{"as_of":"2026-08-08T16:11:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:9c395199eb6bde523a9ff5109fa01a7e2ec8e598e4587a3ef9992abd0333bb17","coverage":[{"denominator":73,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":73,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T11:32:18.118565Z","state":"measured"},{"denominator":73,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":73,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2506.02214/citation-record","integrity":"/paper/2506.02214/integrity","json":"/paper/2506.02214/citation-record.json","paper":"/paper/2506.02214"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:31.060837Z","title":"A dataset is a collection of structured or unstructured data used to train or evaluate an AI model's performance","venue":null,"work_id":"f1eb753c-1c5b-4f46-9a55-800b3c4abbd3","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:11.933348Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:bd637b521bdd3d0868396939767e26bc5751b2777d8c400590bf92965b9c34b9","observation_id":"3ac5ac51-18ae-46c8-b037-89b9cb116713","resolution":{"observed_at":"2026-08-07T11:32:31.150594Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:30.847529Z","title":"Ensure transparent communication with stakeholders regarding data privacy, compliance, and ethical concerns","venue":null,"work_id":"84ce7092-e9e5-4ee4-b816-0576df3d9cf3","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.014805Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:ca75e27c584357b413c2fee876af3a638e270e09ccbc9457dd90bafe05d69cf4","observation_id":"18412766-1cde-4e25-817f-cd44851c9171","resolution":{"observed_at":"2026-08-07T11:32:30.928018Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:27.869078Z","title":"Artificial Intelligence Market Size, Share & COVID -19 Impact Analysis, By Technology, By End -User Industry, By Application, and Regional Forecast, 2025–2032,","venue":null,"work_id":"64db1c62-c393-49aa-ac61-a2130e55ab25","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.557639Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:64cea872c9b2395d4f46b9bdfad1cfe1f5de82983cbdda3235f34364fc0d07d2","observation_id":"807eff51-9e5a-4f37-ad25-ea23f75ddc17","resolution":{"observed_at":"2026-08-07T11:32:27.958834Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:27.727896Z","title":"Project Management Evolution: From Traditional IT Implementations to AI-Driven Projects,","venue":null,"work_id":"1ca9b97b-6550-4b68-a6a9-f611c5812049","year":2023},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.608566Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:573751494a06445ffce4522c7792e118f2d4d85304aa047234af7578e49dba3b","observation_id":"893631d9-80d0-43e1-bf22-e4fe5d771109","resolution":{"observed_at":"2026-08-07T11:32:27.801804Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:30.687505Z","title":"Black Box problem","venue":null,"work_id":"b349b30f-f691-4820-a8af-9f6cc7c16848","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.116242Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:48b57357f9374ed9bc59de44bcd91dc8ecac99dcaf3d3d1af31fdd050de092ed","observation_id":"d96c33fb-bcfd-4602-b6e8-93e1aa51efc3","resolution":{"observed_at":"2026-08-07T11:32:30.761849Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:30.555096Z","title":"unknown unknowns","venue":null,"work_id":"8ca72b29-c438-4dde-8c5e-7654b2b5cce9","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.212007Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:3f9c4e2ae6518c17c57cda4e886e7f246c0b82f898e14124933cc7ccc8a2a4fd","observation_id":"0ac66cb3-65c4-4b0b-a28d-47a6c70fe5e6","resolution":{"observed_at":"2026-08-07T11:32:30.615843Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:27.126509Z","title":"Playbook for Project Management in Data Science and Artificial Intelligence Projects,","venue":null,"work_id":"7628d01c-9e03-44fa-b293-554c6e69fab0","year":2020},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.847459Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:506e4b49629287b5c62d5d8896f32545b41b041e62141aa2210c0ba1ce0cd594","observation_id":"c4c73801-1edb-43ce-b46c-de22bd040ba4","resolution":{"observed_at":"2026-08-07T11:32:27.193923Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:26.919332Z","title":"Managing artificial intelligence projects: Key insights from an AI consulting firm,","venue":null,"work_id":"bcedfcde-a906-42b6-a519-3c4fdd91e989","year":2023},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.920723Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:76373b0a24d148e2dbe63c8d94a931c39ba8d726c5952a7b586d074ab6a56a3d","observation_id":"9c55a336-509e-4d93-9278-8b2d38fed46e","resolution":{"observed_at":"2026-08-07T11:32:27.000009Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:30.041959Z","title":"Metrics: