2-a5f2-4839621ecf8a","resolution":{"observed_at":"2026-08-07T12:45:08.194517Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T12:45:07.878314Z","title":"Subgaussian random variables: An expository note,","venue":null,"work_id":"a0707c27-a24a-44ee-ae21-da02a5bd4560","year":2012},"citing_paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-07T12:45:07.694833Z"},"links":{"citing_paper":"/paper/2505.24117"},"observation_digest":"sha256:844023737db65dd9120eef67d18a46f2d679daef179a75271de39f5a7888457e","observation_id":"5c16f27d-c098-4512-870c-e86ecee697e8","resolution":{"observed_at":"2026-08-07T12:45:07.957771Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2505.24117","last_updated":"2025-05-30T01:28:18Z","latest_version":1,"primary_category":"cs.IT","snapshot_observed_at":"2026-08-07T12:32:04.226443Z","submitted_at":"2025-05-30T01:28:18Z","title":"Bounds on the Excess Minimum Risk via Generalized Information Divergence Measures"},"reference_resolution":{"displayed":36,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":2,"verified_exact":0,"verified_fuzzy":34},"total_outbound_references":36},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 36 of 36 outbound references and 0 inbound Pith citation observations for arXiv:2505.24117."}