{"as_of":"2026-08-08T05:54:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:bbc19a9adde08a7b3a12e4a2dda9ce47b146fd3b4c73f92ab822927bb2c1739a","coverage":[{"denominator":23,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":23,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T11:37:16.829578Z","state":"measured"},{"denominator":23,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":23,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-07T06:34:17.273281+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2506.02193/citation-record","integrity":"/paper/2506.02193/integrity","json":"/paper/2506.02193/citation-record.json","paper":"/paper/2506.02193"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1109/mis.2017.6","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:17.379547Z","title":null,"venue":null,"work_id":"751c3872-e866-4e4e-aa9e-bc4e532969d3","year":2017},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:15.647672Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:bfff67525895c4fd6fdc55829371ca444d108bd92dd3a3feee93a1572db1ccbe","observation_id":"f6962ada-754a-442e-b98f-8c258df696ee","resolution":{"observed_at":"2026-08-07T11:37:17.443492Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2002.00451","last_updated":"2020-08-11T18:00:44Z","snapshot_observed_at":"2026-08-07T22:37:04.736538Z","submitted_at":"2020-02-02T18:35:09Z","title":"Fair Allocation Based Soft Load Shedding","version":3},"cited_work":{"arxiv_id":"2002.00451","doi":null,"metadata_source":"pith","pith_arxiv_id":"2002.00451","snapshot_observed_at":"2026-08-07T11:37:18.377916Z","title":"Fair Allocation Based Soft Load Shedding","venue":"eess.SP","work_id":"aa1be7bb-eabc-422a-868d-86471bbcbdc5","year":2020},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:15.711788Z"},"links":{"cited_paper":"/paper/2002.00451","citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:e88315725534b67b0f30f771d6310e29030cc0b88149019ab44ac06b6ac80c3e","observation_id":"509cf0a3-a3dd-4b46-9996-54d15ecad234","resolution":{"observed_at":"2026-08-07T11:37:18.458532Z","resolver_source":"local_arxiv","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2019.88204","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:18.137793Z","title":"2019 6th International Conference on Con- trol, Decision and Information Technologies, CoDIT 2019 p","venue":null,"work_id":"ca641777-0bce-4d4e-b1aa-790ef894d03e","year":2019},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:15.780405Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:b80203995b36e8fdef15305cbdc73a02fa001de99502f71347d335e0ca4c2f99","observation_id":"a0dca6ed-346b-4d32-88b5-ed4879943a15","resolution":{"observed_at":"2026-08-07T11:37:18.231523Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/978-3-031-71033-9_27","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:17.258281Z","title":"15156, p","venue":null,"work_id":"31fd5351-4b60-44cb-a682-31df18517636","year":2024},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:15.826186Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:067b34181daa32a58b4b9548154975db7ec6358ed375ff252d7907dce1f23d9c","observation_id":"5762ab61-8885-4bfd-bfd0-1774c1c67f2a","resolution":{"observed_at":"2026-08-07T11:37:17.292813Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2311.16742","last_updated":"2025-01-18T09:37:28Z","snapshot_observed_at":"2026-08-06T01:19:40.574274Z","submitted_at":"2023-11-28T12:41:42Z","title":"$k$-times bin packing and its application to fair electricity distribution","version":3},"cited_work":{"arxiv_id":"2311.16742","doi":"10.48550/arxiv.2311.16742","metadata_source":"pith","pith_arxiv_id":"2311.16742","snapshot_observed_at":"2026-08-07T18:16:16.850658Z","title":"$k$-times bin packing and its application to fair electricity distribution","venue":"cs.DS","work_id":"908afc54-3d08-4f3d-901e-22f0a2af9a4e","year":2023},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:15.892584Z"},"links":{"cited_paper":"/paper/2311.16742","citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:27d155ed306de259960b227bad874aecdef15a044688f35b6ab4cb3e879b00fc","observation_id":"52bf8b81-863a-4b2f-9e79-ddab49f44783","resolution":{"observed_at":"2026-08-07T11:37:17.179870Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:20.401902Z","title":null,"venue":null,"work_id":"0bd4debd-ba07-46ba-810b-b4bcd4fac5f1","year":2025},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:15.961481Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:fb4f29515e9ea7906046ac9096c7f285a8215ac40d58d7ca7c2faae55b688c61","observation_id":"ed63d6db-076d-4242-9186-b13872d0ecb6","resolution":{"observed_at":"2026-08-07T11:37:20.536024Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:20.216933Z","title":"Pro- ceedings of the International Joint Conference on Autonomous Agents and Multiagent