Establish AI quality evaluation criteria, continuously measure accuracy, performance, reliability, explainability, bias, and fairness, and align with business performance","venue":null,"work_id":"a38386fe-22e0-4b69-a3bb-37eb1672c147","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.520197Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:8289aa5d9caf344898dc18096f6f740049038f2b510b2db83139084e94b13768","observation_id":"16be1e25-bbb1-44b0-8694-daafba62680d","resolution":{"observed_at":"2026-08-07T11:32:30.151023Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:29.843601Z","title":"These benefit from continuous refinement based on user feedback and evolving needs","venue":null,"work_id":"f8888820-b9eb-4ae0-bdcc-b5871c334f40","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.618191Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:b127fefa9575dfb0f11ec92fca3fb1e7945bd01187556b1e76a60987536dc6ab","observation_id":"66b7fc8d-63bd-4d64-872b-d1f43b31ee16","resolution":{"observed_at":"2026-08-07T11:32:29.936280Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:29.657742Z","title":"Balancing two traditional software developments with experiment-driven AI component research is necessary","venue":null,"work_id":"c12e8f9e-32e4-48eb-9da5-e6bd5e42b7bb","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.692840Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:58ad7521234eaaa2fe981e54a8e97334f29adee6ad8febc15e279933cef3fa4e","observation_id":"0e49a80b-14a1-42c3-a9a7-25a71d998313","resolution":{"observed_at":"2026-08-07T11:32:29.737247Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:26.363838Z","title":"How to Train an Accurate and Efﬁcient Object Detection Model on any Dataset,","venue":null,"work_id":"17995fbe-c975-40d0-9398-4a19fa58b470","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.179261Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:0e54f3389fe107e582ba9710ac81fe544013bbf47306e085d071bb5e5fa30430","observation_id":"23c5288a-c1ce-4abf-bb0e-3a10dff6a181","resolution":{"observed_at":"2026-08-07T11:32:26.435605Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:29.384310Z","title":"Establishing feedback loops and metrics that enable continuous refinement of AI models is also essential","venue":null,"work_id":"9a713425-963d-4a13-b04f-c45c6bf62e42","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.902755Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:b54e0c4e939080e0c96684407ee31aa170c5c2e17c7ce61ece6f33a46c8924ec","observation_id":"e1d06c42-868b-4e5d-b95c-4c00ca7eebef","resolution":{"observed_at":"2026-08-07T11:32:29.474767Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:29.162577Z","title":null,"venue":null,"work_id":"6504fef4-df19-4d99-a1a8-fbeb9fd813b6","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.988294Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:68d0f72e00e55bc9f434f3305a5edefbef6136711a57fb568badf13b7927fce1","observation_id":"45a17e65-0d26-4a3c-a32c-e3f2b946f68a","resolution":{"observed_at":"2026-08-07T11:32:29.286316Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:28.942658Z","title":null,"venue":null,"work_id":"816415ce-4bd1-410c-acb0-22229801138a","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.077718Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:3ccb976127ca913d222c1f7127b0a5964687851c5557444afa662875f4eed643","observation_id":"366b9998-89f4-4ede-86fd-efc573f12c7a","resolution":{"observed_at":"2026-08-07T11:32:29.011441Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:28.764652Z","title":"Its impact goes beyond technology, influencing individuals, societies, and the environment","venue":null,"work_id":"d1519963-f56a-4267-88bb-c99ef21c10f2","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.227901Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:b0fb4a162a50b3f31dc25bb6e29768a69b746429846e401b16953229c6c652e4","observation_id":"34954ae3-2ea3-452e-ba00-085fa9bef920","resolution":{"observed_at":"2026-08-07T11:32:28.849560Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:28.621030Z","title":null,"venue":null,"work_id":"a76ada14-b66d-4110-8527-c5160114985c","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.315161Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:45421c4501cf9615b579d4bf09096ad73e2d954b3a523718feffc567d6762c70","observation_id":"e864b2f3-0d7d-489c-9c5f-4dcdbb95df42","resolution":{"observed_at":"2026-08-07T11:32:28.676086Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:28.397049Z","title":"Domain Recommendations Promote transparency: Communicate AI components, potential impacts, and ethical considerations to stakeholders, ensuring informed participation","venue":null,"work_id":"4fb151a5-429a-429d-8186-acfd3c8ae56e","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.357344Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:f34d01bcf066436e22f3e9f0ccb608579cf7d9b641073d22be148d85f4257a07","observation_id":"8728d6de-d106-4257-8c83-7b59d1ffbdb2","resolution":{"observed_at":"2026-08-07T11:32:28.487864Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:28.183461Z","title":"Artificial intelligence in information systems research: A systematic literature review and research agenda,","venue":null,"work_id":"a82eac20-ed7d-47aa-9fd7-c7a488c0cd9e","year":2021},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.396792Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:f26b0ec7de0a0e702870bd05030f7ebe726abf46c0b3d50b5ce584f4e7b0c5ef","observation_id":"dd5177f2-86bb-42a2-8c33-b8e9f98393f3","resolution":{"observed_at":"2026-08-07T11:32:28.272373Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:28.042667Z","title":null,"venue":null,"work_id":"af43abf1-3f14-470e-bef7-0e80ac18137d","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.469298Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:6af6decba497a688ff163cf0856f40e2d7ae65b8772361df39492791182cd23f","observation_id":"98b12271-f7a3-4a68-813d-fc8021bc7e96","resolution":{"observed_at":"2026-08-07T11:32:28.124248Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:25.026746Z","title":"Data Issues in Industrial AI System: A Meta-Review and Research Strategy,","venue":null,"work_id":"23f513b5-75bb-4621-86e5-3c982108a5b3","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.996593Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:49e26c04d5412a2630bbe52f68e493c1f5a8f9d0cadef6d4927686f5e67677c9","observation_id":"e997c000-c926-491b-9c4d-7ce305731c4c","resolution":{"observed_at":"2026-08-07T11:32:25.067481Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:24.922019Z","title":"Collaboration Challenges in Building ML -Enabled Systems: Communication, Documentation, Engineering, and Process,","venue":null,"work_id":"acf030dd-d4a4-4d21-886a-d24a1e6e1ae0","year":2022},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.074630Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:c3b5cafcc753a2da86d73eb9eaa04008963ec6b1e1b689d7207fabf5c8f45660","observation_id":"657ffa81-d87e-4f33-b37c-eb1c8f8da821","resolution":{"observed_at":"2026-08-07T11:32:24.976789Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:27.478263Z","title":null,"venue":null,"work_id":"0dbf2547-fa25-4713-9a52-a8ef67f86445","year":2021},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.687072Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:2c9220cf69e417c508ce9a4860b90373b243b86167190c56d41489103252a5f4","observation_id":"5693e406-c2a1-4507-8602-5f52b1cdf15f","resolution":{"observed_at":"2026-08-07T11:32:27.653180Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:27.288649Z","title":"Making Sense of AI Systems Development,","venue":null,"work_id":"93924231-e834-482a-92b1-3048e91e197a","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.764437Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:55d1c89392dbf8b58d2bf88ca997e5fe437347e16626e0bc85fd11287092a8a0","observation_id":"119baff1-94ba-4643-b07b-b85ef27fbe27","resolution":{"observed_at":"2026-08-07T11:32:27.371903Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:24.333838Z","title":"The Root Causes of Failure for Artificial Intelligence Projects and How They Can Succeed: Avoiding the Anti-Patterns of AI,","venue":null,"work_id":"1521fad0-16d1-48a2-b672-efced4429678","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.275987Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:5724429db1bf64c3578c9f2cc3d51eb5709d431766bc96360ec3897ab35b404e","observation_id":"b9975a64-b0c4-475a-98cf-ebfde4976cf4","resolution":{"observed_at":"2026-08-07T11:32:24.416642Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:24.244754Z","title":"Requirements Engineering in Machine Learning Projects,","venue":null,"work_id":"d34148c5-9204-437b-8bb0-b3f04aff6ec2","year":2023},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.355728Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:679888d505607a45a0cb8853f013df180e0b46b70e6faf27f07581dabaf0499e","observation_id":"84d5b378-ca2d-4304-b58d-e7bf4b9c6750","resolution":{"observed_at":"2026-08-07T11:32:24.277739Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:31.371211Z","title":null,"venue":null,"work_id":"af0ced95-a6b3-42ae-8129-591a9088da5e","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:11.751704Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:075469e8a70274277362de83ac7328aecb87ec223896777d2fa8d14755112875","observation_id":"51191b06-0cd1-4a2d-85b5-5278cfaa1e05","resolution":{"observed_at":"2026-08-07T11:32:31.431779Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:26.798896Z","title":"Which Project Management Methodology is better for AI -Transformation and Innovation