Systems, AAMAS 2020-May(Aamas), 204–212 (2020), citation Key: Buermann2020","venue":null,"work_id":"8a908a2e-d9e0-47e1-89e0-423f6ddfbfcb","year":2020},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.002480Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:4fff12f4ef6925a306c3905ac3e512eafd98730cca748efcbc0015c6704335db","observation_id":"aba38f0c-00f9-4d75-a798-68f9166ab934","resolution":{"observed_at":"2026-08-07T11:37:20.314652Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:20.062211Z","title":"In: Latin American Symposium on Theoretical Informatics","venue":null,"work_id":"b3196750-6fb5-4517-a287-35cc578cc2dd","year":2024},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.056882Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:9b6114f6d42cf583d140aa939f7d50b01028f61c88b075e3c09731e7c325645e","observation_id":"53c83b1a-b3ec-424c-a6df-e9feab93afa0","resolution":{"observed_at":"2026-08-07T11:37:20.141741Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:19.883668Z","title":"In: Proceedings of the Twenty- Eighth International Joint Conference on Artificial Intelligence","venue":null,"work_id":"f5363978-85f3-4a31-8a6e-1419be308d2a","year":2019},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.106475Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:fe8994fe4480a432580a23be0e13fc43cbd49049ee29303af1c89c06f6230583","observation_id":"f1f9e4a0-d453-4f03-977b-9aa3c436e85e","resolution":{"observed_at":"2026-08-07T11:37:19.990005Z","resolver_source":"raw_fallback","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:19.751577Z","title":"In: Proceedings of the AAAI Conference on Artificial Intelligence","venue":null,"work_id":"091f0c7e-f57e-4cea-94b5-d7c9f4089804","year":2025},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.137117Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:109ec6d12160a3752ec4a5d6c01645cd39b2b7ea010fc63b06a8bc3205d875c1","observation_id":"fb5df3a9-c1dd-49d0-884a-48bcf0df09f7","resolution":{"observed_at":"2026-08-07T11:37:19.779435Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:19.537588Z","title":null,"venue":null,"work_id":"b9cee512-2ec5-48a6-8fd5-6029eda3ea53","year":2025},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.201552Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:08e6f32911cab9c2f600c5c9fbf7f4566962cd7e46b668e64427d5d1480e87ad","observation_id":"18a633d4-ac89-4917-80ff-86698858289c","resolution":{"observed_at":"2026-08-07T11:37:19.637102Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:19.381415Z","title":null,"venue":null,"work_id":"9189a568-9260-4b77-938c-9033baa9234a","year":2025},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.266785Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:4419a8b7689ccb662e27273563fe48faa5102916eb56a2d50398d9d4bce5a2d2","observation_id":"68fc1297-b507-42e1-8413-3a1f45b34899","resolution":{"observed_at":"2026-08-07T11:37:19.435689Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.3390/app11115084","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:17.016103Z","title":null,"venue":null,"work_id":"f174f41a-e3e7-4e84-ad9d-b0cacd0150fb","year":2021},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.309735Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:fc02f18a84ba5ca58f47c5ed969c088201123bb45c97f16fc1ef7f039c951684","observation_id":"41bfcce6-d12b-4451-9963-ddddc07f8c83","resolution":{"observed_at":"2026-08-07T11:37:17.049128Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:16.366440Z","title":"Renewable and Sustain- able Energy Reviews16(2), 1116–1126 (2012).https://doi.org/10.1016/j.rser.2011.11.013, citation Key: Kaygusuz2012","venue":null,"work_id":null,"year":2012},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.366440Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:67bb3caad0792d59e04c06701949596a55aa73180b6da89ce7e8897ed65a4a9a","observation_id":"ae77e2a2-4e9f-4808-a5f4-a51a5a5c3770","resolution":{"observed_at":"2026-08-07T11:37:16.366440Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.24963/ijcai.2018/220","metadata_source":"doi_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:16.904991Z","title":"In: Proceedings of the Twenty-Seventh International Joint Conference on Artificial Intelligence","venue":null,"work_id":"ed10b4bf-87cc-40eb-8efd-91d53f5d108b","year":2018},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.414263Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:7723e3d6772ab4a73a044fedb072e798d67202520cefab1f9fac30c3be7bc526","observation_id":"cf808ed7-b7d3-4fcb-85d3-5cbffb4f1f47","resolution":{"observed_at":"2026-08-07T11:37:16.950392Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:16.464767Z","title":"Autonomous Agents and Multi-Agent Systems34(1), 12 (Apr 2020).https: //doi.org/10.1007/s10458-019-09428-8","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.464767Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:130b05d3c14f6f4d9a801ad3ecc0081946172e62d4ba2ba1ba872662d1909954","observation_id":"9f8e074e-8fbb-4a87-904e-1b5cf69c1080","resolution":{"observed_at":"2026-08-07T11:37:16.464767Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:19.160386Z","title":"Energy, Sustainability and Society p","venue":null,"work_id":"ae696717-1d78-4a47-815d-0f05185ed0f2","year":2012},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.518237Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:d7ee24c360b983eb6c82f02f9feaee66318d0e31c2408d059d8091f286e3de27","observation_id":"7449db0c-81f0-4427-9871-b3f380eb3d4a","resolution":{"observed_at":"2026-08-07T11:37:19.259809Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"5008.2013","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:17.839901Z","title":"Electric Power Components and Systems41(9), 879–895 (2013).https://doi.org/10.1080/ 15325008.2013.792884","venue":null,"work_id":"3b5a6f0c-ab6d-4182-b412-3bc9a874124b","year":2013},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.559316Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:dd6b6f862af1066343c27d7732fc0f25530981db80ead127fd816e6602e2915d","observation_id":"98a558da-c1d4-49bd-9a41-967f47b0c8c3","resolution":{"observed_at":"2026-08-07T11:37:17.935735Z","resolver_source":"raw_fallback","status":"malformed_identifier"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:16.614216Z","title":"International Journal of Electrical Power and Energy Systems67, 582–590 (2015).https: //doi.org/10.1016/j.ijepes.2014.12.041, citation Key: Shi2015","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.614216Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:c1090395539751df778add08d64b5d473ea0fd9f1fa6960032e6825f4a6cc11b","observation_id":"0c9a0ab6-ce0a-42e7-87cd-a7d7732a1625","resolution":{"observed_at":"2026-08-07T11:37:16.614216Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"statistics/1122838","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:17.587151Z","title":null,"venue":null,"work_id":"ef297119-d97c-4e78-a5cb-0b7358c4c9aa","year":2025},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.669391Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:043660269b2c39f5bdb6e7b91848a50e9353ca1f8c5ae33cd491a5975b8652b8","observation_id":"2f877383-b873-46b8-9f6a-cc55e599b4dc","resolution":{"observed_at":"2026-08-07T11:37:17.678526Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:18.961101Z","title":null,"venue":null,"work_id":"8a3b99c2-0d39-4594-be64-899f0ada0a0b","year":2025},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.707461Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:7b742987da738cb2f03ba84116a77aafdf9906a3d0f030e9aea936dcb1cde06f","observation_id":"8bd0a666-49a2-48d1-bb5f-91c231f0afdb","resolution":{"observed_at":"2026-08-07T11:37:19.039047Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:18.765744Z","title":"11th International Conference on Autonomous Agents and Multiagent Systems 2012, AAMAS 2012: Innovative Applications Track2(June), 568–575 (2012), citation Key: Stein2012","venue":null,"work_id":"aad28bff-5f9e-43f2-8679-3d91e2d14523","year":2012},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.765542Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:4d2426e236f159c14ff17f50ccff7a295d82fed2b3def531ca5e64395d10beae","observation_id":"fcece9a5-62cd-481e-9698-94c78ef93d2b","resolution":{"observed_at":"2026-08-07T11:37:18.821105Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:37:18.546171Z","title":null,"venue":null,"work_id":"cd049ebb-fa8d-4e84-9a69-e1171f523884","year":2001},"citing_paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T11:37:16.829578Z"},"links":{"citing_paper":"/paper/2506.02193"},"observation_digest":"sha256:aac30836451085afed4000009899406e22a2f3787e8f10bd56677c1b7346439f","observation_id":"887f687b-0848-43c0-9eae-88068609933b","resolution":{"observed_at":"2026-08-07T11:37:18.645738Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-07T06:34:17.273281+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2506.02193","last_updated":"2025-06-02T19:30:03Z","latest_version":1,"primary_category":"cs.GT","snapshot_observed_at":"2026-08-07T11:26:31.825274Z","submitted_at":"2025-06-02T19:30:03Z","title":"Fairly Wired: Towards Leximin-Optimal Division of Electricity"},"reference_resolution":{"displayed":23,"state_counts":{"malformed_identifier":2,"metadata_mismatch":2,"parse_uncertain":0,"unresolved":8,"verified_exact":6,"verified_fuzzy":5},"total_outbound_references":23},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-07T06:34:17.273281+00:00","source":"crossref"},{"observed_at":"2026-08-07T06:34:11.927384+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 23 of 23 outbound references and 0 inbound Pith citation observations for arXiv:2506.02193."}