Projects?,","venue":null,"work_id":"bc435098-7716-4977-9bc6-671635384bdb","year":2021},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:13.956877Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:c37f97a7f3e885cca30dbdb9166e032f393b58c6dade37d7102b97c09262066f","observation_id":"da28c9c4-6546-4e8b-9cbb-aacee936a344","resolution":{"observed_at":"2026-08-07T11:32:26.845885Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:26.692609Z","title":"Ready for Managing AI Projects? An Analysis of AI Project Management Frameworks,","venue":null,"work_id":"495e3f73-f9d6-4314-b401-4f792b493a41","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.071979Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:9ca93a4ed4c5d5c9c9cc0277b3cee4201f1fc90d16c206cec9a9e675399ad162","observation_id":"6b0e269d-70f8-49ff-b4d8-e486a24afcfd","resolution":{"observed_at":"2026-08-07T11:32:26.750724Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:26.537833Z","title":"New Intel® Geti ™ Software Platform Brings the Power of AI to the Entire Team,","venue":null,"work_id":"85d0e2c4-43b9-483a-80b7-97201e3f3143","year":2022},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.125785Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:56e6292ce186eb4c38838dcf60394e9cbc1d8768ccb1d0130f6c827c7749513d","observation_id":"f86e6455-a241-45e0-8317-74d1b7e91f88","resolution":{"observed_at":"2026-08-07T11:32:26.602016Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:26.192932Z","title":"Intel Geti GitHub,","venue":null,"work_id":"9f79f465-593b-4095-a3bc-a3858b4b5a63","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.216770Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:8945295059e467e4e124cb5e9684de618593f6f99fa512073dc944b3370156e9","observation_id":"baa16c5e-965c-4af8-b462-4805ee67a9d6","resolution":{"observed_at":"2026-08-07T11:32:26.284621Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:25.982177Z","title":"OpenVINO,","venue":null,"work_id":"bc80cd7b-4f90-4296-96c5-7383c37c6571","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.303441Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:85f6441cc7579b15e75310c092f76e29a25a007bb711b7273816e56d147eabe3","observation_id":"cd251b63-c205-457a-9b6c-5085218146fd","resolution":{"observed_at":"2026-08-07T11:32:26.076241Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:31.228653Z","title":"black box problem","venue":null,"work_id":"ecdfab69-6c62-412a-8ee1-9bd5210e14ed","year":1981},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:11.854919Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:d6fec430b33670752f1f9d192c1bb33fcef0d92913d8c1e2feb5d46a1568d79c","observation_id":"72a3f31e-7751-43c0-832d-ef86230fdd54","resolution":{"observed_at":"2026-08-07T11:32:31.311383Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:25.844049Z","title":"OpenVINO™ Training Extensions,","venue":null,"work_id":"25d49dc8-227a-4065-89aa-0d80461afb4d","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.412074Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:9289f979c2fb8f2131a761f34aab48b400a8c29c40dae3f7b5ce8d4f4acc8eb6","observation_id":"bf19307f-7ac3-47a8-82df-3b490716bbdd","resolution":{"observed_at":"2026-08-07T11:32:25.914969Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:25.652820Z","title":"Datumaro,","venue":null,"work_id":"7cdd4487-37ba-4ee9-a868-4574c7f5bd6b","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.556053Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:4a3f25e3a4a58e8afce41854542df1b5b761ce5a7da84f5a3645e6fd29b6c766","observation_id":"2af278eb-d1b0-481f-809f-3960452df758","resolution":{"observed_at":"2026-08-07T11:32:25.749373Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:25.521839Z","title":"Anomalib: A Deep Learning Library for Anomaly Detection,","venue":null,"work_id":"84c3f9da-a41e-40c2-bbf9-4b1cc11230ce","year":2022},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.635420Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:34f8d6e88f0ac1103d8a16ea314b7f4630a82809cd38828650637a2e34808abe","observation_id":"c6a185d7-3731-44ac-a8fa-f7af30f40a96","resolution":{"observed_at":"2026-08-07T11:32:25.580417Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:25.383375Z","title":"Anomalib,","venue":null,"work_id":"dfb87b80-612d-44cd-8da1-199fc69823ff","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.725053Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:f0ba69ba2d7c8a6039dd355d40d44cda707cc122b67da9c422c05f114b120924","observation_id":"d7110e8d-da0e-410c-ac11-f7b7d3325673","resolution":{"observed_at":"2026-08-07T11:32:25.434685Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:25.275698Z","title":"OpenVINO™ Explainable AI Toolkit - OpenVINO XAI,","venue":null,"work_id":"feac190d-a5d9-4c9e-88ae-8bf221c0ce42","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.830224Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:2410feb1e920044a90cab2d72fc7d05edfea631566329b1d12356298b9d2a8d3","observation_id":"66d21d6c-e736-49e6-b6c0-95029547e460","resolution":{"observed_at":"2026-08-07T11:32:25.322578Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:25.123197Z","title":"Data Collection and Quality Challenges in Deep Learning: A Data -Centric AI Perspective,","venue":null,"work_id":"77f6a0c6-60da-4fca-8ac2-0a851aa7dd54","year":2023},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:14.925177Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:09def144cfe6f0dd2af2662d6240820589b3f290cbb2c33cac1430e90f8f4384","observation_id":"c75da970-5ad9-42d2-9210-1bae687c6da8","resolution":{"observed_at":"2026-08-07T11:32:25.205076Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:21.590829Z","title":"Algorithmic progress in language models,","venue":null,"work_id":"f183dbd3-3465-4773-9ade-d2bff05f260d","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.534562Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:189ae7f1ad558c7ec4e811d1586c1e16612399438818b6bba75db712a11c7da9","observation_id":"a4ff8a03-4a5b-4801-8ef0-3657777d6841","resolution":{"observed_at":"2026-08-07T11:32:21.684159Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:30.411853Z","title":null,"venue":null,"work_id":"6c55871a-9e80-4035-bc6a-0ca02f4d3dd1","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.283121Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:9a9a7b3cc6b97513f3358d47b2c76b4964eaf91487522cec977af3738f2307be","observation_id":"c13913b8-0ebd-4a61-bcff-19060d42288d","resolution":{"observed_at":"2026-08-07T11:32:30.494739Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:30.242097Z","title":"Domain Recommendations AI Quality Standards and Transparency: Establish clear quality standards for AI -powered software deployments","venue":null,"work_id":"8a5a55e0-cac6-421a-8854-32f17615e66e","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.357231Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:d633bfd92689a18d704d5c2afb3af6ac40d200c5dd17e48c1d4eca2e7981a2dc","observation_id":"d632dc1b-393a-4f06-96f9-d8212d4cc34c","resolution":{"observed_at":"2026-08-07T11:32:30.315138Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:24.789292Z","title":"Sammicheli, Scrum in AI: Artificial Intelligence Agile Development with Scrum and MLOps, Leanpub, 2023","venue":null,"work_id":"989b23e8-990e-4d37-b24f-ddfd2e986586","year":2023},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.143865Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:d55f75fe2632a6048e5efd4b471c3caffa5cf7b4e6bfdc78a8a085f16fcb1698","observation_id":"b4f344ea-1edc-4744-9461-cff13b09d2d5","resolution":{"observed_at":"2026-08-07T11:32:24.857004Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:24.532842Z","title":"Analysis of Software Engineering for Agile Machine Learning Projects,","venue":null,"work_id":"74f31c9f-180d-4f2d-b1f2-314caae1ff7e","year":2019},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.223564Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:10197a2a999a07bb29814b8f0bbd95addfd784e69095dcf80265e9d4b8da4dc6","observation_id":"f7e32603-8ec6-4349-8f24-c7c5d578cd23","resolution":{"observed_at":"2026-08-07T11:32:24.652287Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:29.522690Z","title":"The AI research parts are less predictable and may span over a few agile sprints or rapidly change direction","venue":null,"work_id":"7aca41c8-6de9-4df9-bc4e-eec4360c0f82","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:12.800394Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:70c5c0330e536e0df81608ea85e998c58bef800730dd0dd3473b1b4fef130e9c","observation_id":"1c550f0f-7b73-4b2b-baa0-5aaf27109c83","resolution":{"observed_at":"2026-08-07T11:32:29.571759Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:24.031226Z","title":"Requirements Engineering for Machine Learning: A Review and Reflection,","venue":null,"work_id":"4bd021fb-e0e8-4e2e-a00f-8784ffe8e50a","year":2022},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.426991Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:05d588ebb9ae56f82e17b441443f2b35259a3344bff2bcfac2fab2f0560a0347","observation_id":"3be9d4a9-4be1-46e8-a651-1b660dbc781f","resolution":{"observed_at":"2026-08-07T11:32:24.123940Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:23.816955Z","title":"Machine learning with requirements: A manifesto,","venue":null,"work_id":"48048db2-c180-43cc-b8fd-d652abfd19e9","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.507638Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:bd1ebc910d59ec8497ba0ffc8feb0f781c4dd3b595e800607af342e8a99396ce","observation_id":"a464c204-7436-4402-a68c-70f31388591e","resolution":{"observed_at":"2026-08-07T11:32:23.911826Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:23.673836Z","title":"Ahmad, M","venue":null,"work_id":"d41059d1-e574-44d4-857d-369c5e3c61b8","year":2023},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.590289Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:ca0fe16d7d013d51dcc2e817c1764fc2d5c6bda75af1ad9f638640850e3c86d5","observation_id":"1c8bbe2a-c67e-4534-b646-cf378e1f8b85","resolution":{"observed_at":"2026-08-07T11:32:23.745228Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:23.497497Z","title":"How does Machine Learning Change Software Development Practices?,","venue":null,"work_id":"85a5393f-76b4-48b6-a5be-fc682d1371c6","year":2021},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.688459Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:28c329c6fed53dd6ac17694264aee2ce19ee94c780cd1d4778ad62561bfb8a15","observation_id":"6c69462c-e56a-4c04-b471-b67c6668d5ce","resolution":{"observed_at":"2026-08-07T11:32:23.604095Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:23.296230Z","title":"Piorkowski, S","venue":null,"work_id":"e7509fd7-73e1-4b0b-a7d5-8bde22117180","year":2021},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.774068Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:0b18e3e138b6030f09096c0808ca4222ef4d004dac0042fb9c46882aadbab167","observation_id":"8daddc63-8f52-4de0-9962-84fcedc53f15","resolution":{"observed_at":"2026-08-07T11:32:23.407151Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:23.136911Z","title":"Top 10 Ethical Considerations for AI Projects [Blog post],","venue":null,"work_id":"05b8b52e-1871-4982-97e8-bd7ffc3493a9","year":2025},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.886754Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:5a1f3a3fe3d4dc39a509fa4a30a04c3f31a1b99ac80e783495b132f72a771e6b","observation_id":"d84ed53c-e94e-4281-b2cd-652e6722d781","resolution":{"observed_at":"2026-08-07T11:32:23.213830Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:22.948228Z","title":"Ethically Aligned Design: A Vision for Prioritizing Human Well -being with Autonomous and Intelligent Systems – Version II Request for Input,","venue":null,"work_id":"ccd0c374-000e-4f5c-94c8-a4fc3594f6e7","year":2018},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:15.965552Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:b753add826f4794ef6fe1ecc56dfc724d4a129b331afbd6bb851ad4fd6231f98","observation_id":"249a5299-0481-4848-9712-1d1a1147316c","resolution":{"observed_at":"2026-08-07T11:32:23.044120Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:22.767087Z","title":"OECD AI Principles overview,","venue":null,"work_id":"57bad4aa-7687-4a5e-aea2-3010d071108d","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.073137Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:577e0c1d0e63329df8fc38d74075f982d42453380286f1f7acca3f91798a52de","observation_id":"fd66526d-fa4b-48ac-b382-188ce3bb699a","resolution":{"observed_at":"2026-08-07T11:32:22.854778Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:22.571803Z","title":"Ethics guidelines for trustworthy AI,","venue":null,"work_id":"8fbea5a1-d514-4bfc-a27a-f1285d775e64","year":null},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.141860Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:cc8315423cf4b00a419ea071f648f42f7c2d0597b7bd126f2425d66f38fdb30c","observation_id":"fc954d03-565d-4dc0-ac21-40cfe0c0d8c4","resolution":{"observed_at":"2026-08-07T11:32:22.650367Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:22.396030Z","title":"Comparing PMBOK and Agile Project Management software development processes,","venue":null,"work_id":"70699e38-9dbf-4b0f-bdde-368f5e96320b","year":2008},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.216020Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:ff428a3f994624bf10ea63e113123db37314d76342cd3928685a33d12beee122","observation_id":"1056e216-5c0f-4095-98ca-4ad475bb5911","resolution":{"observed_at":"2026-08-07T11:32:22.481843Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:22.242161Z","title":"State -of-the-Art Review of Taxonomies for Quality Assessment of Intelligent Software Systems,","venue":null,"work_id":"a51b34ca-c710-48d3-add4-69b96dae02fa","year":2022},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.295118Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:7bd8504221402d9efb409115b25154443d0070030c3b7eab7248516df22f157c","observation_id":"00f5d0ce-2705-42a3-bbee-1c3ce4d6facd","resolution":{"observed_at":"2026-08-07T11:32:22.303271Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:22.028796Z","title":"Evaluating Large Language Models: A Comprehensive Survey,","venue":null,"work_id":"83442721-79ad-4853-a922-b6fab8009237","year":2023},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.358011Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:8ce12bf0289b7f250bc77d848b134786588d9acf74cad4b32f96ed60e6a6eb81","observation_id":"59caac78-cfcc-4387-bdf3-ab2427445628","resolution":{"observed_at":"2026-08-07T11:32:22.123426Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:21.802719Z","title":"A survey of safety and trustworthiness of large language models through the lens of verifcation and validation,","venue":null,"work_id":"ab10bd04-c2a7-4f00-91bc-62b9b76fe33d","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.453995Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:5dc547661576e113235dc20c0136e7facfd472084e9ec6c59c0fe6093949d297","observation_id":"ad5ddf97-245d-40aa-aea8-f13dd8459e95","resolution":{"observed_at":"2026-08-07T11:32:21.904972Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:21.416976Z","title":null,"venue":null,"work_id":"2bae7233-8704-4fde-9582-d4d463a0c4d6","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.623677Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:bfe6d80a027b939009b077e5df58dc3aa705e6ff3467a46dd51842f577862b2d","observation_id":"54af6f94-c04e-48f3-a3eb-2f70a271ee7a","resolution":{"observed_at":"2026-08-07T11:32:21.510703Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:21.121790Z","title":"Continuous experimentation on artificial intelligence software: a research agenda,","venue":null,"work_id":"a7b62862-7ef1-490b-b556-7740df013cc5","year":2020},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.724557Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:b63f85988a7340d764628127ae490a588a654f82563d960348dceaae47a738e2","observation_id":"13cc56c4-d7b3-4f75-a30d-81bdbfe8ae59","resolution":{"observed_at":"2026-08-07T11:32:21.257376Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:20.899743Z","title":"AI Risk Management Framework,","venue":null,"work_id":"4b9441f5-d713-448a-b80f-4711e185e218","year":2023},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.811861Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:5f8072c30425a8ba9377b522695ad86896ac36de2f88b056f31441ce9e629fdf","observation_id":"239ee350-d7b2-4c1d-9fd5-c6d327d66c61","resolution":{"observed_at":"2026-08-07T11:32:21.012369Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:20.675116Z","title":"Quality issues in machine learning software systems,","venue":null,"work_id":"733d29c3-3690-4c34-af7d-d17b7d5ff557","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:16.948634Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:114eb5a7ee2fd215816c45de36c1bb5bec309aa77717ecc78ec298f90d2fc0b3","observation_id":"726fc2ea-6c28-47df-b1a5-370131deb98c","resolution":{"observed_at":"2026-08-07T11:32:20.781834Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:20.400182Z","title":"Agile, Traditional, and Hybrid Approaches to Project Success: Is Hybrid a Poor Second Choice?,","venue":null,"work_id":"b7979232-226a-4f01-bb83-ba01f3275fef","year":2020},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.047869Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:d13d1ff00df77cb1f6a3fd397e747c37a194ceadaeb5362e2964e62af037b587","observation_id":"ec22b164-3ab9-4f3c-a133-1b834a39ad2f","resolution":{"observed_at":"2026-08-07T11:32:20.523123Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:20.173814Z","title":"One size does not fit all: Choosing the right project approach,","venue":null,"work_id":"fbeb461e-8246-4ffc-94dc-920cad671c80","year":2014},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":64,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.167257Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:2907eee8b8e16b6bed298c0577579423154c6125972346d0cb922b2715e8327f","observation_id":"3da7b014-25ed-4120-84db-fcb2710ec1af","resolution":{"observed_at":"2026-08-07T11:32:20.286711Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:19.916135Z","title":"Towards CRISP -ML(Q): A Machine Learning Process Model with Quality Assurance Methodology,","venue":null,"work_id":"5a7cfbdc-3236-412e-855d-7179ecd8479b","year":2021},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":65,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.257826Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:1585cc259c875455b7938a0613eab681fc48725408a4a1e003f2d405b7bed1e0","observation_id":"6c4bd33c-c103-412e-a20b-d6c81264e1b8","resolution":{"observed_at":"2026-08-07T11:32:20.051287Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:19.656162Z","title":"Software Engineering for Machine Learning: A Case Study,","venue":null,"work_id":"099d9dd3-de3c-43e6-a092-a88b013cdd45","year":2019},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":66,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.394103Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:30f1ec622ecefa5254c4ace8147ae73fd54afaea7f6fb01091684f5e022dce08","observation_id":"0c8ee01a-47a8-441f-b7c6-d0ec7447f55f","resolution":{"observed_at":"2026-08-07T11:32:19.769113Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:19.472854Z","title":"Human -AI Collaboration in Data Science: Exploring Data Scientists' Perceptions of Automated AI,","venue":null,"work_id":"f2f86f79-5243-496f-adfb-7f65d1b5264c","year":2019},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":67,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.499874Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:2a5b54edc29da41e5c8e488a2daf8ea20638fa0dc02f9488e7d06ed20f54d542","observation_id":"d54cc9d8-73a5-4efd-9e75-456def94389b","resolution":{"observed_at":"2026-08-07T11:32:19.545428Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:19.284980Z","title":"Assuring the Machine Learning Lifecycle: Desiderata, Methods, and Challenge,","venue":null,"work_id":"71d485c4-b6f6-4235-b083-36eccf60ec08","year":2021},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":68,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.605067Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:6057e912e95049a5d3a8775b52e6ee71cc34db37bbd4f45b0cb0d15ed97869d1","observation_id":"b75e3d8d-7522-4b7b-a817-f916458e0d9c","resolution":{"observed_at":"2026-08-07T11:32:19.371306Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:19.095131Z","title":"Artificial intelligence in operations management and supply chain management: an exploratory case study,","venue":null,"work_id":"fbfd0833-74d8-4b66-acb2-5ade3c644023","year":2022},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":69,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.711473Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:ed94b9ed8536a060689cd6f7ea2efd2cc78c8488780a12967e113631636b158b","observation_id":"95271a8c-123e-4071-8c5a-24b361e89966","resolution":{"observed_at":"2026-08-07T11:32:19.200336Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:18.853899Z","title":"From DevOps to MLOps: Overview and Application to Electricity Market Forecasting,","venue":null,"work_id":"afbc0c7b-9650-44f3-8258-bba9d5cc8336","year":2022},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":70,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.823334Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:086ea51bdc61681c5078104b23978937479837bad9e4862aa97703f9bece7d28","observation_id":"e82c4f9d-a569-4b8a-83b6-8ce559828ae5","resolution":{"observed_at":"2026-08-07T11:32:18.956756Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:18.592812Z","title":"AI and Privacy Risks: The EU AI Act vs. US NIST AI Risk Management Framework, TTLF Working Papers No. 125,","venue":null,"work_id":"d409f602-d3f1-4049-a1a9-7727c4ad6b61","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":71,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.907354Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:fac5ad9eb807e8cdbbf4a22839d893816a3846d89fb4b10cf38ab474e31dd363","observation_id":"6f569067-66d2-4615-abd0-dbfe4dae4796","resolution":{"observed_at":"2026-08-07T11:32:18.719855Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:18.381286Z","title":"Amazon Scraps Secret AI Recruiting Tool that Showed Bias against Women,","venue":null,"work_id":"1d905447-5732-49cc-b712-5666000a9c03","year":2022},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":72,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:17.974885Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:9dc9771be5f3578741b099d37c22244d12b92df938f002e3c0f5954be221d0f8","observation_id":"b2f75c9b-8ac2-4603-980b-fac2e8caa0be","resolution":{"observed_at":"2026-08-07T11:32:18.465460Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T11:32:18.230103Z","title":"Artificial Intelligence Index Report 2024,","venue":null,"work_id":"b2f6cf26-c54a-415e-b35d-1be6a71da44e","year":2024},"citing_paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects","version":1},"reference_index":73,"source":"pdf_text","source_observed_at":"2026-08-07T11:32:18.118565Z"},"links":{"citing_paper":"/paper/2506.02214"},"observation_digest":"sha256:c672cc5248f564b546a79163e1b5ceb6166ec08364149b8ac95223833b0c169a","observation_id":"d56c3133-a4e2-47f8-b7b1-9e995dc5728d","resolution":{"observed_at":"2026-08-07T11:32:18.291859Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2506.02214","last_updated":"2025-06-02T19:54:54Z","latest_version":1,"primary_category":"cs.SE","snapshot_observed_at":"2026-08-07T11:26:04.500796Z","submitted_at":"2025-06-02T19:54:54Z","title":"Is PMBOK Guide the Right Fit for AI? Re-evaluating Project Management in the Face of Artificial Intelligence Projects"},"reference_resolution":{"displayed":73,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":8,"verified_exact":0,"verified_fuzzy":65},"total_outbound_references":73},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 73 of 73 outbound references and 0 inbound Pith citation observations for arXiv:2506.02214."}